
Technical Support: 01905 560 219 5Order: 01905 823 299 |orders.akw-ltd.co.uk
5
WOODEN FLOOR INSTALLATION
Wooden Floor Installation
Position the tray over the desired
location for the shower and outlet
pipe. Mark around the edge
of the shower tray.
The waste area must be supported
with additional noggins, 220 mm
around the waste. Additional
noggins or joists must be used on
all tray edges and between joists
centres at a minimum of 355 mm.
For ‘in’ oor installation, cut into
the ooring, taking care not to cut
through supporting joists or any
plumbing or electrical wiring.
Install the waste drain trap and
waste outlet pipe. Do not cut into
the joists, always drill through
when connecting to
the waste outlet pipe.
Attach the waste trap to the tray
with the waste clamping ring, see
separate waste instructions.
Apply a waterproof membrane to
the whole of the showering area,
see manufacturers instructions.
Carefully remove the oor boards
and locate the waste outlet pipe.
For ‘on’ oor installation, remove
the oor boards around
the waste area.
Water test the waste drain trap for
ow and any leaks. Ensure that the
rubber seal is in place.
Remove any debris and ensure
that there are no sharp edges or
raised areas and check levels.
Safety ooring or tiles should nish
ush up to the edges of the tray
and sealed with sealant. Protect
the waste trap from debris
during installation.
Apply grab adhesive to all the
contact points between the tray,
joists and noggins. Lower the tray
over the waste position and rmly
secure the tray into position and
check all 4 sides are level again.