
2Subject to change without notice | 83059600gUK – Translation of the original operating manual | ait-deutschland GmbH
Table of contents
1 About this operating manual ................................ 3
1.1 Validity .............................................................................. 3
1.2 Reference documents............................................. 3
1.3 Symbols and markings........................................... 3
1.4 Contact............................................................................. 4
2 Safety .......................................................................................... 4
2.1 Intended use ................................................................. 4
2.2 Personnelqualications......................................... 4
2.3 Personal protective equipment.......................... 4
2.4 Residual risks............................................................... 4
2.5 Disposal........................................................................... 5
2.6 Avoid material damage........................................... 5
3 Description............................................................................. 6
3.1 As-delivered condition............................................ 6
3.2 Design............................................................................... 6
3.3 Accessories................................................................... 7
3.4 Function........................................................................... 7
4 Operation and care........................................................ 7
4.1 Energy and environmentally aware
operation ......................................................................... 7
4.2 Care.................................................................................... 8
5 Delivery, storage, transport and
installation............................................................................... 8
5.1 Scope of supply .......................................................... 8
5.2 Storage............................................................................. 8
5.3 Unpacking and transport....................................... 8
5.4 Installation ...................................................................... 9
6 Installation and connection..................................10
7 Attach the side panel, the rear panel, the
cover and the front panel....................................... 11
8 Installation of hydraulic system........................ 11
9 Electrical installation................................................... 12
10 Flushing,llingandventing................................. 12
10.1 Heating water quality............................................. 12
10.2 Flushing,llingandventingtheheating
circuit ............................................................................... 13
11 Insulation of hydraulic connections.............. 13
12 Settingtheoverowvalve..................................... 13
13 Commissioning ................................................................ 14
14 Maintenance....................................................................... 14
14.1 Basic principles......................................................... 14
14.2 Maintenance as required..................................... 14
14.3 Annual maintenance .............................................. 14
14.4 Check the evaporator and the condensate
pan and clean them, if required ......................15
14.5 Cleaningandushingthecondenser..........15
15 Malfunctions........................................................................15
16 Dismantling and disposal ......................................15
16.1 Dismantling.................................................................. 15
16.2 Disposal and recycling..........................................15
Technical data/scope of supply........................ 17
Performance curves / operating limits / heating18
Performance curves / cooling .......................... 19
Dimensional drawings ...................................... 22
Installation plans .............................................. 26
Hydraulic integration options............................ 33
Circuit diagrams ............................................... 37
EC Declaration of Conformity .......................... 42