manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. ANTAIRA
  6. •
  7. Laboratory Equipment
  8. •
  9. ANTAIRA INJ-0200G-at-24 Series User manual

ANTAIRA INJ-0200G-at-24 Series User manual

Other manuals for INJ-0200G-at-24 Series

1

Other ANTAIRA Laboratory Equipment manuals

ANTAIRA INJ-C200G-bt-T User manual

ANTAIRA

ANTAIRA INJ-C200G-bt-T User manual

ANTAIRA LNP-201AG-T User manual

ANTAIRA

ANTAIRA LNP-201AG-T User manual

ANTAIRA INJ-0200G-at-24 Series User manual

ANTAIRA

ANTAIRA INJ-0200G-at-24 Series User manual

Popular Laboratory Equipment manuals by other brands

Radleys Carousel 6 Plus instructions

Radleys

Radleys Carousel 6 Plus instructions

Hemotherm 400MR Operation & technical manual

Hemotherm

Hemotherm 400MR Operation & technical manual

mrclab DVO Series Operation manual

mrclab

mrclab DVO Series Operation manual

CoolLED pE-800 quick start guide

CoolLED

CoolLED pE-800 quick start guide

Luminex Guava easyCyte Maintenance Guide

Luminex

Luminex Guava easyCyte Maintenance Guide

IKA A10 basic operating instructions

IKA

IKA A10 basic operating instructions

Belden HIRSCHMANN RPI-P1-4PoE installation manual

Belden

Belden HIRSCHMANN RPI-P1-4PoE installation manual

Koehler K1223 Series Operation and instruction manual

Koehler

Koehler K1223 Series Operation and instruction manual

Globe Scientific GCM-12 quick start guide

Globe Scientific

Globe Scientific GCM-12 quick start guide

Getinge 86 SERIES Technical manual

Getinge

Getinge 86 SERIES Technical manual

CORNING Everon 6000 user manual

CORNING

CORNING Everon 6000 user manual

Biocomp GRADIENT MASTER 108 operating manual

Biocomp

Biocomp GRADIENT MASTER 108 operating manual

Cole Parmer Stuart SB3/1 instruction manual

Cole Parmer

Cole Parmer Stuart SB3/1 instruction manual

BEVS 2501/2A user manual

BEVS

BEVS 2501/2A user manual

Qiagen DML 3000 user manual

Qiagen

Qiagen DML 3000 user manual

Queensgate NANOSCAN OP400 Quick start instructions

Queensgate

Queensgate NANOSCAN OP400 Quick start instructions

Parr Instrument 4560 Operating instructions manual

Parr Instrument

Parr Instrument 4560 Operating instructions manual

Integra DOSE IT operating instructions

Integra

Integra DOSE IT operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Antaira Technologies
INJ-0200G-at-24 Series
Industrial Gigabit PoE+ Injector –
1*10/100/1000Base-T(X) with PoE-PSE (30W/Port) +
1*10/100/1000Base-T(X), Booster Version
Quick Installation Guide
Version 1.0
(May 2020)
Tel: 1-844-268-2472
Fax: 1-714-671-9944
www.antaira.com
19020000000138
Package Check List
The package contains the following items:
1 – Quick installation guide
1 – INJ-0200G-at-24(-T)
1 – Wall mounting bracket set with screws
1 – DC cable –18 AWG & DC jack 5.5 x 2.1mm
Front Panel Layout
Top Panel View
INJ-0200G-at-24 series top panel is equipped with one 4-pin
removal terminal block connector for dual DC power inputs
(12~55VDC).
Product Overview
System Interface/Performance
10/100/1000BaseT Power over Ethernet Injector
IEEE 802.3af/at Compliant PoE
Provides Power Feeding up to 30 Watts
Power booster technologies for low voltage power inputs
Power Input & Connection
DC 12 to 55V redundant power, with a 4-pin removal
terminal block
Operating Temperature
Standard operating temperature model: -10°C to 65°C
Extended operating temperature model: -40°C to 75°C
Case/Installation
IP30 protection
DIN-Rail and Wall mount design
LED Indicators
LED Color Description
Power Green On Power input 1 or 2 is active
Off Power input 1 and 2 is inactive
PoE Green On The port is supplying power to the powered-device
Off No powered-device attached or power supplying fails
Quick Installation
Ethernet Ports
RJ45 Ports (Auto MDI/MDI-X)
All RJ45 ports are auto-sensing for 10Base-T, 100Base-TX or
1000Base-T device connections. Please follow the wiring pin
assignment table below for Ethernet port installation.
RJ45 Ethernet Port Pin Outs
Pins T568A Color T568B Color 10Base-T,
100Base-TX 1000
Base-T(X)
Pin 1 white/green stripe white/orange stripe Rx+ TP0+
Pin 2 green solid orange solid Rx- TP0-
Pin 3 white/orange stripe white/green stripe Tx+ TP1+
Pin 4 blue solid blue solid unused TP2+
Pin 5 white/blue stripe white/blue stripe unused TP2-
Pin 6 orange solid green solid Tx- TP1-
Pin 7 white/brown stripe white/brown stripe unused TP3+
Pin 8 brown solid brown solid unused TP3-
Grounding Screw
Terminal Block
4-pin Removal Terminal Block
For Power Inputs
Power LED
PoE LED
10/100/1000Base-T(X)
PoE+ Copper Port
10/100/1000Base-T(X)
Copper Port
Figure 3
Power Inputs Wiring
Please follow the steps below to insert the power wire:
1. Insert the positive and negative wires into the PWR1
(V1+, V1-) and PWR2 (V2+, V2-) contacts on the
terminal block connector as shown below in Figure 4.
2. Tighten the wire-clamp screws to prevent the wires from
loosening, as shown below in Figure 5.
V1-V1+ V2- V2+
Figure 1Figure 2
Industrial PoE injector Mounting
DIN-Rail Mounting
The DIN-Rail bracket is pre-installed on
the industrial PoE injector from the
factory. Please refer to Figure 3for a
DIN-Rail bracket installation reference.
Follow the steps below for installing the
industrial PoE injector on the DIN-Rail
track:
1. Insert the top of the DIN-Rail onto
the track as shown belowin Figure 4.
2. Lightly pull down the bracket onto
the rail as shown below in Figure 5.
3. Check if the bracket is mounted tightly on
the rail.
4. To remove the industrial PoE injector from the rail, do the
opposite from the steps above.
Figure 4
Wall Mounting
Follow the steps below to mount the industrial PoE injector using
the wall mounting bracket as shown in Figure 6.
1. Remove the DIN-Rail bracket from the industrial PoE
injector by loosening the screws.
2. Place the wall mounting brackets on the top and bottom of
the industrial PoE injector.
3. Use the screws to screw the wall mounting bracket on the
industrial PoE injector.
4. Use the hook holes at the corners of the wall mounting
bracket to hang the industrial PoE injector on the wall.
5. To remove the wall mount bracket,
do the opposite from the steps
above.
Field Maintenance and Service
If the device requires servicing of any kind, the user is
required to disconnect and remove it from its mounting. The
initial installation should be done in a way that makes this as
convenient as possible.
Voltage/power lines should be properly insulated as well as
other cables. Be careful when handling them so as to not trip
over.
Do not under any circumstance insert foreign objects of any
kind into the heat dissipation holes located in the different
faces of the device. This may not only harm the internal
layout, but might cause harm to the user as well.
Do not under any circumstance open the device for any
reason. Please contact your dealer for any repair needed or
follow the instructions within the manual.
Warranty Policy
Products supplied by Antaira Technologies are covered in this
warranty for sub-standard performance or defective
workmanship. The warranty is not, however, extended to goods
damaged in the following circumstances:
Warranty Conditions
(a) Excessive forces or impacts
(b) War or an Act of God: wind storm, fire, flood, electric shock,
earthquake
(c) Use of unqualified power supply, connectors, or
unauthorized parts/kits
(d) Replacement with unauthorized parts
Customers shall always obtain an authorized "RMA" number
from Antaira before shipping the goods for repair or
replacement.
RMA and Shipping Costs Reimbursement
•Within the warranty period (based on the invoice date), all
parts and labor are free of charge to the customers.
•Customers are responsible for the cost of parts and labor, if
the products are out of warranty.
•For RMA service, customers are responsible for the shipping
expense for shipping the RMA unit(s) to Antaira. Antaira is
responsible for the shipping expense via a ground service
for the return repair/replace unit(s) back to customers.
Antaira would not be held responsible for any consequential
losses from using Antaira’s product.
Limited Liability
5-Year Warranty
Warranty Period
Antaira’s Customer Service and Support
•Antaira’s Technical Service & Support Centers:
+ 844-268-2472 (Antaira US Headquarter)
+ 48-22-862-88-81 (Antaira Europe Office)
+ 886-2-2218-9733 (Antaira Asia Office)
•Antaira’s Web Sites & Repair/Support Emails:
www.antaira.com / support@antaira.com
www.antaira.eu / info@antaira.eu
www.antaira.com.tw / info@antaira.com.tw
*Any changes will be announced on the Antaira website.
Figure 6
Figure 5