B-Link SEMACONNECT 7 Series User manual

Series 7, 7+, 8, 8+
INSTALLATION MANUAL

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
Table of Contents
SAFETY AND COMPLIANCE.................................................................................................................................3
GENERAL........................................................................................................................................................................ 4
STATEMENTS ................................................................................................................................................................. 4
SYSTEM REQUIREMENTS...................................................................................................................................5
GENERAL REQUIREMENTS............................................................................................................................................. 5
ELECTRICAL REQUIREMENTS ......................................................................................................................................... 6
STATION CONNECTION DIAGRAMS............................................................................................................................... 8
COMMUNICATION REQUIREMENTS.............................................................................................................................. 9
NETWORK PLATFORM REQUIREMENTS ........................................................................................................................ 9
HARDWARE INVENTORY SPECIFICATION AND INSTALLATION........................................................................... 10
PEDESTAL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM(CMS)......................................................................... 10
PEDESTAL MOUNT WITH CABLE MANAGEMENT SYSTEM (CMS) ............................................................................... 17
WALL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM (CMS) ............................................................................... 28
WALL MOUNT WITH CABLE MANAGEMENT SYSTEM (CMS) ...................................................................................... 35
START-UP ....................................................................................................................................................... 47

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
Safety and Compliance
This document provides instructions to install the SemaConnect Charging Station and should not be used for any
other products. This product must be installed in accordance with the National Electrical Code (NEC), the
Canadian Electrical Code (CEC) or any applicable local code.
Review this manual and consult a licensed contractor and/or electrician before installation to ensure compliance
with local building practices, climate conditions, safety standards, and state and local codes.
The SemaConnect Charging Station should be installed by a licensed contractor/ electrician and inspected by a
qualified installer prior to initial use. Under no circumstances will compliance with the information in this manual
relieve the user of responsibility to comply with all applicable codes and safety standards.
This document describes the most common installation and mounting methods. Contact SemaConnect Inc. where
it is not possible to perform an installation using the procedures provided in this document.
SemaConnect Inc. is not responsible for damages that may occur or result from installations that are not described
in this document. This document is not offered as a formal design document. All designs for the installation of this
product are the sole responsibility of the appropriately licensed and/or certified installing contractor.
The following signs are used throughout the installation manual following ANSI Z535 Standard:
Sign
Intended Use
Situation will result in serious injury or death
Situation could result in serious injury or death
Situation could result moderate or minor injury
Situations that at worst will result in property damage and will not result in physical injuries
NOTE: MAKE SURE TO TURN OFF AL L BREAKERS BEFORE DOING ANY ELECTRICAL WORK!

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
General
The SemaConnect Station is grounded through a dedicated conductor to the ground connection at the power
distribution panel. This equipment has been tested and found to comply with the limits for a Class A digital device,
pursuant to Part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful
interference when the equipment is operated in a commercial environment.
The equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in
accordance with the instruction manual, may cause harmful interference to radio communications.
Statements
Reasonable effort has been made to ensure that the specifications and other information in this manual are accurate
and complete at the time publication. However, specifications and other information in this manual are subject to
change at any time without prior notice.
Use of the SemaConnect Charging Station in a manner not intended or any modification not approved by the
manufacturer will void the limited warranty. Other than the limited product warranty provided by SemaConnect, this
manual and the SemaConnect Inc. products are provided “AS IS,” and SemaConnect Inc. expressly disclaim all implied
warranties, including any warranty of design, merchantability, and fitness for a particular purposes and non-
infringement, to the maximum extent permitted by law.
IN NO EVENT SHALL SEMACONNECT INC. OR ITS AUTHORIZED DISTRIBUTORS BE LIABLE FOR ANY INDIRECT, INCIDENTAL,
SPECIAL, PUNITIVE, OR CONSEQUENTIAL DAMAGES, INCLUDING WITHOUT LIMITATION, LOST PROFITS, LOST DATA, LOSS OF
USE, COST OF COVER, OR LOSS OR DAMAGE TO THE SEMACONNECT CHARGING STATION ARISING OUT OF OR RELATING TO
THE USE OR INABILITY TO USE THIS MANUAL, OR RELATED PRODUCT, EVEN IF SEMACONNECT INC. OR ITS AUTHORIZED
DISTRIBUTORS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
All products or services mentioned are the trademarks, service marks, registered trademarks, or registered service
marks of their respective owners. This material is protected by the copyright laws of the United States and other
countries. It may not be modified, reproduced, or distributed without the prior, express written consent of
SemaConnect, LLC.

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
System Requirements
General Requirements
SemaConnect EV charging stations require a solidly grounded electrical system with the presence of a main bonding jumper
or system bonding jumper. Ungrounded sources or impedance grounded sources of any type (resistor/reactor) are not
suitable for SemaConnect EV charging stations.
SemaConnect EV charging stations require 240 volt (phase to phase) or 208 volt (phase to phase) input with an equipment
grounding conductor. A grounded conductor (neutral conductor) is not required. All breakers must be non-GFCI breakers.
Anchoring detail is the responsibility of others. Anchoring must be capable of minimum weight and height in accordance with
the provided table. Any seismic, wind-loading and/or snow-loading considerations increasing weights or wind-profile of unit
will be the responsibility of others.
WEIGHT
(LBS)
HEIGHT
(INCHES)
SERIES 7 - 18' OUTPUT CABLES
36
20.5
SERIES 7 - 25' OUTPUT CABLES
41
20.5
SERIES 8 - 18' OUTPUT CABLES
36
24
SERIES 8 - 25' OUTPUT CABLES
41
24
SERIES 7+ - 18' OUTPUT CABLES
36
20.5
SERIES 7+ - 25' OUTPUT CABLES
41
20.5
SERIES 8+ - 18' OUTPUT CABLES
36
24
SERIES 8+ - 25' OUTPUT CABLES
41
24
SERIES 7, 7+, 8, 8+ PEDESTAL
7.7
37.4
SERIES 7, 7+, 8, 8+ Wall Mount Bracket
7.7
18.1
SERIES 7, 8 CABLE MANAGEMENT SYSTEM
75.5
70.6
SERIES 7+, 8+ 80 CABLE MANAGEMENT
SYSTEM
86.6
70.6

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
Electrical Requirements
Each SemaConnect EV charging station is listed and labeled through Nationally Recognized Testing Laboratory compliance
testing at the maximum or ‘full rated’ output. Each station is capable of continuous full rated output up to its labeled rating or
modified default output configurations in accordance with the following tables:

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
Station Connection Diagrams
DUAL SOURCE INPUT SINGLE SOUCE INPUT

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
Communication Requirements
SemaConnect EV charging stations require cellular connectivity to function properly. To enable cellular connectivity, please
reference the following cellular carriers and minimum operational signal requirement at each SemaConnect EV charging
station location:
Verizon
4G LTE
Band 13
RSRP: -95 dBm
RSRQ: -13 dB
Band 4
ATT
4G LTE
Band 2
Band 4
Band 5
Band 12
Band 13
RSRP: -95 dBm
RSRQ: -13 dB
SemaConnect stations do not use 5G cellular or Wi-Fi communication protocols.
Network Platform Requirements
To enable modified output configurations or load management configurations, SemaConnect must be notified during
station Start-up/enrollment. Failure to do so may result in nuisance breaker tripping and/or system damage. Refer to Start
Up section of this manual for details.

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
HARDWARE INVENTORY SPECIFICATION AND INSTALLATION
PEDESTAL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM(CMS)

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
Pedestal Mount Inventory Specification

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
1. INSTALL ANCHOR PLATE
VERIFY ALL CONDUCTORS ARE DE-ENERGIZED

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
2. REMOVE ACCESS PANEL COVER AND INSTALL PEDESTAL WITH ACCESS PLATE OPENING FORWARD-FACING
VERIFY ALL CONDUCTORS ARE DE-ENERGIZED

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
3. INSTALL CHARGING HEAD UNIT
Refer to General Requirements section for station weights
VERIFY ALL CONDUCTORS ARE DE-ENERGIZED. COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4. SEE SYSTEM
REQUIREMENTS SECTION FOR CONNECTION DETAILS.
RE-INSTALL ACCESS PANEL COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS.

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
4. INSTALL CABLE RACK

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
5. INSTALL CABLE HOLSTERS
Note: A 8" (200 MM) SHANK, 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING
STATION.

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
PEDESTAL MOUNT WITH CABLE MANAGEMENT SYSTEM (CMS)

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
Pedestal Mount with Cable Management System Inventory Specification

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
1. INSTALL ANCHOR PLATE
VERIFY ALL CONDUCTORS ARE DE-ENERGIZED

Copyright ©2022 SemaConnect, LLC. All rights reserved. dwfwdfwfwfwfwffffgd www.SemaConnect.com
2. REMOVE ACCESS PANEL COVER AND INSTALL PEDESTAL WITH ACCESS PLATE OPENING FORWARD FACING
VERIFY ALL CONDUCTORS ARE DE-ENERGIZED