Baker Double Notcher User manual

66
B
Ba
ak
ke
er
r
D
Do
ou
ub
bl
le
e
N
No
ot
tc
ch
he
er
r
U
Us
se
er
r
M
Ma
an
nu
ua
al
l
Ellington Industrial Supply, Inc.
P. O. Box 128
Ellington, Missouri 63638 USA
Phone: (573) 663 – 7711 Fax: (573) 663 – 2787
Equipment Photo
T
TM
M

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
2
TABLE OF CONTENTS
1 INTRODUCTION 3
Machine Purpose 3
Machine Function 3
Definition of Terms 4
Manual Contents Notice 5
Machine Specifications and Requirements 5
Warranty 6
Defective Parts 7
Service Policy 7
2 RULES FOR SAFE OPERATION 8
Safety Expectations for Operating Power Equipment 8
Control of Hazardous Energy – (Lockout / Tagout) 9
Machine Safety Decals 10
3 MACHINE FEATURES 11
4 SET-UP 12
Receiving and Inspection 12
Unpacking 12
Machine Positioning 12
Power and Utilities Requirements 12
Operator Training 13
5 OPERATION 14
Operator Control Station 14
Adjusting the Table Top 15
Adjusting for Notch Depth 16
Adjusting Notch Location 16
Adjusting for Material Length 17
Adjusting for Material Height 18
Adjusting the Width of the Material Bin Hopper 19
To Begin Processing Material 20
Proximity Switches 21
Pusher Speed Adjustment 22
Pusher Stroke 23
Clearing Lumber Jams 24
6 MAINTENANCE 25
General Clean Up 25
Inspection and Preventative Maintenance Checklist 25
Checking Cutters 26
Cutter Inserts 26
Replacing 2-sided Carbide Inserts 26
Replacing Radius End Cutter Disc Inserts 27
Replacing Belts 28
Air Assembly 29
7 PARTS AND SERVICE 30-32
Service Contact Information 32
Serial Number Location 32

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
3
INTRODUCTION
Thank you and congratulations on the purchase of your new Baker Double Notcher. It has
been designed to be durable, productive and easy to use. When properly ran and maintained, it
will provide you with many years of profitable operation.
For safety reasons, and for your own best use of the Baker Double Notcher, we insist that you
read this manual fully, and constantly review and refer back to it as necessary.
`
No one should attempt to operate or perform maintenance on this equipment until they have
taken the time to read and understand the information contained in this manual.
** FAILING TO DO SO MAY RESULT IN SERIOUS INJURY **
Machine Purpose
The Baker Double Notcher was designed and manufactured for high production, capable of
4,000 pusher cycles per hour.
Machine Function
Your Baker Double Notcher is equipped with a quick infeed descrambler, enclosed table for
operator protection, replaceable cutter tips and 10-inch exhaust duct. Easily accessible and
simple to use hand cranks allow for quick and accurate cutter head positioning and notcher
depth setting.

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
4
Definition of Terms
All Stop Safety button (typically “red”) designed to immediately shut-down machine
operation
Board Foot or
Board Feet A form of measurement where one board foot equals the volume of a board 1
inch thick by 12 inches wide and 12 inches long (1” x 12” x 12” = 1 board foot)
CFM (cubic feet
per minute) A measure of the volume of a substance flowing through air within a fixed
period of time
Chip Breaker A secondary blade fitted above or behind the cutting edge and used to dampen
vibration and deflect shavings up and through the escape
Descrambler A conveyor system that arranges and positions boards for sequential feeding
into a processing station, such as the Baker double notcher
Edge Guide A straight edge that is used to guide a 3-sided flitch along a piece of material
End Stop A mechanism designed to stop the progress of an off-loading board
Fence (Arm) A straight guide used to keep a log, cant or board a set distance from a blade
or cutter
Infeed The side of the machine where the work piece (stringer, board, etc.) enters
Insert An interchangeable carbide cutter (insert) that is used on an indexable cutter
head assembly to create a notch in a stringer to allow fork tine entry
Lockout / Tagout Requires authorized employee(s) to lock and tag the energy-isolating device(s)
to prevent the release of hazardous energy in order to prevent injury to
employees, normally while performing maintenance or repairs
Notch A cutout in the lower portion of the stringer to allow for fork tine entry
Notched Stringer A stringer with two notches spaced for fork tine entry
Off-load The side of a machine where the work piece (stringer, board, etc.) exits
Production Rate A produced or processed quantity measure with respect to another measured
quantity of time; for example number of boards per minute, board feet per hour,
per day, per week, etc.
Radius End
Cutter Disc A circular shaped carbide cutter that is used on the outside corner of an
indexable cutter head assembly to create a rounded edge of the notch
Schematic A structural or procedural diagram, typically of an electrical or hydraulic system
Stringer A continuous, longitudinal, solid or notched beam component of the pallet used
to support deck components

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
5
Manual Contents Notice
This manual is not totally comprehensive. It does not and cannot convey every possible
safety and operational problem that may arise while using this machine. The manual will
cover many of the basic and specific safety procedures needed in an industrial
environment.
All federal and state laws and any regulations having jurisdiction covering the safety
requirements for use of this machine take precedence over the statements in this manual.
Users of this machine must adhere to such regulations.
Machine Specifications and Requirements
Power
• (Two) 30 HP (22 kw)
TEFC Motors (one per
cutter head)
• 1 HP (.75 kw) TEFC
Motor for descrambler
Operating Air Pressure
• 120 psi 1/2” (13mm) 30
CFM
* Pushers are air driven with
electrical controlled travel
limit switches
Cutting Capacity
Material Size:
• 2x4’s; 4x4’s; 4x6’s length
• 28 in up to 76 in (71 cm
to 193 cm) standard
Notch Depth
• 0” (0 mm) min.
• 3” (76 mm) max.
Notch Length
• 9” (229 mm) standard
Dimensions & Weight
Length: 90” (229 cm)
Width: 101” (256 cm)
Height: 78” (198 cm)
Table-top Height: 35” (89 cm)
Weight: 4,000 lbs (1,814 kg)
Production Rate
• Pusher cycles 4,000 per hour
Cutters
• (Two) 12” (305 mm) diameter x
9” (229 mm) long with indexable,
replaceable tips in 1/2” (13mm)
segments - standard
Arbors
• (Two) 2 ½” (64 mm) diameter x
10” (254 mm) long
Sawdust Removal
• 10” (254mm) outlet; min. 3,600
CFM suction recommended at
dust removal chute

Baker Double Notcher - Rev 2; 09/07 WWW.BAKER-ONLINE.COM
6
Warranty
Ellington Industrial Supply, Inc. machinery is warranted against defects in material or
workmanship starting from the date of shipment from the manufacturing plant.
This warranty is given solely to the “original purchaser” of the equipment and is in no
way to be expressed or implied that it is transferable to any other parties without the
written consent and approval from the CEO or Sales Manager of Baker Products.
Our one (1) year warranty period covers all items built at our manufacturing facilities
including structural frame, cowlings, doors, shafting, dust chutes and guards.
We honor six (6) months of warranty coverage for miscellaneous vendor-purchased-
supplied items including bearings, chain, sprockets, hydraulic components, etc.
Ninety (90) days of warranty coverage is provided on all electrical parts. All electrical
components and wiring has been installed in accordance with the National Electrical
Code (NEC) of the United States of America.
Ellington Industrial Supply, Inc. does not warranty this machine to meet any other
requirements or jurisdiction of any electrical or safety codes of any other state,
municipality, other country or jurisdiction The purchaser assumes all risk and liability
whatsoever resulting from the use thereof whether used singularly or in conjunction with
other machinery or apparatus, including, but not limited to, all matters resulting from
sawdust generation.
Note: No warranty is provided on any electrical components or parts if equipment is
powered or connected to a roto-phase electrical converter in order to create a three
phase power supply for operational current from a single phase source.
Any change in materials, design, or performance intended to improve any product of
Ellington Industrial Supply, Inc. shall not obligate Ellington Industrial Supply, Inc. to
modify any previously manufactured equipment.
This manual may contain details that if not properly followed can affect the performance
of your equipment. You are responsible for proper use and maintenance of your
equipment and we reserve the right to deny warranty work if deemed to be caused by a
lack of proper maintenance or negligence by the owner or any of their employees.

Baker Double Notcher - Rev 2; 09/07 WWW.BAKER-ONLINE.COM
7
Defective Parts
Parts claimed defective must be returned freight prepaid, to our plant in Ellington,
Missouri. Any part determined defective due to faulty workmanship or materials will be
replaced or repaired (at our option) free of charge, F.O.B. our plant. This warranty does
not cover expendable items (i.e. drive belts, index-able cutter head inserts, chip
breakers, wedge blocks or mounting hardware, etc.). Except as expressly provided
herein, this warranty is in lieu of all other warranties, expressed or implied, including a
warranty of merchantability or fitness for a particular purpose. This warranty is “void” if
any part of the unit has been tampered with, modified, altered, or operated with parts
other than supplied or recommended by Ellington Industrial Supply, Inc. In no event
shall Ellington Industrial Supply, Inc. be liable for special, indirect, incidental or
consequential damages, however arising, including but not limited to, the loss of
earnings or the cost of downtime.
Service Policy
In the event that you have any problems, call us at (573) 663-7711 any time between
8:00 AM and 5:00 PM (CST), Monday through Friday. A member of our trained staff will
answer any questions you may have. We charge nothing for this service.
The only charge is for replacement parts not covered by warranty or after our inspection
we deem that the problem is due to operator error or lack of proper maintenance or
neglect.
If it is necessary for a member of our service department to visit your plant at your
request, there will be a charge for this service. Call our service department for current
prices.
Retain this Information for your Records
Model Number: ………………………………………...………………………….
Serial Number: …………………………………………………………………….
Date of Purchase: …………………………………………………………………
Power Source:…………..…………………….……………………………………
Dust Removal: ….……………………………………………………………….…
Ellington Industrial Supply, Inc.
P. O. Box 128
Ellington, Missouri 63638 USA
Phone: (573) 663 – 7711 Fax: (573) 663 – 2787

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
8
RULES FOR SAFE OPERATION
The purpose of safety symbols and signage is to draw your attention to real or possible
hazardous conditions that may exist when operating this equipment. Please remember that
safety symbols and signage alone do not eliminate danger and are not substitute for proper
training and education regarding operational hazards.
SAFETY EXPECTATIONS FOR OPERATING POWER EQUIPMENT
ALWAYS…
• ENSURE THAT TRAINED PERSONNEL OPERATE, MAINTAIN AND REPAIR THIS EQUIPMENT
• TURN POWER OFF AND LOCKOUT / TAGOUT PRIOR TO PERFORMING MAINTENANCE
• KEEP WORK AREA CLEAN AND WELL LIGHTED TO MINIMIZE OR ELIMINATE HAZARDS
• KEEP CHILDREN AND VISITIORS AWAY FROM OPERATING EQUIPMENT
• OPERATE THE EQUIPMENT AT THE RATE IT WAS DESIGNED FOR
• KEEP GUARDS IN PLACE WHEN OPERATING EQUIPMENT
• REMOVE TOOLS BEFORE RESUMING OPERATION
• USE PROPER EXTENSION CORD
• WEAR PROPER APPAREL AND AVOID LOOSE CLOTHING AND ACCESSORIES THAT COULD
GET CAUGHT IN MOVING PARTS
• ALWAYS WEAR SAFETY GLASSES AND HEARING PROTECTION
• AVOID “KICK-BACK” BY KNOWING WHAT CONDITIONS CAN CREATE IT
• CHECK DAMAGED PARTS AND REPAIR OR REPLACE THEM IMMEDIATELY
NEVER…
• LEAVE MACHINERY RUNNING OR UNATTENDED, ALWAYS TURN POWER OFF
• OPERATE EQUIPMENT WHEN TIRED, FATIGUED OR UNDER THE INFLUENCE OF DRUGS OR
ALCOHOL
• ALLOW UNTRAINED PERSONNEL TO OPERATE, MAINTAIN OR REPAIR THIS EQUIPMENT
This symbol and warning indicates a potentially hazardous
situation, which, if not avoided, will result in death or serious injury.
This symbol and warning indicates a potentially hazardous
situation, which, if not avoided, could result in death or serious
injury.
This symbol and warning indicates a potentially hazardous
situation, which, if not avoided, may result in minor or moderate
injury.
This warning provides notice and instruction regarding a potentially
hazardous situation, which, if not avoided will result in serious injury
o
r
deat
h.
No list of safety expectations can ever be complete as every work environment is as
different as are the people operating the equipment.
Always keep safety as your highest priority and always use this machine with caution
and res
p
ect.

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
9
Control of Hazardous Energy – (Lockout / Tagout)
Lockout / Tagout (LOTO) refers to specific practices and procedures to safeguard employees
from the unexpected energy, startup of machinery/equipment, or the release of hazardous
energy during service or maintenance activities.
This requires that a designated individual turn off and disconnect the machinery/equipment
from its energy source(s) before performing service or maintenance and that the authorized
employee(s) lock and tag the energy-isolating device(s) to prevent the release of hazardous
energy and take steps to verify that the energy has been isolated effectively.
List of Related Terms
Affected
Employee An employee whose job requires them to operate a machine or piece of
equipment on which service or maintenance is being performed.
Authorized
Employee A person who locks or implements a tagout system procedure on machines
or equipment to perform service or maintenance on that machine or
equipment. An authorized employee and an affected employee may be the
same person when the affected employee's duties also include performing
service or maintenance.
Energy
Source Any source of electrical, mechanical, hydraulic, pneumatic, chemical, thermal,
or other energy.
Lockout The placement of a lockout device (such as a lock) on an energy-isolating
device, in accordance with an established procedure that ensures the device
and the equipment cannot be operated until the lockout device is removed.
Servicing
and / or
Maintenance
Workplace activities such as constructing, installing, setting up, adjusting,
inspecting, modifying, maintaining or servicing machines or equipment.
These activities include lubrication, cleaning or un-jamming of machines or
equipment, and making adjustments or tool changes where the employee
may be exposed to the unexpected energy, start-up of equipment or release
of hazardous energy.
Tagout The placement of a tagout device (such as a tag) on an energy-isolating
device, in accordance with an established procedure that ensures the device
and the equipment may not be operated until the tagout device is removed.
The Fatal Five Main Causes of
Lockout/Tagout Injuries
1. Failure to stop equipment
2. Failure to disconnect from a power
source
3. Failure to dissipate (bleed, neutralize)
residual energy
4. Accidental re-starting of equipment
5. Failure to clear work areas before re-
starting
Example of lockout tags,
lockout hasp and keyed lock

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
10
Machine Safety Decals ** Adhere to ALL Safety Warnings! **

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
11
MACHINE FEATURES
We want to highlight the unique and special features of the Baker Double Notcher.
Heavy-duty steel construction
Powerful electric motors, one per cutter head
Air driven material “pusher” with electrical controlled travel limit switches
Infeed un-scrambler keeps material flow steady while reducing labor
Easy to set-up and simple to adjust
Highly automated and extremely productive
Baker Double Notcher
Ladder bar chain
Cutter-head notch
positioning adjuster
Table height adjustment
for setting notch depth
10-inch dust chute
Feed bin hopper
30-hp electric motor for each
of the two cutter heads Heavy-duty steel
construction
Descrambler
drive motor

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
12
SET-UP
Receiving and Inspection
Upon receipt and prior to signing transport carrier’s documents, conduct a walk-around
and visual inspection of your new equipment. Note any damage in writing upon the
carrier’s bill of lading and contact us immediately.
Note: All new equipment is assembled and thoroughly tested prior to shipment, however
damage may occur during transit, which could cause the machine to not operate correctly
during start-up.
Unpacking
If machine was delivered via flatbed trailer or container, remove straps or chains securing
it in place.
Remove lag screws, strapping, etc. that attaches the machine to the deck.
Transport machine to the installation site.
Machine Positioning (Placement, Leveling, Alignment)
For optimum performance, designate a solid and level foundation that is covered and dry,
free of environmental elements such as rain or snow that could cause electrical or slip
hazards.
We recommend you anchor the machine to the floor with the bolts in the foot pads.
Provide a minimum of 3 feet of clear workspace in front of the electrical panel.
Provide a minimum of 15 feet of clear workspace in front of in-feed and off-load areas.
Power and Utilities Requirements
For safe and effective operation confirm your incoming voltage and available
amperage is equal to what the machine has been wired for at the factory.
A qualified electrician should complete electrical connections and check
for correct motor directional rotation.
Ensure all wiring, electrical connections and air hoses are located in a safe position
and away from any hazardous conditions.
Proper cutter rotation should be toward infeed of machine (front).
The “pusher” air pressure should be set at 120 psi.
Efficient dust and chip removal requires a minimum of 3,600 CFM suction at the
machine dust removal chute. This is an end user/owner responsibility.
Note: Failure to provide proper vacuum or suction may result in damage to machine or
operations personnel.

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
13
Operator Training
According to many OSHA, ANSI, STATE, and LOCAL CODES, it is the EMPLOYER’S
RESPONSIBILITY to:
Permit only trained and authorized employees to operate and maintain
equipment.
Inspect and maintain guards, safety devices and start/stop controls.
Instruct, train and supervise the safe method of work.
Be sure personnel are properly trained and safety rules are clearly understood before
operating or performing maintenance.
Operator
Machine
Guards
Devices
Instructions
F
FR
RE
EE
E
T
TR
RA
AI
IN
NI
IN
NG
G
O
ON
N
P
PR
RO
OP
PE
ER
R
S
SE
ET
T-
-U
UP
P
A
AN
ND
D
O
OP
PE
ER
RA
AT
TI
IO
ON
N
I
IS
S
A
AV
VA
AI
IL
LA
AB
BL
LE
E
O
ON
N
S
SI
IT
TE
E
A
AT
T
T
TH
HE
E
M
MA
AN
NU
UF
FA
AC
CT
TU
UR
RE
ER
R’
’S
S
F
FA
AC
CI
IL
LI
IT
TY
Y
A
ll five (5) of these listed items together make
up the safety system. Failure of any one of
these factors will increase accident potential.

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
14
OPERATION
Operator Control Station
Prior to cycling any controls, ensure the area is clear of personnel and obstructions. Make
certain anyone required to work near the notcher is aware that the machine is in operation.
** It is the operator’s responsibilities to ensure these safety conditions exist **
Descriptions
• All Stop - Button designed to immediately shutdown machine operation.
• Saw # 1 - Activates the first cutter head when illuminated.
Note: This is a 3-position switch that you must pull all the way up momentarily to start
the motor.
• Saw # 2 - Activates the second cutter head when illuminated.
Note: This is also a 3-position switch like Saw # 1 that requires you to pull it all the
way up momentarily to start the motor.
• Feed On / Off – Activates or de-actives the pusher.
• Descrambler On / Off – Activates or de-activates the descrambler.
• Jog On / Off – When switched on, the pusher is held in the starting or retracted
position.
Note: This function is used to allow the operator to remove jammed boards while the
pusher mechanism is held back to clear.
Fi
g
ure 14

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
15
Adjusting the Table Top
Raising or lowering the tabletop is controlled by a table height adjuster crank handle, located
on the left front side of the table on the in-feed end of the machine.
To raise the tabletop, loosen the two (2) adjustment nuts on the holding bolts that are
positioned on all four corners of the frame – eight (8) total.
Turn the table height adjustor crank clockwise (a left to right motion) to raise the table’s
height.
When raised to the desired height, position the holding bolts until they come in contact
with the bottom of the table, using the two (2) adjustment nuts.
To lower the tabletop, repeat the steps above, but turn the table height adjustor crank
counter-clockwise (a right to left motion).
Re-position the holding bolts and tighten the two (2) adjustment nuts located on each of
the four corners – eight (8) total.
Table Top
Adjustment Nuts
Notch Location
Adjusting Crank
Table Height
Adjustor Crank
Holding Bolt
Figure 15

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
16
Adjusting for Notch Depth
The cutters can be moved so that notches can be made to the depth you desire.
For deeper notches, move the four holding bolts down away from the tabletop and lower
the table via the table height adjustor crank (Figure 15, page 15).
For shallower notches, raise the table height via the table height adjustor crank.
After adjusting notch depth, move the four (4) holding bolts (one on each corner) so that
they touch the bottom of the tabletop. These holding bolts fully support the table when
completely lowered into the desired notch depth position. (Figure 15, page 15).
Adjusting Notch Location
The cutters can be moved for notching in different locations along the length of the stringer.
You will first need to raise the tabletop and ensure all wood is removed from the notcher
prior to adjusting the cutters.
Adjust cutter heads to desired notch spacing by turning the notch location adjustor crank
on the side of the machine (Figure 15, page 15).
The hand crank moves both cutters simultaneously and spaces them the same distance
apart, in or out, from the center of the machine.
Once the cutters are positioned to the desired notch space setting, the weight bars should
be arranged so that the center weight bar is centered between the cutter heads and the
outer weight bars are centered directly over each cutter head (Figure 16).
Fi
g
ure 16
Weight Bars

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
17
Adjusting for Material Length
The hopper guide rails are held in place by two (2) mounting bolts, one on each end of the
guides – four (4) total.
To adjust, loosen and remove the bolts.
For longer material, move the guide rails outward or away from the cutter heads.
For shorter material move the guide rails inward or toward the cutter heads.
Once the desired setting has been made, secure the guide rails by inserting the mounting
bolts and re-tightening them.
Note: The guide rails should be set close to the edge of the material, but not disrupt material
flow or create resistance.
Weight Bars
Hopper Guide
Rails
Figure 17

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
18
Adjusting for Material Height
The weight bars hold the material down so it is in contact with the table so that the exact
sized notches can be cut. They must be adjusted for stringer/board height.
Turn the machine off and lock-out / tag-out the electrical panel.
Unlatch the two (2) protective side panels and lower.
Unlatch and lift the two (2) top protective panels.
Two shafts support the weight bars. Loosen the shaft holding nuts on both ends of the
shaft (Figure 18).
Insert a piece of material you intend to notch in front of the weight bars and move the
shaft up or down so that the weight bars are set at the height of the material.
Now, lower the shafts so that the tops of the weight bars are 1/2” (13mm) below the top of
material to be notched. This will ensure constant pressure is applied to the material while
processing.
Retighten the shaft holding nuts on both ends of the shaft (Figure 18).
Lower and latch the two (2) top protective panels and raise and latch the two (2)
protective side panels.
Note: These steps must be repeated every time stringer/board height needs to be changed.
Figure 18
Weight Bars
Shaft Holding Nuts Side Panel
Shaft Holding Nuts

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
19
Adjusting the Width of the Material Bin Hopper
The material bin hopper allows both manual feed and optional descrambler feed to the
pusher to produce notched stringers. Stringers are stacked singularly in the feed bin hopper.
To properly set the material bin hopper depth, tighten or loosen the adjuster nuts
accordingly.
The opening between the bin and the backstop should be 1/2” (13mm) greater than the
thickness of the material being fed in order to avoid jamming. For example, if the width of
the material is 1 ½” (38mm), set the bin width or depth to 2” (50mm).
Figure 19
Back Stop
Adjuster Nuts
Feed Bin Hopper

Baker Double Notcher - Rev 2, 09/07; WWW.BAKER-ONLINE.COM
20
To Begin Processing Material
Complete a visual inspection to ensure all guards/covers are in place and secure.
Raise tabletop to clear cutter heads prior to starting motors.
Turn on electrical power via the main electrical panel.
Turn on air supply.
Pull up on the ALL STOP button until it illuminates (Figure 20).
Pull up on the SAW # 1 button to start the first cutter head. Wait until the motor starts and
is running at full speed, then pull up on the SAW # 2 button to start the 2nd cutter head.
Lower table top to the desired cutting position / depth.
Turn the feed switch to the ON position.
If your machine is equipped with a descrambler deck, turn the DESCRAMBLER switch to
the ON position.
Load the descrambler with material.
Note:If you have a hopper feed, an arrangement of the proximity switches (Page 21) tells
the conveyor to stop when a certain amount of wood is in the hopper. When the wood falls
below a certain level, the conveyor will start feeding the hopper again automatically.
Note: Also always remember to raise the table when shutting off the motors.
Fi
g
ure 20
Table of contents
Other Baker Industrial Equipment manuals
Popular Industrial Equipment manuals by other brands

RYNO WORX
RYNO WORX RY10MS Operator's manual

Alfalaval
Alfalaval GJ PF-FT instruction manual

Oriental motor
Oriental motor EZ limo EDR36D-K operating manual

Alfalaval
Alfalaval T6 instruction manual

Harmonic Drive
Harmonic Drive HFUS-2A Series engineering data

Master Trimmers
Master Trimmers MT Dry 200 Instructions for use and maintenance

Self Climat
Self Climat DN 50 Fitting and operating instructions

Flex-A-Seal
Flex-A-Seal VANTAGE Series Installation, operation, maintenance guide

Haufftechnik
Haufftechnik MIS 60D installation instructions

Entrematic
Entrematic Ditec VALHHFM installation manual

Strack
Strack PMOK-V04 operating instructions

Ebmpapst
Ebmpapst G4D180-GF20-01 operating instructions