Bals VARIABOX User manual

Installation and operating manual VARIABOX
60003205
Issue 11.2016
2016-11-10
EN
EN

(11.2016)
2 / 20
Table of contents
1 About this manual 3
1.1 Structure of the warnings 3
1.2 Symbols used 4
1.3 Signal words used 4
2Intended use 5
3General safety instructions 6
4Packaging and transport 7
4.1 Packaging 7
4.2 Transport 7
5Design and function 8
6Installation and operation 10
6.1 Changing the opening direction of the housing cover 10
6.2 Wall mounting 11
6.3 Connecting the supply cable 13
6.4 Routine inspections 15
7Cleaning and care 16
8Faults and their rectification 17
9Decommissioning and disposal 19
Installation and operating manual VARIABOX

Installation and operating manual VARIABOX
About this manual
This manual
– describes the installation and operation of the VARIABOX of Bals Elektrotechnik GmbH & Co.
KG
– is an integral part of every VARIABOX and must be kept in safe custody during the product ser-
vice life
– must be read carefully and understood before use and any work.
Structure of the warnings
The following picture illustrates the structure of a sample warning.
1
1.1
1 Hazard-specific symbol
2 Signal word
3 Type and source of the hazard
4 Possible consequences of failing to comply
5 Procedure for avoiding hazards
EN
(11.2016)
3 / 20

Symbols used
General warning of a hazardous area
Warning – dangerously high voltage
Notice
Signal words used
All warnings in this manual are clearly highlighted. The following signal words are used for warnings:
DANGER Warns of dangers which will lead to serious injuries or to death if the instructions are not follo-
wed.
WARNING Warns of dangers that may lead to serious injuries or to death and/or cause considerable dama-
ge to property if the instructions are not followed.
CAUTION Warns of dangers that may lead to reversible injuries and/or considerable damage to property if
the instructions are not followed.
NOTICE Warns of dangers that may lead to operational disruptions and/or considerable damage to pro-
perty. Damage to the environment, too, may occur if the instructions are not followed.
1.2
1.3
Installation and operating manual VARIABOX
(11.2016)
4 / 20

Installation and operating manual VARIABOX
EN
(11.2016)
5 / 20
Intended use
The VARIABOX is used as a power distributor indoors and outdoors as a wall combination or as a por-
table distributor.
The VARIABOX is built for professional use. The installation and the fixed connection to the mains
supply should be carried out only by trained and qualified experts.
Any use going beyond the intended use is considered to be improper. The manufacturer is not liable
for damages resulting from improper use. Any such risk shall be borne solely by the user.
In case of unauthorised modifications or conversions, the CE conformity becomes null and void, and
thus, also all claims for warranty. Modifications may lead to risks for life and limb as well as damage
to the VARIABOX or loads connected.
Factory-fitted labels and markings on the VARIABOX should not be removed, modified or blurred.
Protect against foreign bodies and impact of weather
The VARIABOX complies with the protection degree IP44, IP54 or IP67 according to DIN EN 60529
(VDE 0470-1), (depending on the respective design, see Design and function [}8]). Each of these
mean:
– Protection degree IP44:
– Protected against solid bodies with a diameter beyond 1.0 mm, e.g. a wire
– Protection against water sprayed from all sides
– Protection degree IP54:
– Protected against dust in damaging quantity
– Complete protection against contact
– Protection against water sprayed from all sides
– Protection degree IP67:
– Dust-proof
– Complete protection against contact
– Protection against temporary immersion
If a VARIABOX with protection degree IP44 or IP54 is to be installed outdoors, we recommend also
installing a suitable weather protection roof, available in the accessories from Bals Elektrotechnik
GmbH & Co. KG.
2

General safety instructions
– Safe use is ensured only if this manual is followed completely.
– Before installation, commissioning or operation, read this manual thoroughly.
– The VARIABOX must be installed, maintained and put into operation in accordance with the
laws, ordinances and standards.
– Never cover the VARIABOX in order to avoid the heat being generated from getting trapped and
thus, the risk of a fire.
– Keep easily combustible and explosive materials away from the VARIABOX.
– Handle the cables with care
– by always pulling at the plug and not the cable when unplugging
– by preventing the cable from getting damaged mechanically
– by keeping intense heat away.
– Protect the housing from mechanical damage such as shocks and hard impacts.
– Never operate a defective VARIABOX.
– Avoid tripping hazards.
3
Environment
The following operating conditions
apply for the safe operation of the
product:
Size Value
Temperature –25 °C … +40 °C
Humidity 10 %rH … 90 %rH
Installation and operating manual VARIABOX
(11.2016)
6 / 20

Installation and operating manual VARIABOX
EN
(11.2016)
7 / 20
Packaging and transport
Packaging
Packaging materials are valuable raw materials and can be reused. The packaging materials of the VA-
RIABOX should therefore be brought to an appropriate recycling facility. If this is not possible, dispose
of the packaging materials according to the locally applicable regulations.
Transport
Check the delivery for completeness and integrity. If you identify transit damage or if the delivery is in-
complete, notify your dealer immediately.
4
4.1
4.2

Design and function
The following figure illustrates the typical design of a VARIABOX.
1 Housing
2 Housing cover
3 Captive housing screws
4 Prepared cable entries
5 Variable fasteners
6 Fuse panel
7 Toggle viewing window (OTC flap), fuse panel
8 CEE socket outlet
9 Domestic socket outlet
10 FI circuit breaker
11 Toggle viewing window (OTC flap), FI circuit breaker
Each VARIABOX consists of the components 1 to 5. All other components vary, depending on the de-
sign, in the quantity and type.
The nameplate on the left side of the housing displays the technical specifications of the VARIABOX,
as illustrated in the figure given below based on an example.
5
Installation and operating manual VARIABOX
(11.2016)
8 / 20

Installation and operating manual VARIABOX
EN
(11.2016)
9 / 20
2
3
4
5
11
10
9
8
1
6 7
1 Item number
2 Rated voltage
3 Rated current of the combination
4 Rated load factor
5 Product standard
6 Rated conditional short-circuit current
7 Rated impulse withstand voltage
8 Protection degree
9 Rated frequency
10 Dimensions
11 Weight

Installation and operation
The VARIABOX can be used as a wall combination or as a portable power distributor. In both cases,
the supply cable is connected in the same way (see Connecting the supply cable [}13]).
The OTC flaps can be locked securely with the lock fittings (available separately as accessories) at the
openings provided for this purpose. All VARIABOX housings can be sealed from the top to the bot-
tom.
Changing the opening direction of the housing cover
If the local conditions require that the housing cover's direction of opening needs to be changed, pro-
ceed as follows:
1. Loosen the captive housing screws and open the VARIABOX.
2. Loosen the screws (1), with which the hinges are fixed to the housing and remove the hinges.
3. Push the hinge piece to the side and replace the screw (1) in the borehole (maximum torque
1 Nm).
4. Loosen the screws (2), with which the hinges are fixed to the cover and remove the hinges.
5. Fix the hinges to the other side of the housing in the reverse order, and pay attention to the
marking ("A", "B").
6. Fix the hinge with screws to the cover (maximum torque 1 Nm).
ðIn this way, you have changed the direction of opening of the housing cover.
6
6.1
Installation and operating manual VARIABOX
(11.2016)
10 / 20

Installation and operating manual VARIABOX
EN
(11.2016)
11 / 20
Wall mounting
For use as a wall combination, the VARIABOX must be fixed with plugs and screws to the wall (fas-
tening set is available in our accessories).
You have two options available for this purpose. One option is to use the outer fastenings as descri-
bed below.
The other option is that the screw connection to the wall takes place through the threaded shafts for
the captive housing screws (Design and function [}8]). The shafts are intended for 6 mm screws.
1. Loosen the screws of the outer fastenings on the back side of the VARIABOX and push them
out either downwards or upwards.
2. Tighten the screws again.
3. Hold the VARIABOX against the wall and mark the boreholes.
6.2

4. Drill the holes and insert suitable plugs into them.
5. Fix the bottom screws in place. Make sure that the screw heads have sufficient clearance to
the wall, in order to hook in the VARIABOX.
6. Break out the cable entry provided for the supply cable and put the cable gland in place. The
supply cable can be routed either from the bottom or from the top into the VARIABOX.
7. Place the VARIABOX with the outer fastenings on the lower screws.
8. Fix the VARIABOX with screws to the four outer fastenings on the wall.
ðThis completes the wall mounting.
Connecting the supply cable
DANGER
Electrical voltage
The supply cable may carry high electrical voltage that is fatal. Pay attention to the five safety rules of
electricity:
1. De-energise.
2. Secure the supply from being switched on again.
3. Ensure the de-energised condition.
4. Connect to earth and short circuit.
5. Cover or cordon off adjacent live parts.
Choose the required cable cross-sections and line fuses based on the specifications given on the
nameplate (see Design and function [}8]).
1. Loosen the captive housing screws and open the VARIABOX.
2. Press the brackets of the supporting rails inside and pull the supporting rails out from the
front.
3. Strip the cable such that the sheath reaches about 1 cm wide through the cable gland in the
VARIABOX. Remove the insulation from the cable cores.
6.3
Installation and operating manual VARIABOX
(11.2016)
12 / 20

Installation and operating manual VARIABOX
EN
(11.2016)
13 / 20
4. Guide the stripped and uninsulated supply cable through the cable gland and below the sup-
porting rails up to the terminal strip. Once the cable length required for the wiring has been re-
ached, fix the cable gland with screws.
5. Press the brackets of the supporting rails inside and press the supporting rails back to their
original position.
6. Connect the cores to the terminal strip.
7. Close the cover of the VARIABOX and tighten the captive screws.
8. If necessary, switch the fuse elements and the FI circuit breaker on.

ðYour VARIABOX has now been installed completely and is ready for operation.
Routine inspections
Before each use
Check the device including the flaps and viewing window for any externally visible signs of damage. In-
form a qualified electrician if you identify any damage.
Every six months
If in the respective design of the VARIABOX an FI circuit breaker is installed, it must be tested regular-
ly. The test intervals depend on the specific application and may vary.
1. Put the switch lever to the "I" position.
2. Press the "T" test button.
ðThe FI circuit breaker trips and the switch lever jumps to the "0" position.
3. If the FI circuit breaker does not trip, the VARIABOX must be put out of operation. Inform an
electrician.
6.4
Installation and operating manual VARIABOX
(11.2016)
14 / 20

Installation and operating manual VARIABOX
EN
(11.2016)
15 / 20
Cleaning and care
It is recommended to clean the device as required. Use a dry cloth to clean the device. Use a wet cloth
if the device is very dirty.
DANGER
Electrical voltage
The device contains parts that carry hazardous voltage that may be fatal.
1. Pull out the plugs to the loads before cleaning them.
2. Make sure that the plug covers are closed.
3. Never use steam or water jet cleaners.
NOTICE
Damage to the plastic parts.
Corrosive cleaning agents may attack or destroy the plastic parts.
1. Use only a cloth moistened with water for cleaning.
7

Faults and their rectification
DANGER
Electrical voltage
The device contains parts that carry hazardous voltage that may be fatal.
1. Entrust all repair work to employees of specialist workshops.
2. Never operate a defective VARIABOX.
If one of the loads connected is no longer supplied with power, proceed as follows:
1. Pull out the corresponding plug from the VARIABOX.
2. Check whether the associated fuse element or the FI circuit breaker has tripped. If this is the
case, continue with step 3, otherwise inform a qualified electrician.
ðThis completes the troubleshooting here.
3. Unlock the OTC flap of the corresponding fuse element by operating the lever(s).
4. Open the OTC flap completely. In doing so, overcome the perceptible resistance until the flap
latches audibly in the completely opened position.
8
Installation and operating manual VARIABOX
(11.2016)
16 / 20

Installation and operating manual VARIABOX
EN
(11.2016)
17 / 20
5. Switch the fuse element or the FI circuit breaker on.
6. If the fuse element trips once again, the fault lies in the VARIABOX. Continue with step 7. If
the fuse elements are not tripping, continue with step 9.
7. Close the OTC flap by tapping it slightly. The flap locked securely with the pre-tensioned spring
mechanism.
8. Put the VARIABOX out of operation and notify your supplier immediately.
ðThis completes the troubleshooting here.
9. Insert the plug for the load once again. If the fuse elements trip again, then the fault lies in the
load or its supply cable.
10. Close the OTC flap by tapping it slightly. The flap locked securely with the pre-tensioned spring
mechanism.
11. Inform an electrician.
ðThis completes the troubleshooting here.

Decommissioning and disposal
Send a worn-out VARIABOX for recycling or for proper disposal. Always make sure to observe and fol-
low the local regulations.
The VARIABOX should not be disposed of in household waste. Environmental damage and risk to per-
sonal health are avoided with proper disposal.
9
Installation and operating manual VARIABOX
(11.2016)
18 / 20

Installation and operating manual VARIABOX
EN
(11.2016)
19 / 20

Bals Elektrotechnik GmbH & Co. KG
Burgweg 22
57399 Kirchhundem
GERMANY
Tel.: +49 27 23 / 7 71-0
Fax: +49 27 23 / 7 71-1 77
E-mail: [email protected]
Disclosure to third parties only with the consent of
Bals Elektrotechnik GmbH & Co. KG.
All rights reserved. Only valid at the time of printing. Update when reused.
Table of contents