6
EXCLUSIVE
b
Prior to ignition, make sure that the boiler is designed to operate with the
gas available; this can be checked by the wording on the packaging and
by the adhesive label indicating the gas type.
b
pressure, so the joints of the various elements must be airtight.
3.2 Installation regulations
with the following reference standards:
- UNI 7129-7131
- CEI 64-8.
Company and with possible municipal dispositions.
POSITION
EXCLUSIVE is a wall-hung boiler for heating and for the production of hot
water. There are two categories, depending on the type of installation:
-
pipe and pick-up of combustion air from the installation area. If the
boiler is not installed outdoors, the air intake in the installation area is
compulsory;
-
discharge pipe and pick-up of combustion air from outside.
It does not require an air intake point in the installation area.
discharge designed for condensing boilers with an airtight chamber.
The boiler can be installed indoor and outdoor, in a partially protected
range from -5°C to +60°C.
ANTI-FREEZE SYSTEM
actives when the water temperature in the primary circuit falls below 5°C.
This system is always active, guaranteeing boiler protection down to an
installation area temperature of -5°C.
b To take advantage of this protection, based on the burner
operation, the boiler must be able to switch itself on; any
lockout condition (i.e. due to a lack of gas or electrical supply,
or the intervention of a safety device) therefore deactivates the
protection.
Under normal operating conditions, the boiler can self-protect itself from frost.
In areas where temperatures may fall below 0°C, or when the machine is
left unpowered for long periods, you are advised to use a good quality anti-
freeze liquid in the primary circuit to avoid the risk of freezing if you do not
want to drain the heating system.
Carefully follow the manufacturer’s instructions with regards not only the
percentage of anti-freeze liquid to be used for the minimum temperature
at which you want to keep the machine circuit, but also the duration and
disposal of the liquid itself. For the hot domestic water part, we recommend
you drain the circuit. The boiler component materials are resistant to ethylene
available for boilers installed outdoors in a partially protected place.
MINIMUM DISTANCES (g. 6a-6b)
To ensure access to the boiler for normal maintenance operations, respect
the minimum installation clearances envisaged.
For correct appliance positioning, bear in mind that:
- it must not be placed above a cooker or other cooking device
-
is installed
- heat-sensitive walls (e.g. wooden walls) must be protected with proper
insulation.
b
for the introduction of the instrument for the combustion analysis check.
and cabinet/niche were obtained using a 300mm length tool. Longer
lengths of tools require more space.
3.3 Elimination of air from the heating circuit and
from the boiler (g. 7)
maintenance, you are advised to perform the following sequence of
operations:
1. A) and leave
it open.
2. .
3. .
4.
panel, so that the 3-way valve goes into heating mode.
5.
that the three-way valve cycles from heating to DHW and vice versa for
about ten times (in this situation, the boiler will go into alarm due to lack
of gas, therefore reset it whenever this is proposed).
6. Continue the sequence until no more air is felt coming from the air vent
valve.
7. Check the system pressure level is correct (the ideal level is 1 bar).
8. .
9. Turn on the gas tap and ignite the boiler.
3.4 Positioning the wall-mounted boiler and hydraulic
connections (g. 8-9-9a)
The boiler comes as standard with a boiler support plate. The position and
.
For the assembly, proceed as follows:
- fasten the boiler support plate (F) to the wall and use a spirit level to
make sure it is perfectly horizontal
- mark the 4 holes (ø 6 mm) envisaged for securing the boiler support
plate (F)
-
tips with the diameters indicated above
-
-
connect it to an appropriate drain system
- carry out the hydraulic connections.
3.5 Electrical wiring (g. 10-11)
Low voltage connections
Carry out the low voltage connections as follows:
-
- V)
-
b
2.
b In case of TA or TBT connection, remove the respective shunts
(g. 12).
-
-
housing in the boiler sliding upward within the guide rails
- tighten the safety screw (V1).
b If the low voltage electrical connection box is not connected the
boiler does not ignite.
Remote control OTBus
setting and the domestic hot water set point.
On the boiler display:
The domestic hot water setting is disable (the domestic hot water set point
On INFO menu it is visible the domestic hot water set point instead of
The central heating set point on the boiler display is related only to a room
type request and type activation related to the main heating zone, are
disable.
18/05/2013 12:17
MENU
INFO SET
42°C
1.5
bar
PLANT
HOT WATER TEMPERATURE
STATE
Open Therm connected
MENU STATE
SETINFO
OPENTHERM CONNECTED
HOT WATER TEMPERATURE
High voltage connections
The connection to the mains supply must be made via a separation device
with an omnipolar opening of at least 3.5 mm (EN 60335/1 - category 3).
It is obligatory to make the connection with a safe ground/earth, in
compliance with current directives.
b To ensure the tightness of the boiler, use a self-locking cable tie and
tighten it on the fair lead used.
b It is the responsibility of the installer to provide suitable grounding
for the appliance; the manufacturer will not be liable for any damage
resulting from an incorrect or absent earth connection.
b It is also recommended to uphold the phase-neutral connection (L-N).
b The earth conductor must be a couple of cm longer than the others.
supply. It is forbidden to use gas and/or water pipes to earth electrical
appliances. Use the power cable supplied to connect the boiler to the mains
power supply.