
Tools needed: drill and bit, phillips screwdriver, drywall/
wood screws, ethernet cable, pliers. Screws and plas-
tic plugs,A1, can be used to secure the top cover.
STEP 2
Attach mount brackets to the enclosure
with the included screws. Brackets t on
protruding screwholes on the back of
the enclosure. Then, use drywall screws
and attach unit to the wall location.
A1
QUICK SETUP GUIDE
BINCLOUD GATEWAY
BCGW.100.XXLLE
STEP 3
Assemble the antenna with mounting hardware. A.Attach the curved mount pipe to
its base with the smooth bolt on top
and two small bolts and nuts on the
swivel bottom.
B. Using U-bolts as shown attach
antenna mount to mount pipe (x).
Then insert small screws on top of
mount to hold antenna in place (y).
C. Mount the antenna outside, in a
location (Step 1) within a good line-
of-site to your sensor(s) . Remember
the cable between the Gateway unit
and the antenna should be less than
20 feet or ask your BinMaster rep for
an extension.
A.
B.
C.
cable
x. y.
washer-locking washer-nut-bolt
STEP 1
Choose a location to mount your Gateway and the antenna. For the
Gateway (pictured above), make sure there is access to a 120VAC
outlet and, preferably, an ethernet connection. The antenna should be
in a good line of site to sensors within 20 feet of the Gateway location.
laser
sensor
control
room 1
3
2
4
1. Gateway
2. Wire through wall to antenna
3.Antenna mounted outside with line-of-sight to sensor
4. Laser sensor mounted on vessel
power
ethernet