
180.SC30.NZ v1.01 1December 2017
Page 3 SC30L.NZ & SC30P.NZ
INSTALLATION INSTRUCTIONS
INITIAL INSTALLATION
The Blaze King Sirocco was tested to AS/NZS 2918:2001 Appendix B, using a Davins Flue Kit (Kit Code 2074) under Safe
Clearance Test Report SL0478 by Spectrum Laboratories. The Davins Flue Kit 2074 was tested to AS/NZS 2918:2001
Appendix F by Applied Research under Test Report ARS 04/969R1. It is Blaze Kings recommendation that the Sirocco
is installed as per these instructions, and that a fl ue height of a minimum 4.6 m from the top of the unit is achieved. It is
the responsibility of the installer to ensure that the installation of this fl ue complies with AS/NZS 2918:2001. All relevant
building codes must be adhered to.
• THE APPLIANCE AND FLUE-SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH AS/NZS 2918 AND
THE APPROPRIATE REQUIREMENTS OF THE RELEVANT BUILDING CODE OR CODES.
• APPLIANCES INSTALLED IN ACCORDANCE WITH THIS STANDARD SHALL COMPLY WITH THE
REQUIREMENTS OF AS/NZS 4013 WHERE REQUIRED BY THE REGULATORY AUTHORITY, I.E. THE
APPLIANCE SHALL BE IDENTIFIABLE BY A COMPLIANCE PLATE WITH THE MARKING ‘TESTED TO AS/
NZS 4013’.
ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE
TESTING AUTHORITY IS CONSIDERED TO BE IN BREACH OF THE APPROVAL GRANTED FOR
COMPLIANCE WITH AS/NZS 4013.
• MIXING OF APPLIANCE OR FLUE-SYSTEM COMPONENTS FROM DIFFERENT SOURCES OR MODIFYING
THE DIMENSIONAL SPECIFICATION OF COMPONENTS MAY RESULT IN HAZARDOUS CONDITIONS.
WHERE SUCH ACTION IS CONSIDERED, THE MANUFACTURER SHOULD BE CONSULTED IN THE FIRST
INSTANCE.
• CRACKED AND BROKEN COMPONENTS, e.g. GLASS PANELS OR CERAMIC TILES, MAY RENDER THE
INSTALLATION UNSAFE.
INSTALLATION INSTRUCTIONS:
1. Locate fi re on a non combustible hearth, ensuring minimum clearances are obtained to combustibles, be it a fl at wall
or corner installation. (see “MINIMUM CLEARANCES”)
2. Mark a centre point on the ceiling that is directly above the centre of the fl ue outlet. It is recommended that a laser or
plumb bob is used in this instance.
3. After drilling a smaller 6 mm hole at this point, check in ceiling cavity that all clearances to the 250 mm outer fl ue will
be achieved at this point. Please ensure that no major timber or steel supports are cut or removed.
4. Once confi rmation that positioning of the fi re is correct, continue to cut a 250 mm square hole out. This hole can be
cut out further if preferred. Continue to fi t timber or steel supports that will support 250 mm outer casing.
5. Position the 250 mm outer fl ue casing, so that it sits fl ush with the underside of the ceiling.
6. Support the outer casing at this point. Continue to run the outer casing up through the roof cladding. Ensure that
all minimum heights are achieved to comply with AS/NZS 2918:2001. Note that Blaze King recommend a minimum
height of 4.6 m of fl ue from the top of the fi re. Add any additional support to the outer casing.
7. Continue to fi t an appropriate fl ashing to seal off the roofi ng material. Also fi t support stays if more than 1.2 m of fl ue
is above the roofl ine.
8. Continue with installing the 150 mm inner fl ues. Each join needs to be sealed with Maniseal, or some other form of
exhaust cement. Each join needs to be secured with 3 stainless rivets or self-tapping screws. The 150 mm inner fl ue
needs to be sealed and secured to the fi re.