Bluetti EP600 User manual

3. Electrical connection
1
2
3
IoT Controller
Expansion
Wall Plug
Bracke
Self-tapping
Screw
626mm(24.645in)
626mm(24.645in)
368mm(14.488in)
324mm(12.755in)
324mm(12.755in)
338mm(13.307in)
1
2
3
4
PV input 1
PV input 2
DC switch
BAT- terminal
5
6
7
8
LED Indicator
Signal Port 1
Signal Port 2
BAT+ terminal
9
10
11
12
Bleed valve
COM port
CT port
DRMs Port
13
14
15
16
USB Port
Load Port
Grid Port
Grounding port
EP600
B500
BAT- terminal 1
Pack link-in
Pack link-out
BAT- terminal 2
Main switch
1
2
3
4
5
BAT+ terminal 1
Inverter signal port (TO Pcs)
Bleed valve 1
BAT+ terminal 2
Power button
Grounding port 1
Grounding port 2
Bleed valve 2
6
7
8
9
10
11
12
13
NOTE: The meter is for EP600 ESS with
grid-tied PV inverter only, provided by
BLUETTI for free.
1. This document is only a quick guide for
installation. For more details, please refer to
the Installation Manual.
2. The warranty does not cover any damage
to the equipment caused by violation of the
guide.
Note: Make sure the router is set to IEEE 802.11 b/g/n
2.4GHz.
1. Overview
2. Installation
2. Installation
IOT controller
B500 Battery
EP600 Inverter
BLUETTI APP
Grid
AC Loads
CT
2.1 Overview
3.1 Overview 3.2 Connect the communication cable
Quick Guide
BLUETTI EP600
2.2 Installation requirements 2. 3 Wall mounting
OK
NO
90°
NO NO
NO OK
max5°
Ground
≥1000mm
≥300mm ≥300mm
≥300mm ≥300mm
Ground
Wall
B500
Base
B500
EP600
( 3 layers)
Ground Ground Ground
( 4 layers)( 5 layers)
171.5mm 325mm 340mm
340mm
325mm
171.5mm
6-Ø8
626mm
171mm 325mm 325mm 340mm
171.5mm
325mm
325mm 340mm
8-Ø8
626mm
171.5mm 325mm 325mm
171.5mm 325mm 325mm
325mm 340mm
325mm 340mm
10-Ø8
626mm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
15
1
2
3
4
5
6
7
8
9
10
11
12
13

3. Electrical connection
1
2
3
IoT Controller
Expansion
Wall Plug
Bracke
Self-tapping
Screw
626mm(24.645in)
626mm(24.645in)
368mm(14.488in)
324mm(12.755in)
324mm(12.755in)
338mm(13.307in)
1
2
3
4
PV input 1
PV input 2
DC switch
BAT- terminal
5
6
7
8
LED Indicator
Signal Port 1
Signal Port 2
BAT+ terminal
9
10
11
12
Bleed valve
COM port
CT port
DRMs Port
13
14
15
16
USB Port
Load Port
Grid Port
Grounding port
EP600
B500
BAT- terminal 1
Pack link-in
Pack link-out
BAT- terminal 2
Main switch
1
2
3
4
5
BAT+ terminal 1
Inverter signal port (TO Pcs)
Bleed valve 1
BAT+ terminal 2
Power button
Grounding port 1
Grounding port 2
Bleed valve 2
6
7
8
9
10
11
12
13
NOTE: The meter is for EP600 ESS with
grid-tied PV inverter only, provided by
BLUETTI for free.
1. This document is only a quick guide for
installation. For more details, please refer to
the Installation Manual.
2. The warranty does not cover any damage
to the equipment caused by violation of the
guide.
Note: Make sure the router is set to IEEE 802.11 b/g/n
2.4GHz.
1. Overview
2. Installation
2. Installation
IOT controller
B500 Battery
EP600 Inverter
BLUETTI APP
Grid
AC Loads
CT
2.1 Overview
3.1 Overview 3.2 Connect the communication cable
Quick Guide
BLUETTI EP600
2.2 Installation requirements 2. 3 Wall mounting
OK
NO
90°
NO NO
NO OK
max5°
Ground
≥1000mm
≥300mm ≥300mm
≥300mm ≥300mm
Ground
Wall
B500
Base
B500
EP600
( 3 layers)
Ground Ground Ground
( 4 layers)( 5 layers)
171.5mm 325mm 340mm
340mm
325mm
171.5mm
6-Ø8
626mm
171mm 325mm 325mm 340mm
171.5mm
325mm
325mm 340mm
8-Ø8
626mm
171.5mm 325mm 325mm
171.5mm 325mm 325mm
325mm 340mm
325mm 340mm
10-Ø8
626mm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
15
1
2
3
4
5
6
7
8
9
10
11
12
13

3. Electrical connection
1
2
3
IoT Controller
Expansion
Wall Plug
Bracke
Self-tapping
Screw
626mm(24.645in)
626mm(24.645in)
368mm(14.488in)
324mm(12.755in)
324mm(12.755in)
338mm(13.307in)
1
2
3
4
PV input 1
PV input 2
DC switch
BAT- terminal
5
6
7
8
LED Indicator
Signal Port 1
Signal Port 2
BAT+ terminal
9
10
11
12
Bleed valve
COM port
CT port
DRMs Port
13
14
15
16
USB Port
Load Port
Grid Port
Grounding port
EP600
B500
BAT- terminal 1
Pack link-in
Pack link-out
BAT- terminal 2
Main switch
1
2
3
4
5
BAT+ terminal 1
Inverter signal port (TO Pcs)
Bleed valve 1
BAT+ terminal 2
Power button
Grounding port 1
Grounding port 2
Bleed valve 2
6
7
8
9
10
11
12
13
NOTE: The meter is for EP600 ESS with
grid-tied PV inverter only, provided by
BLUETTI for free.
1. This document is only a quick guide for
installation. For more details, please refer to
the Installation Manual.
2. The warranty does not cover any damage
to the equipment caused by violation of the
guide.
Note: Make sure the router is set to IEEE 802.11 b/g/n
2.4GHz.
1. Overview
2. Installation
2. Installation
IOT controller
B500 Battery
EP600 Inverter
BLUETTI APP
Grid
AC Loads
CT
2.1 Overview
3.1 Overview 3.2 Connect the communication cable
Quick Guide
BLUETTI EP600
2.2 Installation requirements 2. 3 Wall mounting
OK
NO
90°
NO NO
NO OK
max5°
Ground
≥1000mm
≥300mm ≥300mm
≥300mm ≥300mm
Ground
Wall
B500
Base
B500
EP600
( 3 layers)
Ground Ground Ground
( 4 layers)( 5 layers)
171.5mm 325mm 340mm
340mm
325mm
171.5mm
6-Ø8
626mm
171mm 325mm 325mm 340mm
171.5mm
325mm
325mm 340mm
8-Ø8
626mm
171.5mm 325mm 325mm
171.5mm 325mm 325mm
325mm 340mm
325mm 340mm
10-Ø8
626mm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
15
1
2
3
4
5
6
7
8
9
10
11
12
13

3. Electrical connection
1
2
3
IoT Controller
Expansion
Wall Plug
Bracke
Self-tapping
Screw
626mm(24.645in)
626mm(24.645in)
368mm(14.488in)
324mm(12.755in)
324mm(12.755in)
338mm(13.307in)
1
2
3
4
PV input 1
PV input 2
DC switch
BAT- terminal
5
6
7
8
LED Indicator
Signal Port 1
Signal Port 2
BAT+ terminal
9
10
11
12
Bleed valve
COM port
CT port
DRMs Port
13
14
15
16
USB Port
Load Port
Grid Port
Grounding port
EP600
B500
BAT- terminal 1
Pack link-in
Pack link-out
BAT- terminal 2
Main switch
1
2
3
4
5
BAT+ terminal 1
Inverter signal port (TO Pcs)
Bleed valve 1
BAT+ terminal 2
Power button
Grounding port 1
Grounding port 2
Bleed valve 2
6
7
8
9
10
11
12
13
NOTE: The meter is for EP600 ESS with
grid-tied PV inverter only, provided by
BLUETTI for free.
1. This document is only a quick guide for
installation. For more details, please refer to
the Installation Manual.
2. The warranty does not cover any damage
to the equipment caused by violation of the
guide.
Note: Make sure the router is set to IEEE 802.11 b/g/n
2.4GHz.
1. Overview
2. Installation
2. Installation
IOT controller
B500 Battery
EP600 Inverter
BLUETTI APP
Grid
AC Loads
CT
2.1 Overview
3.1 Overview 3.2 Connect the communication cable
Quick Guide
BLUETTI EP600
2.2 Installation requirements 2. 3 Wall mounting
OK
NO
90°
NO NO
NO OK
max5°
Ground
≥1000mm
≥300mm ≥300mm
≥300mm ≥300mm
Ground
Wall
B500
Base
B500
EP600
( 3 layers)
Ground Ground Ground
( 4 layers)( 5 layers)
171.5mm 325mm 340mm
340mm
325mm
171.5mm
6-Ø8
626mm
171mm 325mm 325mm 340mm
171.5mm
325mm
325mm 340mm
8-Ø8
626mm
171.5mm 325mm 325mm
171.5mm 325mm 325mm
325mm 340mm
325mm 340mm
10-Ø8
626mm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
15
1
2
3
4
5
6
7
8
9
10
11
12
13

3. Electrical connection
1
2
3
IoT Controller
Expansion
Wall Plug
Bracke
Self-tapping
Screw
626mm(24.645in)
626mm(24.645in)
368mm(14.488in)
324mm(12.755in)
324mm(12.755in)
338mm(13.307in)
1
2
3
4
PV input 1
PV input 2
DC switch
BAT- terminal
5
6
7
8
LED Indicator
Signal Port 1
Signal Port 2
BAT+ terminal
9
10
11
12
Bleed valve
COM port
CT port
DRMs Port
13
14
15
16
USB Port
Load Port
Grid Port
Grounding port
EP600
B500
BAT- terminal 1
Pack link-in
Pack link-out
BAT- terminal 2
Main switch
1
2
3
4
5
BAT+ terminal 1
Inverter signal port (TO Pcs)
Bleed valve 1
BAT+ terminal 2
Power button
Grounding port 1
Grounding port 2
Bleed valve 2
6
7
8
9
10
11
12
13
NOTE: The meter is for EP600 ESS with
grid-tied PV inverter only, provided by
BLUETTI for free.
1. This document is only a quick guide for
installation. For more details, please refer to
the Installation Manual.
2. The warranty does not cover any damage
to the equipment caused by violation of the
guide.
Note: Make sure the router is set to IEEE 802.11 b/g/n
2.4GHz.
1. Overview
2. Installation
2. Installation
IOT controller
B500 Battery
EP600 Inverter
BLUETTI APP
Grid
AC Loads
CT
2.1 Overview
3.1 Overview 3.2 Connect the communication cable
Quick Guide
BLUETTI EP600
2.2 Installation requirements 2. 3 Wall mounting
OK
NO
90°
NO NO
NO OK
max5°
Ground
≥1000mm
≥300mm ≥300mm
≥300mm ≥300mm
Ground
Wall
B500
Base
B500
EP600
( 3 layers)
Ground Ground Ground
( 4 layers)( 5 layers)
171.5mm 325mm 340mm
340mm
325mm
171.5mm
6-Ø8
626mm
171mm 325mm 325mm 340mm
171.5mm
325mm
325mm 340mm
8-Ø8
626mm
171.5mm 325mm 325mm
171.5mm 325mm 325mm
325mm 340mm
325mm 340mm
10-Ø8
626mm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
15
1
2
3
4
5
6
7
8
9
10
11
12
13

3. Electrical connection
1
2
3
IoT Controller
Expansion
Wall Plug
Bracke
Self-tapping
Screw
626mm(24.645in)
626mm(24.645in)
368mm(14.488in)
324mm(12.755in)
324mm(12.755in)
338mm(13.307in)
1
2
3
4
PV input 1
PV input 2
DC switch
BAT- terminal
5
6
7
8
LED Indicator
Signal Port 1
Signal Port 2
BAT+ terminal
9
10
11
12
Bleed valve
COM port
CT port
DRMs Port
13
14
15
16
USB Port
Load Port
Grid Port
Grounding port
EP600
B500
BAT- terminal 1
Pack link-in
Pack link-out
BAT- terminal 2
Main switch
1
2
3
4
5
BAT+ terminal 1
Inverter signal port (TO Pcs)
Bleed valve 1
BAT+ terminal 2
Power button
Grounding port 1
Grounding port 2
Bleed valve 2
6
7
8
9
10
11
12
13
NOTE: The meter is for EP600 ESS with
grid-tied PV inverter only, provided by
BLUETTI for free.
1. This document is only a quick guide for
installation. For more details, please refer to
the Installation Manual.
2. The warranty does not cover any damage
to the equipment caused by violation of the
guide.
Note: Make sure the router is set to IEEE 802.11 b/g/n
2.4GHz.
1. Overview
2. Installation
2. Installation
IOT controller
B500 Battery
EP600 Inverter
BLUETTI APP
Grid
AC Loads
CT
2.1 Overview
3.1 Overview 3.2 Connect the communication cable
Quick Guide
BLUETTI EP600
2.2 Installation requirements 2. 3 Wall mounting
OK
NO
90°
NO NO
NO OK
max5°
Ground
≥1000mm
≥300mm ≥300mm
≥300mm ≥300mm
Ground
Wall
B500
Base
B500
EP600
( 3 layers)
Ground Ground Ground
( 4 layers)( 5 layers)
171.5mm 325mm 340mm
340mm
325mm
171.5mm
6-Ø8
626mm
171mm 325mm 325mm 340mm
171.5mm
325mm
325mm 340mm
8-Ø8
626mm
171.5mm 325mm 325mm
171.5mm 325mm 325mm
325mm 340mm
325mm 340mm
10-Ø8
626mm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
15
1
2
3
4
5
6
7
8
9
10
11
12
13

1 . Positive metal core
2. Negative metal core
7-9mm
7-9mm
2
1
Crimping pliers
Press
MC4 Wrench
1 . Positive metal core
2. Negative metal core
1
2
1
3
56
2
4
L2 is 3mm longer than L1
L2=L1+3mm
L1
1 . Protective cover of AC junction box
2. M32 PG waterproof joint
1 . AC cable
2. Protective cover of AC junction
box
3. M4×12 screws
Screws Max 1.2 N.m
1. Terminal
2. M5 screws
3. 4mm2×5C cable
4. Junction box load symbol
Screws MAX 1.8 N.m
Screws
MAX 1.8 N.m
2
3
4
1
1
2
3
4
2
1
1
2
3
NOTE: It is forbidden to connect the grid cables to the
BACKUP interface of EP600.
3. Electrical connection
4. Power on 5. Service and contact
3.3 Connect the Grounding Cables 3.5 Connect the battery power cables
3.4 Connect the GRID and BACKUP cables 3.6 Connect PV cables
Conductor
cross-sectional
area:
2.5mm2~4mm2
PV1+:To solar panel positive
PV1-:To solar panel negative
PV1 PE:PV1 to solar panel
ground
PV2+:To solar panel positive
PV2-:To solar panel negative
PV2 PE:PV2 to solar panel
ground
NOTE: Please check the open circuit voltage of PV arrays,
which should be less than 500V.
Pay attention to the direction,
the direction of the arrow
towards the grid.
GRID-L1
GRID-L2
GRID-L3
NOTE:
1. The arrow inside the CT points to the grid.
2. Phase sequence: L1 to R, L2 to S, L3 to T.
3. The CT should be tied to the L1, L2 and L3 cables of the
main circuit breaker of the grid.
3.7 Attach the CT 3.9 Electrical connection mode 1: DC coupling 3.10 Electrical connection mode 2: AC coupling
3.8 Install the transfer switch
NOTE:
1.The neutral cable from the BACKUP teminal of EP600 cannot
be connected to the neutral cable of the public grid.
2.Connect the L1/L2/L3/N wires from EP600 BACKUP terminal
and public grid to the input side of the transfer switch, and the
output side to the essential loads.
3.If the grid is stable, turn to “II” to use the public grid to
power the loads; otherwise turn to “I” to use EP600 UPS
mode to avoid the inconvenience caused by power outage.
4.If EP600 ESS fails, turn to “II” and contact BLUETTI
Customer Support.
NOTE:
The meter is for EP600 ESS with grid-tied
PV inverter only.
1) Connect UA/UB/UC/UN cables to the
L1/L2/L3/N of PV inverter.
2) Connect the CT to the Meter and tie
them to L1/L2/L3 cables of the PV inverter.
3) Connect the 485-A red wire to pin 21,
485-B black wire to pin 22.
Step 1 Switch on the DC circuit breakers on EP600.
Step 2 Switch on the DC circuit breakers on B500 battery packs. Press and hold the power button of any
battery pack for about 3 seconds, and the green indicator on the button will light up.
Step 3 About 40 seconds later, the indicator on EP600 will stay green.
Step 4 Switch on the AC circuit breakers connected to the EP600 GRID terminal.
Step 5 Power on the system via BLUETTI app.
Step 6 Check the voltage of BACKUP terminal.
Step 7 Switch on the AC circuit breakers connected to the EP600 load port.
Step 8 Check the EP600 system operation in the App.
PV
B500
EP600
PV
BAT
Grid
Back-Up
IOT CT Grid
Non-essential
Load
Essential Load
LED Indicator
•Green: Run
•Orange: Alarm
•Red: Fault
States
No alarm and
No fault Always ON
Always ON Always ON
Always ON
/
/
//
/
/Always ON
Always ON
Alarm without
fault
No alarm with
fault
Alarm and
fault
Run
Green light
Alarm
Orange light
Fault
Red light
+
-
+
-On_Grid
Breaker
Transfer Switch
Main Breaker
QFQF
B500
Essential Loads
PV Input
BackupGrid
Bat Input
RCDRCD
EP600
RCD
CT
Non-essential
Loads
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
Solar
PV User’s PV inverter Meter
(RS-485)
B500
(reserved)
EP600
CT Grid
Non-essential
Load
Essential Load
PV
BAT
Grid
Back-Up
IOT
On_Grid Breaker
Transfer Switch
Main Breaker
QF
QF
B500
+
-
Essential Loads
PV Input
Backup
RS485-A
RS485-B
Grid
Bat Input
Inverter
+
-
RCD Meter
RCD
EP600
RCD
CT
Non-essential
Loads
COM
21 22
UN
UC
UB
UA
Solar
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
A
Ua Ub Uc Ia*
* * *
Ia Ib* Ib Ic* IcN
B
C
N
Company: POWEROAK GmbH
Address: Lise-Meitner-Str. 14 28816 Stuhr Germany
Mail: logi@bluetti.de
@ bluetti.inc @ bluetti_inc
@bluetti_official
Company: POWEROAK ENERGY UK CO.,LTD
Address: Unit 2 NorthGate, Bolsover Business Park,
Woodhouse Lane Chesterfield England, S44 6BD
Mail:poweroak.eu@bluetti.com
Wire Transfer
switch
EP600
BACKUP
terminal
L1
L2
L3
N
L1
L2
L3
N
L1
L2
L3
N
Pin 2
Pin 6
Pin 10
Pin 14
Pin 4
Pin 8
Pin 12
Pin 16
Pin 1
Pin 5
Pin 9
Pin 13
Public
grid
Essential
loads
The arrow inside the CT
points to the grid

1 . Positive metal core
2. Negative metal core
7-9mm
7-9mm
2
1
Crimping pliers
Press
MC4 Wrench
1 . Positive metal core
2. Negative metal core
1
2
1
3
56
2
4
L2 is 3mm longer than L1
L2=L1+3mm
L1
1 . Protective cover of AC junction box
2. M32 PG waterproof joint
1 . AC cable
2. Protective cover of AC junction
box
3. M4×12 screws
Screws Max 1.2 N.m
1. Terminal
2. M5 screws
3. 4mm2×5C cable
4. Junction box load symbol
Screws MAX 1.8 N.m
Screws
MAX 1.8 N.m
2
3
4
1
1
2
3
4
2
1
1
2
3
NOTE: It is forbidden to connect the grid cables to the
BACKUP interface of EP600.
3. Electrical connection
4. Power on 5. Service and contact
3.3 Connect the Grounding Cables 3.5 Connect the battery power cables
3.4 Connect the GRID and BACKUP cables 3.6 Connect PV cables
Conductor
cross-sectional
area:
2.5mm2~4mm2
PV1+:To solar panel positive
PV1-:To solar panel negative
PV1 PE:PV1 to solar panel
ground
PV2+:To solar panel positive
PV2-:To solar panel negative
PV2 PE:PV2 to solar panel
ground
NOTE: Please check the open circuit voltage of PV arrays,
which should be less than 500V.
Pay attention to the direction,
the direction of the arrow
towards the grid.
GRID-L1
GRID-L2
GRID-L3
NOTE:
1. The arrow inside the CT points to the grid.
2. Phase sequence: L1 to R, L2 to S, L3 to T.
3. The CT should be tied to the L1, L2 and L3 cables of the
main circuit breaker of the grid.
3.7 Attach the CT 3.9 Electrical connection mode 1: DC coupling 3.10 Electrical connection mode 2: AC coupling
3.8 Install the transfer switch
NOTE:
1.The neutral cable from the BACKUP teminal of EP600 cannot
be connected to the neutral cable of the public grid.
2.Connect the L1/L2/L3/N wires from EP600 BACKUP terminal
and public grid to the input side of the transfer switch, and the
output side to the essential loads.
3.If the grid is stable, turn to “II” to use the public grid to
power the loads; otherwise turn to “I” to use EP600 UPS
mode to avoid the inconvenience caused by power outage.
4.If EP600 ESS fails, turn to “II” and contact BLUETTI
Customer Support.
NOTE:
The meter is for EP600 ESS with grid-tied
PV inverter only.
1) Connect UA/UB/UC/UN cables to the
L1/L2/L3/N of PV inverter.
2) Connect the CT to the Meter and tie
them to L1/L2/L3 cables of the PV inverter.
3) Connect the 485-A red wire to pin 21,
485-B black wire to pin 22.
Step 1 Switch on the DC circuit breakers on EP600.
Step 2 Switch on the DC circuit breakers on B500 battery packs. Press and hold the power button of any
battery pack for about 3 seconds, and the green indicator on the button will light up.
Step 3 About 40 seconds later, the indicator on EP600 will stay green.
Step 4 Switch on the AC circuit breakers connected to the EP600 GRID terminal.
Step 5 Power on the system via BLUETTI app.
Step 6 Check the voltage of BACKUP terminal.
Step 7 Switch on the AC circuit breakers connected to the EP600 load port.
Step 8 Check the EP600 system operation in the App.
PV
B500
EP600
PV
BAT
Grid
Back-Up
IOT CT Grid
Non-essential
Load
Essential Load
LED Indicator
•Green: Run
•Orange: Alarm
•Red: Fault
States
No alarm and
No fault Always ON
Always ON Always ON
Always ON
/
/
//
/
/Always ON
Always ON
Alarm without
fault
No alarm with
fault
Alarm and
fault
Run
Green light
Alarm
Orange light
Fault
Red light
+
-
+
-On_Grid
Breaker
Transfer Switch
Main Breaker
QFQF
B500
Essential Loads
PV Input
BackupGrid
Bat Input
RCDRCD
EP600
RCD
CT
Non-essential
Loads
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
Solar
PV User’s PV inverter Meter
(RS-485)
B500
(reserved)
EP600
CT Grid
Non-essential
Load
Essential Load
PV
BAT
Grid
Back-Up
IOT
On_Grid Breaker
Transfer Switch
Main Breaker
QF
QF
B500
+
-
Essential Loads
PV Input
Backup
RS485-A
RS485-B
Grid
Bat Input
Inverter
+
-
RCD Meter
RCD
EP600
RCD
CT
Non-essential
Loads
COM
21 22
UN
UC
UB
UA
Solar
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
A
Ua Ub Uc Ia*
* * *
Ia Ib* Ib Ic* IcN
B
C
N
Company: POWEROAK GmbH
Address: Lise-Meitner-Str. 14 28816 Stuhr Germany
Mail: logi@bluetti.de
@ bluetti.inc @ bluetti_inc
@bluetti_official
Company: POWEROAK ENERGY UK CO.,LTD
Address: Unit 2 NorthGate, Bolsover Business Park,
Woodhouse Lane Chesterfield England, S44 6BD
Mail:poweroak.eu@bluetti.com
Wire Transfer
switch
EP600
BACKUP
terminal
L1
L2
L3
N
L1
L2
L3
N
L1
L2
L3
N
Pin 2
Pin 6
Pin 10
Pin 14
Pin 4
Pin 8
Pin 12
Pin 16
Pin 1
Pin 5
Pin 9
Pin 13
Public
grid
Essential
loads
The arrow inside the CT
points to the grid

1 . Positive metal core
2. Negative metal core
7-9mm
7-9mm
2
1
Crimping pliers
Press
MC4 Wrench
1 . Positive metal core
2. Negative metal core
1
2
1
3
56
2
4
L2 is 3mm longer than L1
L2=L1+3mm
L1
1 . Protective cover of AC junction box
2. M32 PG waterproof joint
1 . AC cable
2. Protective cover of AC junction
box
3. M4×12 screws
Screws Max 1.2 N.m
1. Terminal
2. M5 screws
3. 4mm2×5C cable
4. Junction box load symbol
Screws MAX 1.8 N.m
Screws
MAX 1.8 N.m
2
3
4
1
1
2
3
4
2
1
1
2
3
NOTE: It is forbidden to connect the grid cables to the
BACKUP interface of EP600.
3. Electrical connection
4. Power on 5. Service and contact
3.3 Connect the Grounding Cables 3.5 Connect the battery power cables
3.4 Connect the GRID and BACKUP cables 3.6 Connect PV cables
Conductor
cross-sectional
area:
2.5mm2~4mm2
PV1+:To solar panel positive
PV1-:To solar panel negative
PV1 PE:PV1 to solar panel
ground
PV2+:To solar panel positive
PV2-:To solar panel negative
PV2 PE:PV2 to solar panel
ground
NOTE: Please check the open circuit voltage of PV arrays,
which should be less than 500V.
Pay attention to the direction,
the direction of the arrow
towards the grid.
GRID-L1
GRID-L2
GRID-L3
NOTE:
1. The arrow inside the CT points to the grid.
2. Phase sequence: L1 to R, L2 to S, L3 to T.
3. The CT should be tied to the L1, L2 and L3 cables of the
main circuit breaker of the grid.
3.7 Attach the CT 3.9 Electrical connection mode 1: DC coupling 3.10 Electrical connection mode 2: AC coupling
3.8 Install the transfer switch
NOTE:
1.The neutral cable from the BACKUP teminal of EP600 cannot
be connected to the neutral cable of the public grid.
2.Connect the L1/L2/L3/N wires from EP600 BACKUP terminal
and public grid to the input side of the transfer switch, and the
output side to the essential loads.
3.If the grid is stable, turn to “II” to use the public grid to
power the loads; otherwise turn to “I” to use EP600 UPS
mode to avoid the inconvenience caused by power outage.
4.If EP600 ESS fails, turn to “II” and contact BLUETTI
Customer Support.
NOTE:
The meter is for EP600 ESS with grid-tied
PV inverter only.
1) Connect UA/UB/UC/UN cables to the
L1/L2/L3/N of PV inverter.
2) Connect the CT to the Meter and tie
them to L1/L2/L3 cables of the PV inverter.
3) Connect the 485-A red wire to pin 21,
485-B black wire to pin 22.
Step 1 Switch on the DC circuit breakers on EP600.
Step 2 Switch on the DC circuit breakers on B500 battery packs. Press and hold the power button of any
battery pack for about 3 seconds, and the green indicator on the button will light up.
Step 3 About 40 seconds later, the indicator on EP600 will stay green.
Step 4 Switch on the AC circuit breakers connected to the EP600 GRID terminal.
Step 5 Power on the system via BLUETTI app.
Step 6 Check the voltage of BACKUP terminal.
Step 7 Switch on the AC circuit breakers connected to the EP600 load port.
Step 8 Check the EP600 system operation in the App.
PV
B500
EP600
PV
BAT
Grid
Back-Up
IOT CT Grid
Non-essential
Load
Essential Load
LED Indicator
•Green: Run
•Orange: Alarm
•Red: Fault
States
No alarm and
No fault Always ON
Always ON Always ON
Always ON
/
/
//
/
/Always ON
Always ON
Alarm without
fault
No alarm with
fault
Alarm and
fault
Run
Green light
Alarm
Orange light
Fault
Red light
+
-
+
-On_Grid
Breaker
Transfer Switch
Main Breaker
QFQF
B500
Essential Loads
PV Input
BackupGrid
Bat Input
RCDRCD
EP600
RCD
CT
Non-essential
Loads
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
Solar
PV User’s PV inverter Meter
(RS-485)
B500
(reserved)
EP600
CT Grid
Non-essential
Load
Essential Load
PV
BAT
Grid
Back-Up
IOT
On_Grid Breaker
Transfer Switch
Main Breaker
QF
QF
B500
+
-
Essential Loads
PV Input
Backup
RS485-A
RS485-B
Grid
Bat Input
Inverter
+
-
RCD Meter
RCD
EP600
RCD
CT
Non-essential
Loads
COM
21 22
UN
UC
UB
UA
Solar
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
A
Ua Ub Uc Ia*
* * *
Ia Ib* Ib Ic* IcN
B
C
N
Company: POWEROAK GmbH
Address: Lise-Meitner-Str. 14 28816 Stuhr Germany
Mail: logi@bluetti.de
@ bluetti.inc @ bluetti_inc
@bluetti_official
Company: POWEROAK ENERGY UK CO.,LTD
Address: Unit 2 NorthGate, Bolsover Business Park,
Woodhouse Lane Chesterfield England, S44 6BD
Mail:poweroak.eu@bluetti.com
Wire Transfer
switch
EP600
BACKUP
terminal
L1
L2
L3
N
L1
L2
L3
N
L1
L2
L3
N
Pin 2
Pin 6
Pin 10
Pin 14
Pin 4
Pin 8
Pin 12
Pin 16
Pin 1
Pin 5
Pin 9
Pin 13
Public
grid
Essential
loads
The arrow inside the CT
points to the grid

1 . Positive metal core
2. Negative metal core
7-9mm
7-9mm
2
1
Crimping pliers
Press
MC4 Wrench
1 . Positive metal core
2. Negative metal core
1
2
1
3
56
2
4
L2 is 3mm longer than L1
L2=L1+3mm
L1
1 . Protective cover of AC junction box
2. M32 PG waterproof joint
1 . AC cable
2. Protective cover of AC junction
box
3. M4×12 screws
Screws Max 1.2 N.m
1. Terminal
2. M5 screws
3. 4mm2×5C cable
4. Junction box load symbol
Screws MAX 1.8 N.m
Screws
MAX 1.8 N.m
2
3
4
1
1
2
3
4
2
1
1
2
3
NOTE: It is forbidden to connect the grid cables to the
BACKUP interface of EP600.
3. Electrical connection
4. Power on 5. Service and contact
3.3 Connect the Grounding Cables 3.5 Connect the battery power cables
3.4 Connect the GRID and BACKUP cables 3.6 Connect PV cables
Conductor
cross-sectional
area:
2.5mm2~4mm2
PV1+:To solar panel positive
PV1-:To solar panel negative
PV1 PE:PV1 to solar panel
ground
PV2+:To solar panel positive
PV2-:To solar panel negative
PV2 PE:PV2 to solar panel
ground
NOTE: Please check the open circuit voltage of PV arrays,
which should be less than 500V.
Pay attention to the direction,
the direction of the arrow
towards the grid.
GRID-L1
GRID-L2
GRID-L3
NOTE:
1. The arrow inside the CT points to the grid.
2. Phase sequence: L1 to R, L2 to S, L3 to T.
3. The CT should be tied to the L1, L2 and L3 cables of the
main circuit breaker of the grid.
3.7 Attach the CT 3.9 Electrical connection mode 1: DC coupling 3.10 Electrical connection mode 2: AC coupling
3.8 Install the transfer switch
NOTE:
1.The neutral cable from the BACKUP teminal of EP600 cannot
be connected to the neutral cable of the public grid.
2.Connect the L1/L2/L3/N wires from EP600 BACKUP terminal
and public grid to the input side of the transfer switch, and the
output side to the essential loads.
3.If the grid is stable, turn to “II” to use the public grid to
power the loads; otherwise turn to “I” to use EP600 UPS
mode to avoid the inconvenience caused by power outage.
4.If EP600 ESS fails, turn to “II” and contact BLUETTI
Customer Support.
NOTE:
The meter is for EP600 ESS with grid-tied
PV inverter only.
1) Connect UA/UB/UC/UN cables to the
L1/L2/L3/N of PV inverter.
2) Connect the CT to the Meter and tie
them to L1/L2/L3 cables of the PV inverter.
3) Connect the 485-A red wire to pin 21,
485-B black wire to pin 22.
Step 1 Switch on the DC circuit breakers on EP600.
Step 2 Switch on the DC circuit breakers on B500 battery packs. Press and hold the power button of any
battery pack for about 3 seconds, and the green indicator on the button will light up.
Step 3 About 40 seconds later, the indicator on EP600 will stay green.
Step 4 Switch on the AC circuit breakers connected to the EP600 GRID terminal.
Step 5 Power on the system via BLUETTI app.
Step 6 Check the voltage of BACKUP terminal.
Step 7 Switch on the AC circuit breakers connected to the EP600 load port.
Step 8 Check the EP600 system operation in the App.
PV
B500
EP600
PV
BAT
Grid
Back-Up
IOT CT Grid
Non-essential
Load
Essential Load
LED Indicator
•Green: Run
•Orange: Alarm
•Red: Fault
States
No alarm and
No fault Always ON
Always ON Always ON
Always ON
/
/
//
/
/Always ON
Always ON
Alarm without
fault
No alarm with
fault
Alarm and
fault
Run
Green light
Alarm
Orange light
Fault
Red light
+
-
+
-On_Grid
Breaker
Transfer Switch
Main Breaker
QFQF
B500
Essential Loads
PV Input
BackupGrid
Bat Input
RCDRCD
EP600
RCD
CT
Non-essential
Loads
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
Solar
PV User’s PV inverter Meter
(RS-485)
B500
(reserved)
EP600
CT Grid
Non-essential
Load
Essential Load
PV
BAT
Grid
Back-Up
IOT
On_Grid Breaker
Transfer Switch
Main Breaker
QF
QF
B500
+
-
Essential Loads
PV Input
Backup
RS485-A
RS485-B
Grid
Bat Input
Inverter
+
-
RCD Meter
RCD
EP600
RCD
CT
Non-essential
Loads
COM
21 22
UN
UC
UB
UA
Solar
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
A
Ua Ub Uc Ia*
* * *
Ia Ib* Ib Ic* IcN
B
C
N
Company: POWEROAK GmbH
Address: Lise-Meitner-Str. 14 28816 Stuhr Germany
Mail: logi@bluetti.de
@ bluetti.inc @ bluetti_inc
@bluetti_official
Company: POWEROAK ENERGY UK CO.,LTD
Address: Unit 2 NorthGate, Bolsover Business Park,
Woodhouse Lane Chesterfield England, S44 6BD
Mail:poweroak.eu@bluetti.com
Wire Transfer
switch
EP600
BACKUP
terminal
L1
L2
L3
N
L1
L2
L3
N
L1
L2
L3
N
Pin 2
Pin 6
Pin 10
Pin 14
Pin 4
Pin 8
Pin 12
Pin 16
Pin 1
Pin 5
Pin 9
Pin 13
Public
grid
Essential
loads
The arrow inside the CT
points to the grid

1 . Positive metal core
2. Negative metal core
7-9mm
7-9mm
2
1
Crimping pliers
Press
MC4 Wrench
1 . Positive metal core
2. Negative metal core
1
2
1
3
56
2
4
L2 is 3mm longer than L1
L2=L1+3mm
L1
1 . Protective cover of AC junction box
2. M32 PG waterproof joint
1 . AC cable
2. Protective cover of AC junction
box
3. M4×12 screws
Screws Max 1.2 N.m
1. Terminal
2. M5 screws
3. 4mm2×5C cable
4. Junction box load symbol
Screws MAX 1.8 N.m
Screws
MAX 1.8 N.m
2
3
4
1
1
2
3
4
2
1
1
2
3
NOTE: It is forbidden to connect the grid cables to the
BACKUP interface of EP600.
3. Electrical connection
4. Power on 5. Service and contact
3.3 Connect the Grounding Cables 3.5 Connect the battery power cables
3.4 Connect the GRID and BACKUP cables 3.6 Connect PV cables
Conductor
cross-sectional
area:
2.5mm2~4mm2
PV1+:To solar panel positive
PV1-:To solar panel negative
PV1 PE:PV1 to solar panel
ground
PV2+:To solar panel positive
PV2-:To solar panel negative
PV2 PE:PV2 to solar panel
ground
NOTE: Please check the open circuit voltage of PV arrays,
which should be less than 500V.
Pay attention to the direction,
the direction of the arrow
towards the grid.
GRID-L1
GRID-L2
GRID-L3
NOTE:
1. The arrow inside the CT points to the grid.
2. Phase sequence: L1 to R, L2 to S, L3 to T.
3. The CT should be tied to the L1, L2 and L3 cables of the
main circuit breaker of the grid.
3.7 Attach the CT 3.9 Electrical connection mode 1: DC coupling 3.10 Electrical connection mode 2: AC coupling
3.8 Install the transfer switch
NOTE:
1.The neutral cable from the BACKUP teminal of EP600 cannot
be connected to the neutral cable of the public grid.
2.Connect the L1/L2/L3/N wires from EP600 BACKUP terminal
and public grid to the input side of the transfer switch, and the
output side to the essential loads.
3.If the grid is stable, turn to “II” to use the public grid to
power the loads; otherwise turn to “I” to use EP600 UPS
mode to avoid the inconvenience caused by power outage.
4.If EP600 ESS fails, turn to “II” and contact BLUETTI
Customer Support.
NOTE:
The meter is for EP600 ESS with grid-tied
PV inverter only.
1) Connect UA/UB/UC/UN cables to the
L1/L2/L3/N of PV inverter.
2) Connect the CT to the Meter and tie
them to L1/L2/L3 cables of the PV inverter.
3) Connect the 485-A red wire to pin 21,
485-B black wire to pin 22.
Step 1 Switch on the DC circuit breakers on EP600.
Step 2 Switch on the DC circuit breakers on B500 battery packs. Press and hold the power button of any
battery pack for about 3 seconds, and the green indicator on the button will light up.
Step 3 About 40 seconds later, the indicator on EP600 will stay green.
Step 4 Switch on the AC circuit breakers connected to the EP600 GRID terminal.
Step 5 Power on the system via BLUETTI app.
Step 6 Check the voltage of BACKUP terminal.
Step 7 Switch on the AC circuit breakers connected to the EP600 load port.
Step 8 Check the EP600 system operation in the App.
PV
B500
EP600
PV
BAT
Grid
Back-Up
IOT CT Grid
Non-essential
Load
Essential Load
LED Indicator
•Green: Run
•Orange: Alarm
•Red: Fault
States
No alarm and
No fault Always ON
Always ON Always ON
Always ON
/
/
//
/
/Always ON
Always ON
Alarm without
fault
No alarm with
fault
Alarm and
fault
Run
Green light
Alarm
Orange light
Fault
Red light
+
-
+
-On_Grid
Breaker
Transfer Switch
Main Breaker
QFQF
B500
Essential Loads
PV Input
BackupGrid
Bat Input
RCDRCD
EP600
RCD
CT
Non-essential
Loads
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
Solar
PV User’s PV inverter Meter
(RS-485)
B500
(reserved)
EP600
CT Grid
Non-essential
Load
Essential Load
PV
BAT
Grid
Back-Up
IOT
On_Grid Breaker
Transfer Switch
Main Breaker
QF
QF
B500
+
-
Essential Loads
PV Input
Backup
RS485-A
RS485-B
Grid
Bat Input
Inverter
+
-
RCD Meter
RCD
EP600
RCD
CT
Non-essential
Loads
COM
21 22
UN
UC
UB
UA
Solar
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
A
Ua Ub Uc Ia*
* * *
Ia Ib* Ib Ic* IcN
B
C
N
Company: POWEROAK GmbH
Address: Lise-Meitner-Str. 14 28816 Stuhr Germany
Mail: logi@bluetti.de
@ bluetti.inc @ bluetti_inc
@bluetti_official
Company: POWEROAK ENERGY UK CO.,LTD
Address: Unit 2 NorthGate, Bolsover Business Park,
Woodhouse Lane Chesterfield England, S44 6BD
Mail:poweroak.eu@bluetti.com
Wire Transfer
switch
EP600
BACKUP
terminal
L1
L2
L3
N
L1
L2
L3
N
L1
L2
L3
N
Pin 2
Pin 6
Pin 10
Pin 14
Pin 4
Pin 8
Pin 12
Pin 16
Pin 1
Pin 5
Pin 9
Pin 13
Public
grid
Essential
loads
The arrow inside the CT
points to the grid

1 . Positive metal core
2. Negative metal core
7-9mm
7-9mm
2
1
Crimping pliers
Press
MC4 Wrench
1 . Positive metal core
2. Negative metal core
1
2
1
3
56
2
4
L2 is 3mm longer than L1
L2=L1+3mm
L1
1 . Protective cover of AC junction box
2. M32 PG waterproof joint
1 . AC cable
2. Protective cover of AC junction
box
3. M4×12 screws
Screws Max 1.2 N.m
1. Terminal
2. M5 screws
3. 4mm2×5C cable
4. Junction box load symbol
Screws MAX 1.8 N.m
Screws
MAX 1.8 N.m
2
3
4
1
1
2
3
4
2
1
1
2
3
NOTE: It is forbidden to connect the grid cables to the
BACKUP interface of EP600.
3. Electrical connection
4. Power on 5. Service and contact
3.3 Connect the Grounding Cables 3.5 Connect the battery power cables
3.4 Connect the GRID and BACKUP cables 3.6 Connect PV cables
Conductor
cross-sectional
area:
2.5mm2~4mm2
PV1+:To solar panel positive
PV1-:To solar panel negative
PV1 PE:PV1 to solar panel
ground
PV2+:To solar panel positive
PV2-:To solar panel negative
PV2 PE:PV2 to solar panel
ground
NOTE: Please check the open circuit voltage of PV arrays,
which should be less than 500V.
Pay attention to the direction,
the direction of the arrow
towards the grid.
GRID-L1
GRID-L2
GRID-L3
NOTE:
1. The arrow inside the CT points to the grid.
2. Phase sequence: L1 to R, L2 to S, L3 to T.
3. The CT should be tied to the L1, L2 and L3 cables of the
main circuit breaker of the grid.
3.7 Attach the CT 3.9 Electrical connection mode 1: DC coupling 3.10 Electrical connection mode 2: AC coupling
3.8 Install the transfer switch
NOTE:
1.The neutral cable from the BACKUP teminal of EP600 cannot
be connected to the neutral cable of the public grid.
2.Connect the L1/L2/L3/N wires from EP600 BACKUP terminal
and public grid to the input side of the transfer switch, and the
output side to the essential loads.
3.If the grid is stable, turn to “II” to use the public grid to
power the loads; otherwise turn to “I” to use EP600 UPS
mode to avoid the inconvenience caused by power outage.
4.If EP600 ESS fails, turn to “II” and contact BLUETTI
Customer Support.
NOTE:
The meter is for EP600 ESS with grid-tied
PV inverter only.
1) Connect UA/UB/UC/UN cables to the
L1/L2/L3/N of PV inverter.
2) Connect the CT to the Meter and tie
them to L1/L2/L3 cables of the PV inverter.
3) Connect the 485-A red wire to pin 21,
485-B black wire to pin 22.
Step 1 Switch on the DC circuit breakers on EP600.
Step 2 Switch on the DC circuit breakers on B500 battery packs. Press and hold the power button of any
battery pack for about 3 seconds, and the green indicator on the button will light up.
Step 3 About 40 seconds later, the indicator on EP600 will stay green.
Step 4 Switch on the AC circuit breakers connected to the EP600 GRID terminal.
Step 5 Power on the system via BLUETTI app.
Step 6 Check the voltage of BACKUP terminal.
Step 7 Switch on the AC circuit breakers connected to the EP600 load port.
Step 8 Check the EP600 system operation in the App.
PV
B500
EP600
PV
BAT
Grid
Back-Up
IOT CT Grid
Non-essential
Load
Essential Load
LED Indicator
•Green: Run
•Orange: Alarm
•Red: Fault
States
No alarm and
No fault Always ON
Always ON Always ON
Always ON
/
/
//
/
/Always ON
Always ON
Alarm without
fault
No alarm with
fault
Alarm and
fault
Run
Green light
Alarm
Orange light
Fault
Red light
+
-
+
-On_Grid
Breaker
Transfer Switch
Main Breaker
QFQF
B500
Essential Loads
PV Input
BackupGrid
Bat Input
RCDRCD
EP600
RCD
CT
Non-essential
Loads
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
Solar
PV User’s PV inverter Meter
(RS-485)
B500
(reserved)
EP600
CT Grid
Non-essential
Load
Essential Load
PV
BAT
Grid
Back-Up
IOT
On_Grid Breaker
Transfer Switch
Main Breaker
QF
QF
B500
+
-
Essential Loads
PV Input
Backup
RS485-A
RS485-B
Grid
Bat Input
Inverter
+
-
RCD Meter
RCD
EP600
RCD
CT
Non-essential
Loads
COM
21 22
UN
UC
UB
UA
Solar
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
A
Ua Ub Uc Ia*
* * *
Ia Ib* Ib Ic* IcN
B
C
N
Company: POWEROAK GmbH
Address: Lise-Meitner-Str. 14 28816 Stuhr Germany
Mail: logi@bluetti.de
@ bluetti.inc @ bluetti_inc
@bluetti_official
Company: POWEROAK ENERGY UK CO.,LTD
Address: Unit 2 NorthGate, Bolsover Business Park,
Woodhouse Lane Chesterfield England, S44 6BD
Mail:poweroak.eu@bluetti.com
Wire Transfer
switch
EP600
BACKUP
terminal
L1
L2
L3
N
L1
L2
L3
N
L1
L2
L3
N
Pin 2
Pin 6
Pin 10
Pin 14
Pin 4
Pin 8
Pin 12
Pin 16
Pin 1
Pin 5
Pin 9
Pin 13
Public
grid
Essential
loads
The arrow inside the CT
points to the grid

1 . Positive metal core
2. Negative metal core
7-9mm
7-9mm
2
1
Crimping pliers
Press
MC4 Wrench
1 . Positive metal core
2. Negative metal core
1
2
1
3
56
2
4
L2 is 3mm longer than L1
L2=L1+3mm
L1
1 . Protective cover of AC junction box
2. M32 PG waterproof joint
1 . AC cable
2. Protective cover of AC junction
box
3. M4×12 screws
Screws Max 1.2 N.m
1. Terminal
2. M5 screws
3. 4mm2×5C cable
4. Junction box load symbol
Screws MAX 1.8 N.m
Screws
MAX 1.8 N.m
2
3
4
1
1
2
3
4
2
1
1
2
3
NOTE: It is forbidden to connect the grid cables to the
BACKUP interface of EP600.
3. Electrical connection
4. Power on 5. Service and contact
3.3 Connect the Grounding Cables 3.5 Connect the battery power cables
3.4 Connect the GRID and BACKUP cables 3.6 Connect PV cables
Conductor
cross-sectional
area:
2.5mm2~4mm2
PV1+:To solar panel positive
PV1-:To solar panel negative
PV1 PE:PV1 to solar panel
ground
PV2+:To solar panel positive
PV2-:To solar panel negative
PV2 PE:PV2 to solar panel
ground
NOTE: Please check the open circuit voltage of PV arrays,
which should be less than 500V.
Pay attention to the direction,
the direction of the arrow
towards the grid.
GRID-L1
GRID-L2
GRID-L3
NOTE:
1. The arrow inside the CT points to the grid.
2. Phase sequence: L1 to R, L2 to S, L3 to T.
3. The CT should be tied to the L1, L2 and L3 cables of the
main circuit breaker of the grid.
3.7 Attach the CT 3.9 Electrical connection mode 1: DC coupling 3.10 Electrical connection mode 2: AC coupling
3.8 Install the transfer switch
NOTE:
1.The neutral cable from the BACKUP teminal of EP600 cannot
be connected to the neutral cable of the public grid.
2.Connect the L1/L2/L3/N wires from EP600 BACKUP terminal
and public grid to the input side of the transfer switch, and the
output side to the essential loads.
3.If the grid is stable, turn to “II” to use the public grid to
power the loads; otherwise turn to “I” to use EP600 UPS
mode to avoid the inconvenience caused by power outage.
4.If EP600 ESS fails, turn to “II” and contact BLUETTI
Customer Support.
NOTE:
The meter is for EP600 ESS with grid-tied
PV inverter only.
1) Connect UA/UB/UC/UN cables to the
L1/L2/L3/N of PV inverter.
2) Connect the CT to the Meter and tie
them to L1/L2/L3 cables of the PV inverter.
3) Connect the 485-A red wire to pin 21,
485-B black wire to pin 22.
Step 1 Switch on the DC circuit breakers on EP600.
Step 2 Switch on the DC circuit breakers on B500 battery packs. Press and hold the power button of any
battery pack for about 3 seconds, and the green indicator on the button will light up.
Step 3 About 40 seconds later, the indicator on EP600 will stay green.
Step 4 Switch on the AC circuit breakers connected to the EP600 GRID terminal.
Step 5 Power on the system via BLUETTI app.
Step 6 Check the voltage of BACKUP terminal.
Step 7 Switch on the AC circuit breakers connected to the EP600 load port.
Step 8 Check the EP600 system operation in the App.
PV
B500
EP600
PV
BAT
Grid
Back-Up
IOT CT Grid
Non-essential
Load
Essential Load
LED Indicator
•Green: Run
•Orange: Alarm
•Red: Fault
States
No alarm and
No fault Always ON
Always ON Always ON
Always ON
/
/
//
/
/Always ON
Always ON
Alarm without
fault
No alarm with
fault
Alarm and
fault
Run
Green light
Alarm
Orange light
Fault
Red light
+
-
+
-On_Grid
Breaker
Transfer Switch
Main Breaker
QFQF
B500
Essential Loads
PV Input
BackupGrid
Bat Input
RCDRCD
EP600
RCD
CT
Non-essential
Loads
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
Solar
PV User’s PV inverter Meter
(RS-485)
B500
(reserved)
EP600
CT Grid
Non-essential
Load
Essential Load
PV
BAT
Grid
Back-Up
IOT
On_Grid Breaker
Transfer Switch
Main Breaker
QF
QF
B500
+
-
Essential Loads
PV Input
Backup
RS485-A
RS485-B
Grid
Bat Input
Inverter
+
-
RCD Meter
RCD
EP600
RCD
CT
Non-essential
Loads
COM
21 22
UN
UC
UB
UA
Solar
L1 L2 L3 N PE L1 L2 L3 N PE
1 5 9 13
2 10 14 4 8 12 166
4mm²
4mm²
4mm²
CT-3
CT-2
CT-1
CT-3
CT-2
CT-1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
A
Ua Ub Uc Ia*
* * *
Ia Ib* Ib Ic* IcN
B
C
N
Company: POWEROAK GmbH
Address: Lise-Meitner-Str. 14 28816 Stuhr Germany
Mail: logi@bluetti.de
@ bluetti.inc @ bluetti_inc
@bluetti_official
Company: POWEROAK ENERGY UK CO.,LTD
Address: Unit 2 NorthGate, Bolsover Business Park,
Woodhouse Lane Chesterfield England, S44 6BD
Mail:poweroak.eu@bluetti.com
Wire Transfer
switch
EP600
BACKUP
terminal
L1
L2
L3
N
L1
L2
L3
N
L1
L2
L3
N
Pin 2
Pin 6
Pin 10
Pin 14
Pin 4
Pin 8
Pin 12
Pin 16
Pin 1
Pin 5
Pin 9
Pin 13
Public
grid
Essential
loads
The arrow inside the CT
points to the grid
Other manuals for EP600
12
Table of contents
Other Bluetti Storage manuals
Popular Storage manuals by other brands

Multitel
Multitel Fusion user manual

HP
HP Pavilion p6000 - Desktop PC Replacement instructions

Seagate
Seagate EE25 Series product manual

Synology
Synology DiskStation DS1819+ Hardware installation guide

SMART Embedded Computing
SMART Embedded Computing Penguin Edge NVME-M.2-1TB quick start guide

Overland Tandberg
Overland Tandberg NEOs T24 quick start guide