Page 1 of 23
350 KW EVSE CHARGER
OCUMENT TITLE
BTC Power EVSE Power Charger
Installation and ser Manual
R
EVI
SION HISTORY
Rev ate ECN # escription of BTCPower
EVSE
ORIGINATOR
raft 10/19/18

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 2 of 23
TABLE OF CONTENTS
Contents
1. Safety Guidelines ...................................................................................................................... 3
2. Installation ................................................................................................................................. 4
2.1 ADA Consideration ............................................................................................................. 4
2.2 Equipment Description ...................................................................................................... 5
1. DCFC “Power Box” specifications: ......................................................................................... 9
2. DCFC EVDSP-350-5-480-0-1-C-3-0 (CHAdeMO + CCS) .........................................................12
3. DCFC EVDSP-350-3-480-0-2-C-3-0 (Dual CCS) ......................................................................12
Fig. 3 Dispenser DC Input, Auxiliary, Optical Connection, Auxiliary .........................................13
4. Output Coupler (Part of Dispenser) ........................................................................................15
5. Electrical and communication service connection ...............................................................15
6. Mounting procedures ..............................................................................................................16
7. Operation ..................................................................................................................................17
a. Error codes ........................................................................................................................17
b. Communication cabling between dispenser and tower .................................................17
c. Charging a vehicle ................................................................................................................17
10. Dispenser Template ..............................................................................................................18
11. Power Conversion Tower Template ....................................................................................19
12. Maintenance ..........................................................................................................................20
a. Maintenance Precautions .................................................................................................20
b. Maintenance Items ............................................................................................................20
c. Visual Check Items ...............................................................................................................20
d. Replacement of Fixed-Life Components ............................................................................20
13. Warranty ................................................................................................................................20
14. Appendix ...............................................................................................................................20
PLEASE NOTE
This user’s manual includes the latest information at the time of printing. BTC Power, Inc.
(BTCPower) reserves the right to make changes to this product without further notice. Changes or
modifications to this product by other than an authorized service facility could void the product
warranty.
If you have questions about the use of this product, contact your customer service representative.
Refer to the Customer Support section located in this guide.

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 3 of 23
IMPORTANT SAFETY INSTRUCTIONS
1. SafetyGuidelines
WARNING
READ THIS MAN AL BEFORE YO BEGIN
EVSE (Electric Vehicle Supply Equipment) manages electricity and may be hazardous. Failure to
follow the below precautions and the anger, Warning and Caution instructions in this manual may
result in serious injury. Follow all rules, codes and laws that apply to your area and installation
guidelines.
IMPORTANT SAFETY INSTR CTIONS
The following symbols may be found in your handbook or on labels affixed to your conductive charge
station:
DANGER
anger indicates a hazard or unsafe practice which, if not
avoided, will result in severe injury or possibly death.
WARNING
Warning indicates a hazard or unsafe practice which, if not
avoided, may result in severe injury or possibly death.
CA TION
Caution indicates a hazard or unsafe practice which, if not
avoided, may result in minor injury
NOTE:
Important information to consider, otherwise, improper
installation and/or damage to components may occur.

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 4 of 23
WARNING
There are no user serviceable parts inside. For service please contact customer service or your local
distributor. DO NOT ATTEMPT TO REPAIR THE CHARGE STATION YO RSELF ONLY FACTORY
Q ALIFIED PERSONEL.
WARNING
If your supply cable is somehow damaged do not operate your charge station. Contact your service
representative for service immediately. Shut down the power to the unit by switching the breaker on
the supply panel to the off position.
2. Installation
Safety instructions
The EVSE (Electric vehicle supply equipment) should be installed by a qualified electrician in
accordance with local codes and all applicable ordinances
The charging station is required to be connected to a ground, metal, permanent wiring system.
Connections to the charge station should comply with all local codes and ordinances.
Read all installations instructions carefully prior to performing the installation.
WARNING:
This device utilizes high voltages do not attempt to install this equipment if you are not a qualified
electrician.
2.1 ADA Consideration
STANDARDS FOR ACCESSIBLE DESIGN for Americans with Disabilities is applicable when choosin the location and
placement of all Electric Vehicle Supply Equipment. The followin is a direct excerpt from the 2010 ADA Standards for
Accessible Desi n:
http://www.ada. ov/2010ADAstandards_index.htm
“The Department of Justice published revised re ulations for Titles II and III of the Americans with Disabilities Act of
1990 “ADA” in the Federal Re ister on September 15, 2010. These re ulations adopted revised, enforceable
accessibility standards called the 2010 ADA Standards for Accessible Desi n “2010 Standards” or “Standards”. The
2010 Standards set minimum requirements – both scopin and technical -- for newly desi ned and constructed or
altered State and local overnment facilities, public accommodations, and commercial facilities to be readily accessible
to and usable by individuals with disabilities.
Adoption of the 2010 Standards also establishes a revised reference point for Title II entities that choose to make
structural chan es to existin facilities to meet their pro ram accessibility requirements; and it establishes a similar
reference for Title III entities undertakin readily achievable barrier removal.

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 5 of 23
The Department has assembled this online version of the official 2010 Standards to increase its ease of use. This
version includes:
2010 Standards for State and Local Government Facilities Title II
2010 Standards for Public Accommodations and Commercial Facilities Title III
The Department has assembled into a separate publication the revised re ulation uidance that applies to the
Standards. The Department included uidance in its revised ADA re ulations published on September 15, 2010. This
uidance provides detailed information about the Department’s adoption of the 2010 Standards includin chan es to
the Standards, the reasonin behind those chan es, and responses to public comments received on these topics. The
document, Guidance on the 2010 ADA Standards for Accessible Desi n, can be downloaded from:
http://www.ada. ov
For information about the ADA, includin the revised 2010 ADA re ulations, please visit the Department’s website
www.ADA. ov; or, for answers to specific questions, call the toll-free ADA Information Line at 800- 514-0301 (Voice) or
800-514-0383 (TTY).”
2.2 Equipment Description
WARNING
• Char er may be installed outdoors but only use under environments specified within this specification.
• Only qualified personnel should work on this equipment.
• Do not perform any live wire operations.
• Only qualified skilled in electric services personnel shall perform maintenance checks.
• DO NOT touch the inside of the device while it is runnin .
WARNING
• This device includes capacitive components such as electrolytic capacitors. Some parts still remain charged
inside of the unit even after the input power is disconnected.
• This device utilizes hi h volta es do not attempt to install this equipment if you are not a qualified electrician.

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 6 of 23
1. 50kW #1 Power Module
2. 50 kW #2 Power Module
3. 50 kW #3 Power Module
4. 50 kW #4 Power Module
5. Output Contactors (+/-) power module
#1
6. Output Contactors (+/-) power module
#2
7. Output Contactors (+/-) power module
#3
8. Output Contactors (+/-) power module
#4
9. Air Cooling Vent
10. Master Controller
11. Safety Relays
12. 24vdc Power Supply
13. 5, 12, 15, -15 vdc Power Supply
14. Output Section
15. Input Section
16. Optical Modem Transceiver Option
200 KW Power Enclosure
Component escription
1
2
6
3
4
7
8
10
13
12
14
9
15
5
11
16

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 7 of 23
1. 15-inch outdoor rated display and touch
screen.
2. Encrypted insert card reader.
3. High security lock.
4. High powered CHAdeMO coupler.
5. High powered CCS/Combo charge coupler.
6. LE lighting.
7. Stop button / Function key 1.
8. Start button / Function key 2.
9. Function key 3.
350 KW Charge ispenser
Component escription
Equipment specifications:
System Components:
Copy ESCRPTION PART NUMBER
1 DCFC “Power Box” Sin le Output
2 DCFC “Power Box” Quad output
3 DCFC Dispenser, CCS/CHAdeMO
6
1
7, 8, 9
3
4
5

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 8 of 23
Simplified Block Diagram of Single System:
Top level system capabilities (350 KW):
Parameter
Specification
Input voltage
480 VAC
3 Phase +/
-
10%, (432
–
528 VAC)
Output voltage range, CCS only
200
-
920 V C
Output voltage range, CHAdeMO
only
50-500 V C
Maximum output current, CCS only
(non
–
continuous)
500 Amps
Maximum output current, CCS only
continuous
500Amps. Please see note below
Note:
Rating of the H & S liquid cooled cable
subsystem is to be evaluated for continuous
operation
Rating of all other components except H & S
liquid cooled cable are rated for continuous 500
Amp operation.
200 KW
Power Box
Sin le Output Coolin system 350 KW
Dispenser
Sin le CCS1
CCS 1
Vehicle
C Outputs Wired in Parallel
200 KW
Power Box
Sin le Output

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 9 of 23
Maximum output current,
CHAdeMO only, (non –
conti
nuous)
250 Amps
Maximum output current,
CHAdeMO only, continuous
200 Amps
System efficiency
Greater than 92%
Power converter efficiency
Greater than 94% at full power
Maximum output power
200
kW
Operating Temperature
-
30 C to + 50 C
Operating
Altitude
9,320 ft.
Relative Humidity
95% non
-
condensing
ispenser input auxiliary power 120 vac (Single phase), 20 Amps. Both
CHAdeMO + CCS and CCS + CCS models.
Connectors available, CCS only
HPC
-
CCS Huber + Suhner
Connectors available, CHAdeMO
only
SEI Sumitomo Electric 200 Amp Continuous
SEI Sumitomo Electric 250 Amp Non -
Continuous
3.DCFC“PowerBox”spe ifi ations:
AC to DC Power Converter Specifications (Per Power Box, 2 Req.)
BTC PN: EVPC-200-2-480-3 ( ual
Output)
BTC PN: EVPC-200-1-480-3 (Single
Output)
Parameter Specification Specification
Input Volta e Ran e
480 VAC, three phases, +10%, -10% 480 VAC, three phases, +10%, -10%
Input Current @ 480 VAC 240 Amps 240 Amps
Frequency 47 – 63 Hz for three phase inputs 47 – 63 Hz for three phase inputs
Power Quality IEEE-519 and IEC 6200-3-4 IEEE-519 and IEC 6200-3-4
C Output
Maximum Power 200 KW 200 KW
Max Output Current 500 Amps CCS, 250 Amps CHAdeMO 500 Amps CCS
Minimum Current (In
current mode)
5 Amps 5 Amps
DC Output v
olta e ran e
50-920 VDC 50-920 VDC
Efficiency > 95% (at full load) power sta e only > 95% (at full load) power sta e only
Power Factor
> 0.99 full load > 0.99 full load
Outdoor enclosure NEMA 4, IP 54 equivalent NEMA 4, IP 54 equivalent
Dimensions (Refer to
DWG 200KW-AFE-T-
00.PDF)
80” Hi h, 41” Width, 33” Deep
Estimated wei ht, 1,800 lbs.
80” Hi h, 41” Width, 33” Deep
Estimated wei ht, 1,800 lbs.

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 10 of 23
Modularity Power can be switched from one
output to the other in increments of
45 kW
Ripple current < 15 A p-p, Maximum allowable peak
to peak HVDC output current ripple,
1kHz bandwidth limited
< 15 A p-p, Maximum allowable peak
to peak HVDC output current ripple,
1kHz bandwidth limited
AC to DC Power Converter Fault Protection and Safety Features
Converter compliance matrix
Feature Specification Specification
HI pot withstand
UL 2231-1/2, UL 840 UL 2231-1/2, UL 840
Insulation resistance UL 2231-1/2, UL 840 UL 2231-1/2, UL 840
Output volta e re ulation +/- 2%, no load +/- 2%, no load
Over temperature Self-protected and latched Self-protected and latched
Input AC Over volta e
detection
1msec non-latched 1msec non-latched
Input AC Under volta e
detection
1msec non-latched 1msec non-latched
Input AC Over Current 1msec latched 1msec latched
Input AC fused
Input AC GFCI GFCI module ran e 30 mA. GFCI module ran e 30 mA.
Output DC over volta e 570 VDC latched 570 VDC latched
Output DC short circuit Shut down Shut down
CAN communication loss 1 sec shut down upon loss of
connection
1 sec shut down upon loss of
connection
AC input sur e 6 KV requirement per UL 2231,
EMC requirements
6 KV requirement per UL 2231,
EMC requirements
External Remote E-Stop Remove hi h power if external
E-stop is activated
Remove hi h power if external
E-stop is activated
AC Converter – Input terminal block
A Single AC input terminal block is used to connect the AC utility to the AC to C Power Converter
AC Line Side Load Side
Wire Ran e Openin per pole Wire Ran e Openin per pole
350-6 2 350-6 2
Torque for all poles: 275 LB-IN

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 11 of 23
Fig. 1 AC Input
DC - Output terminal block (from converter to dispenser – single and dual high output
configuration):
From power sta es
Wire ran e Openin s per pole (terminal lu ) Terminal Lu NSI Ind. PN Torque requirement
1000-500 2
1000L2
550 LB-IN
DC Output Terminal Lugs, Channel A and B.
Torque requirement per UL E-file Mersen MP B63153
Terminal block primary side (from converter) Terminal block secondary side (to dispenser)
Wire In lbs Wire In lbs Wire In lbs Wire In lbs
2/0-#6 120 #8-#14 50 2/0-#6 120 #8-#14 50
Output Connections
Input Connections

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 12 of 23
4.DCFCEVDSP-350-5-480-0-1-C-3-0(CHAdeMO+CCS)
DC power Dispenser (Dual Cord):
Auxiliary Input Volta e 120 VAC, sin le phase, +10%, -10%
Auxiliary Input Current 20 Amps
Frequency 47 – 63 Hz for three phase inputs
Power Quality IEEE-519 and IEC 6200-3-4
Maximum Output Power CCS 350 KW.
Maximum DC Output Current CCS, non-
continuous
500 Amps.
Maximum DC Output Current CCS,
continuous
Note:
Ratin of the H & S liquid cooled cable subsystem
is to be evaluated later for continuous operation
Ratin of all other components except H & S liquid
cooled cable are for continuous 500 Amp
operation.
Maximum Output Power CHAdeMO 100 KW.
Maximum DC Output Current CHAdeMO,
non-continuous
250 Amps.
Maximum DC Output Current CHAdeMO,
continuous
200 Amps
Minimum Current (In current mode) 5 Amps
DC power input volta e ran e 50-920 VDC
DC power input current ran e 5 Amps – 500 Amps
Outdoor enclosure NEMA 4, IP 54 equivalent
Chilled 50/50 ethylene lycol 20 C input Temperature, Flow rate = 10 l/min.
Wei ht 600 lbs.
5.DCFCEVDSP-350-3-480-0-2-C-3-0(DualCCS)
DC power Dispenser (Single Cord):
Auxiliary Input Volta e 120 VAC, sin le phase, +10%, -10%
Auxiliary Input Current 20 Amps
Frequency 47 – 63 Hz for three phase inputs
Power Quality IEEE-519 and IEC 6200-3-4
Maximum Output Power CCS 200 KW.
Maximum DC Output Current CCS, non-
continuous
500 Amps.
Maximum DC Output Current CCS,
continuous
Note:
Ratin of the H & S liquid cooled cable subsystem is
to be evaluated later for continuous operation

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 13 of 23
Ratin of all other components except H & S liquid
cooled cable are for continuous 500 Amp operation.
Minimum Current (In current mode) 5 Amps
DC power input volta e ran e 50-920 VDC
DC power input current ran e 5 Amps – 500 Amps
Outdoor enclosure NEMA 4, IP 54 equivalent
Chilled 50/50 ethylene lycol 20 C input Temperature, Flow rate = 10 l/min.
Wei ht 600 lbs.
350 / 50 KW Dispenser DC input terminal block and wire gage:
LINE SI E PART NUMBER
WIRE RANGE OPENINGS PER POLE PART NUMBER AMPERE
RATING
Units MCM (Compression Lu )
1000-250 2 2-1000L2 545
Fig.2DispenserDCInput,Auxiliary,Opti alConne tion,Auxiliary

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 14 of 23
Auxiliary – 120 VAC Single Phase, 20 Amps
Optical Transceiver – Connection and fiber requirements.
Suggest: Industrial wide temperature

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 15 of 23
Interlock – 18 gage twisted pair, shielded. Suggested PN McMaster
6.OutputCoupler(PartofDispenser)
CCS-1, Huber + Suhner high powered liquid cooled coupler.
Please refer to Huber + Suhner specification for additional details.
Cable Len th:
o 4.5 meter outside len th (standard)
o Optional lon er len th available
Cable Mana ement System:
o None. This will be a non-retractable cable system
7.Ele tri aland ommuni ationservi e onne tion
ispenser requirements.
The dispenser requires the following:
a. C input from the tower.
b. Auxiliary power from main circuit panel. The auxiliary power is used to power the heat
exchanger as well, payment system as well as display module.
c. Communication conduit between the tower and the dispenser. For this purpose, the BTC
dispenser and tower utilize optical wire for communication.
Tower (converter) requirements.

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 16 of 23
a. 480 VAC 3 phase input and ground from the main power cabinet.
b. Communication conduit between the tower and the dispenser.
8.9.Mountingpro edures
Tools and ancillary equipment
1. Philips head screw driver.
2. QTY 4, ½” x 3-3/4” concrete expansion studs.
3. ½‘” torque wrench.
4. Allen wrench set for electrical connections.
5. Keys (shipped with unit), to be used to open the access panels.
Concrete pad installation requirements.
Use 4 (minimum 4) 1/2” x 3-3/4” (McMaster-Carr 91578A116 or equivalent) concrete expansion studs to anchor the
steel dispenser and cabinet with the BTCP EV Char in Station.
WARNING
BTCP EV Char in Station can only be installed onto undama ed concrete slab.
A minimum of 4 expansion bolts should be mounted on the bottom enclosure foot.
To install the expansion studs please follow the followin steps:
Installation Steps
1. Drill a hole at location specified. Clean hole thorou hly
PLEASE NOTE: Drill depth per manufacturer recommendation.
WARNING
If the drill len th is less than specified, then bolt will bottom out prior to en a in the bottom installation footer
on the BTCP EV char in station. The system will be able to be rocked or moved.
2. Insert the expansion bolt sleeve entirely in the hole without the fixture as shown in fi . 2 above.
3. Position the fixture to be anchored, twist the expansion bolt until it is flush with the fixture. Place
enclosure.
4. Ti hten the expansion bolt to the specified installation torque.

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 17 of 23
9.Operation
a. Error codes
Error
Code
Message Description Change
100 No MCU Communication This is an application fault. As soon as system resumes, the fault is cleared.
110 Card ready not available This is an application fault. As soon as system resumes, the fault is cleared.
120 No internet network This is an application fault. As soon as system resumes, the fault is cleared.
200 Not ready from PCM This is a hard fault that results in “out of
service”
Press STOP and then START to restart the application to clear
the fault
210 Safety Error
Please turn E-STOP knob to remove error.
If fails to start on 2nd attempt, call to
customer service no.
Please turn E-STOP knob to Enable Charger. If fails to start on
2nd attempt call to customer service no.
220 Over voltage This is a hard fault that results in “out of
service”
Press STOP and then START to restart the application to clear
the fault
230 Over current This is a hard fault that results in “out of
service”
Press STOP and then START to restart the application to clear
the fault
240 Over temperature This is a hard fault that results in “out of
service”
Press STOP and then START to restart the application to clear
the fault
260 Charger door is open Front or side door is not completely closed Please close the door and try again...
270 Emergency Stop Please turn ESTOP knob to remove error. Please turn E-STOP knob to Enable Charger
300 Over voltage from vehicle
This error is generated by the vehicle and
results in termination of the charge. Contact Customer Service
310 Under voltage from
vehicle
This error is generated by the vehicle and
results in termination of the charge. Contact Customer Service
320 Current deviation from
vehicle
This error is generated by the vehicle and
results in termination of the charge. Contact Customer Service
330 High battery temperature This error is generated by the vehicle and
results in termination of the charge. Suspend charging for a time
340 Voltage deviation error This error is generated by the vehicle and
results in termination of the charge. Contact Customer Service
250 No CAN communication Most likely the charge connector is
improperly placed. Reinsert the charge connector and Restart
b. Communication cabling between dispenser and tower (TBD)
c. Charging a vehicle (TBD)
Power Units
240 FLA

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 18 of 23
10.DispenserTemplate

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 19 of 23
11.PowerConversionTowerTemplate

This document is the Property of Broadband Telecom Power Inc. and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus or BTCPower without written permission.
BTCPower 350 KW EVSE Installation manual Draft
Page 20 of 23
12.Maintenan e
ANGER
REA AN FOLLOW THE “SAFETY CONCERNS” AT THE BEGINNING OF THIS MANUAL BEFORE USING THIS EVICE
a. Maintenance Precautions
Each of the capacitors in this device have a hi h volta e for a time after shuttin off the input power supply. Allow 5
minutes after powerin down before servicin internal components.
b. Maintenance Items
Perform periodic checks.
c. Visual Check Items
1. Check for abnormal sound from runnin fans and power units. If there is abnormal sound, please contact a
BTC Power representative for further assistance.
2. Check for abnormal odor, chan es of inner materials, corrosion, anomaly in appearance, etc., in this
device. If there are any anomalies, please contact a BTC Power representative for further assistance.
3. Check for dust and dirt in this device re ularly and, if any is found, clean usin appropriate procedures.
d. Replacement of Fixed-Life Components
To prevent the device from failure due to worn out components, it is necessary to replace the components before
they reach the end of their lifespan. Use the followin replacement intervals as a uideline for the estimate of the
total runnin time. Please contact a BTC Power representative for further assistance when you replace the parts.
• Power feed cable: Approximately three (3) years.
• Intake and exhaust filters: Approximately three (3) years.
• Please keep in mind that the replacement interval of each part can vary dependin on, for example, the usa e
environment of the device.
13.Warranty
LIMITED WARRANTY – ELECTRIC VEHICLE S PPLY EQ IPMENT
BTCPower shall provide the following warranty with respect to product.
Product 2-years parts, 2-years factory labor.
Warranty shall not include any BTCs of vandalism or physical abuse of the equipment.
BTCPower, Inc. (“BTCP”) warrants this electric vehicle charging product to be free from defects in
material, manufacture and design for the period specified after the date of the first installation. If this
product is defective in materials, manufacture or design during this warranty period, BTCPower will,
at its option, repair or replace the product. Repair parts and /or replacement products may be either
new or reconditioned at BTCPower’ s discretion. This limited warranty does not include service to
repair damage from improper installation, improper connections with peripherals, external electrical
fault, accident, disaster, misuse, abuse or modifications to the product not approved in writing by
BTCPower.
Any service repair outside the scope of this limited warranty shall be at applicable rates and terms
then in effect. All other express and implied warranties for this product including the warranties of
merchantability and fitness for a particular purpose, are hereby disclaimed. Some states do not allow
the exclusion of implied warranties or limitations on how long an implied warranty lasts so the above
Table of contents
Other BTCPower Batteries Charger manuals