8
)
!
!
!
1. Fill!the!base!with!water!or!sand!and!close!it!with!the!cap.!
!
2. Assemble!together!upper!pole!W.!and!middle!pole!X.!Insert!lower!pole!Y. ! i n t o ! m i d d l e !pole!X.!
Check!where!the!holes!are!located!so!that!you!can!insert!the!screws!afterwards.!
!
3. Install!triangle!bracket!Q.!on!middle!pole!X.!with!bolts!G1.,!G2.!and!G3.!
!
4. Once!the!pole’s!joint!is!polished!and!adapted!to!the!pole’s!base,!firmly!tap!the!base!of!the!
pole!several!times!on!a!piece!of!wood!or!cardboard.!
!
5. Put! the! 3! poles! W.,! X.! and! Y. ! together! with! bolts! E1.,! E2.! and! E3.!
Insert!simultaneously!wheel!shaft!V. ! into ! base!BB.,!then!into!wheels!M.!and!into!lower!pole!Y. !
Make!sure!that!Q.!is!facing!the!back.!
!
6. Attach!the!U1.!&!U2.!rods!on!lower!pole!Y.!and!on!base!BB.!With!bolts!D1.,!D2.!and!D3.!and!
bolts!J1.,!J2.!and!J3.!Watch!out!for!the!up!and!down!directions!of!the!rods.!
!
7. Assemble!ring!AA.,!panel!DD.!and!triangle!bracket!CC.!with!bolts!F1.,!F2.!and!F3.!and!bolts!I1.,!
I2.!and!I3.!
N.B!.:!The!2!small!L.!springs!are!attached!on!the!front!of!the!2!upper!AA!holes.!with!bolts!F1.,!
F2.!and!F3.!
!
8. Pull!the!2!sides!of!triangle!brackets!CC!and!fix!the!top!parts!behind!the!DD.!Panel!with!screw!
K1.!Then!fix!the!S.!&!T.!tubes!on!the!CC.!triangle!bracket!with!bolts!B1.,!B2.,!B3.,!B4.!and!B5.!
Note!that!B3.!must!be!installed!inside!CC.!
!
9. Install!T.!and!S.!on!W.!with!bolts!C1.,!C2.,!C3.!and!C4.!
!
10. Attach!the!top!part!of!external!tube!with!handle!HH.!On!the!end!of!the!longest!tube!T.! with!
bolts!A1.,!A2.,!A3.!and!A4.!Note!that!A2.!must!be!installed!between!T.!and!HH.!
!
11. Attach!the!end!of!the!internal!tube!GG.!on!Q.!with!bolts!H1.,!H2.!and!H3.!
!
12. Attach!EE.!and!FF.!on!the!shorter!tubes!S.!in!order!to!prepare!the!installation!of!big!springs!R.!
!
13. Attach!part!of!R.!on!the!hole!of!the!triangle!bracket!CC.!and!then!hang!the!other!end!of!R.!
with!EE.!and!FF.!
!
14. Install!the!P. !net!on!AA.!Ring!and!press!N.!on!W.!
)
+)HEIGHT)ADJUSTMENT)-)Raise)or)lower)the)HH)adjustment)handle.))
MOVING)THE)SYSTEM)-)Set)the)height)of)the)portable)basketball)net)to)the)lowest.)
While)holding)the)pole,)rock)the)entire)system)forward)until)the)wheels)touch)the)
ground.) Then) move) it) where) you) want.) Flip) the) system) vertically) and) check) its)
stability.)