SMARTSTACK FAST ETHERNET SWITCH
1000BASE-LX GIGABIT ETHERNET
EXPANSION MODULE
Cabletron’s EPIM1000-S1LX 1000Base-LX Gigabit
Ethernet Expansion Module provides a long-
wavelength (1300 nm) Gigabit port that can be used for
a high-speed backbone or server connections. It
contains one 1000Base-LX port that can be connected
to a site up to 5 km (16,404 ft) away with single-mode
fiber cable.
Gigabit Port LEDs
Port LEDs are provided for the module on the front
panel of the switch. These LEDs provide port status for
“at-a-glance” network monitoring. The following table
details the indicator functions provided by the ELS100-
S24TX2M:
sDELeludoMnoisnapxE
sDEL noitidnoC sutatS
kniLnOnodehsilbatseneebsahknildilavA
.tropeht
gnihsalFro,delbasidyllaunamneebsahtroP
oteudmetsysehtybdenoititrap
.srorreevissecxe
sutatSnO.tolssihtnidellatsnisieludomA
ytivitcAgnihsalF.tropehthguorhtgnissapsiciffarT
INSTALLING THE MODULE
CAUTION: The EPIM1000-S1LX module is designed
for the ELS100-S24TX2M switch only. Do not try to
install this module in any other units.
The EPIM1000-S1LX Expansion Module installs in
either of the two lower slots on the rear panel of the
ELS100-S24TX2M switch. Do not install this module in
the switch’s upper slot. To install the module, follow the
instructions below.
Equipment Checklist
After unpacking the EPIM1000-S1LX Expansion
Module, check the contents of the box to be sure you’ve
received the following items:
•One EPIM1000-S1LX Expansion Module
•This document
Handling the Module
CAUTION: The EPIM1000-S1LX Expansion Module
can easily be damaged by electrostatic discharge.
To prevent electrostatic damage, observe the following
guidelines:
•Do not remove the module from its packaging until
you are ready to install it.
•Do not touch any of the module’s pins, connectors
or components.
•Hold the module only by its edges or front panel.
•Wear an anti-static wristband connected to a
suitable earth ground whenever handling the
module.
•Store or transport this module only in appropriate
anti-static packaging.
Instructions
CAUTION: The switch must be powered off before
installing or replacing any module.
1. Power off the switch: Disconnect the AC power
cord from the switch. If a redundant power unit
(RPU) is present, disconnect its DC cable
connection to the switch.
2. Remove network cables: If you are replacing a
module, remove the cable attached to the port on
the module.
3. Loosen the screws on the installed module or
slot faceplate: Using your fingers or a flathead
screwdriver, turn the screws securing the module
(or faceplate on the slot) in a counter-clockwise
direction until they are free of the chassis. Be sure
not to completely remove the screws from the
module or faceplate.
4. Remove the installed module or faceplate:
Firmly pull on the screws until the module is free of
the switch. Carefully slide the module straight out
of the slot.
Keep the original faceplate for future use. If you
should remove the module, replace the faceplate to
prevent dust and debris from entering the unit and
to maintain proper air flow.
5. Insert the new module into the switch: Holding
the new module with the text on the front panel
upright, carefully slide the module into the switch
slot and press gently until it snaps into place. Be
sure the new module’s front panel is flush with the
switch panel.
6. Secure the new module: Secure the new module
in place by screwing the attached screws clockwise
into the switch’s chassis. Tighten them enough to
secure the module, but not so tight as to prevent
them from being unscrewed by hand.
7. Connect the network cable: Connect fiber cable
to the port on the newly installed module. See
“Connectivity Guidelines”in this guide for further
information.
8. Power on the switch: Reconnect the previously
removed power sources to the switch. The switch’s
front-panel LEDs should indicate the status of the
new connection. Check the LED indicators for the
fiber port to ensure that they are operating
correctly. Refer to the table of LEDs in this guide
for a description of the LED indications. If the
module does not respond, see “Troubleshooting”
below.
More details concerning connection options and
network applications can be found in the
ELS100-S24TX2M Installation Guide. Information on
the module’s configuration options can be found in the
Management Guide that is included with the base unit.
TROUBLESHOOTING
If you experience any problems with the module, check
the following items before contacting Cabletron’s
Technical Support:
•Ensure the ELS100-S24TX2M switch with the
Gigabit Expansion Module is powered up.
•Ensure that the device attached to the module is
powered up and operating correctly.
•Ensure that the module is properly seated in the
slot.
•Verify that the attached device is configured to
match the communication mode used by the
module (1 Gbps, and half or full duplex).
•Check the connectors on both ends of the cable to
be sure they are properly engaged. When attaching
fiber cable to an SC-type port, be sure the plug
clicks into place to ensure that it is properly seated.
•Be sure the fiber terminators are clean. You can
clean the cable plugs by wiping them gently with a
clean tissue or cotton ball moistened with a little
ethanol. Dirty fiber terminators on fiber optic cables
will impair the quality of the light transmitted through
the cable.
SAFETY WARNING
Before installing or removing the EPIM1000-S1LX, first disconnect the
switch from the main power supply. For full safety instructions, please refer
to the user guide that accompanies the switch.
Warning:
Optical Safety for
Fiber Optic Modules
When using a fiber optic media expansion module, never look at the
transmit laser while it is powered on. Also, never look directly at the fiber
TX port and fiber cable ends when they are powered on.
Avertissment:
Ports pour fibres optiques -
sécurité sur le plan optique
Ne regardez jamais le laser tant qu'il est sous tension.
Ne regardez jamais directement le port TX (Transmission) à fibres optiques
et les embouts de câbles à fibres optiques tant qu'ils sont sous tension.
Warnhinweis:
Faseroptikanschlüsse -
Optische Sicherheit
Niemals ein Übertragungslaser betrachten, während dieses eingeschaltet ist.
Niemals direkt auf den Faser-TX-Anschluß und auf die Faserkabelenden
schauen, während diese eingeschaltet sind.
SPECIFICATIONS
Ports
1 1000Base-LX
Communication Mode
Half or full duplex,
auto-negotiation for duplex mode and flow control
Network Interface
SC connector, 1300 nm long-wavelength transceiver
62.5/125 or 50/125 micron multimode fiber cable
9/125 micron single-mode fiber (SMF) cable
Switch Method
Store-and-forward
Queue Buffer
2 Mbytes
Size
4.82 x 3.57 x 1.08 in.
(12.25 x 90.70.5 x 2.74 cm)
Power Consumption
2.4W maximum
Temperature
Operating: 32°to 122°F (0°to 50°C)
Storage: -40°to 158°F (-40°to 70°C)
Humidity
Operating: 5% to 95%
Compliances
CE Mark
Emissions
FCC Class A
EN55022 (CISPR 22) Class A
VCCI Class A
C-Tick
Immunity
IEC 1000-4-2/3/4/6
Standards
802.3z Gigabit Ethernet
ISO/IEC 8802-3
CONNECTIVITY GUIDELINES
snoitacificepSdnasepyTelbaC
elbaCepyThtgneL.xaMrotcennoC
T-esaB01PTUmho-0015,4,3.taC).tf823(m00154-JR
XT-esaB001PTUmho-0015.taC).tf823(m00154-JR
XF-esaB001norcim521/5.26ro521/05
rebifedomitlumeroc
xelpudflaH).tf4.153,1(m214TSroCS
xelpudlluF)selim42.1(mk2TSroCS
rebifedom-elgnis521/01)tf404,61(mk5TSroCS
XS-esaB0001norcim521/5.26ro521/05
rebifedomitlumeroc
gniwollofehteeS
elbat
TSroCS
XL-esaB0001FMSroFMMgniwollofehteeS
elbat
TSroCS
snoitacificepSrebiFXS-esaB0001
retemaiDrebiF htdiwdnaBladoM egnaR
norcim521/5.26 mk/zHM061)m022-2(tf227-7
mk/zHM002)m572-2(tf209-7
norcim521/05 mk/zHM004)m005-2(tf1461-7
mk/zHM005)m055-2(tf5081-7
snoitacificepSrebiFXL-esaB0001
retemaiDrebiF htdiwdnaBladoM egnaR
FMM521/5.26 mk/zHM005)tf5081-7(m055-2
FMM521/05 mk/zHM004)tf5081-7(m055-2
mk/zHM005)tf5081-7(m055-2
FMS521/01A/N)tf404,61-7(mk5-m2
retemaiDkrowteNtenrehtEtsaFmumixaM
epyTretaepeR
rebmuNdna
riaPdetsiwT
XT-ESAB001
rebiF/riaPdetsiwT
XFdnaXT-ESAB001
IssalC1)tf656(m002)tf4.558(m8.062
IIssalC1)tf656(m002)tf6.2101(m8.803
IIssalC2)tf4.276(m502)tf1.907(m2.612
Note: Network diameter is defined as the wire distance between
two end stations in the same collision domain.
EPIM1000-S1LX
1000BASE-LX
GIGABIT ETHERNET
EXPANSION MODULE
QUICK INSTALLATION GUIDE
9033265
E1099-R01
150202-102
NOTICE
Cabletron Systems reserves the right to make changes in specifications and other
information contained in this document without prior notice. The reader should in
all cases consult Cabletron Systems to determine whether any such changes have
been made.
The hardware, firmware, or software described in this manual is subject to change
without notice.
IN NO EVENT SHALL CABLETRON SYSTEMS BE LIABLE FOR ANY
INCIDENTAL, INDIRECT, SPECIAL, OR CONSEQUENTIALDAMAGES
WHATSOEVER (INCLUDING BUT NOT LIMITED TO LOST PROFITS)
ARISING OUT OF OR RELATED TO THIS MANUAL OR THE INFORMATION
CONTAINED IN IT, EVEN IF CABLETRON SYSTEMS HAS BEENADVISED
OF, KNOWN, OR SHOULD HAVE KNOWN, THE POSSIBILITY OF SUCH
DAMAGES.
1999 by Cabletron Systems, Inc., P.O. Box 5005, Rochester, NH 03866-5005
All Rights Reserved
Printed in Taiwan, R.O.C.
Order Number:9033265 October 1999
Cabletron, Cabletron Systems, and SmartSTACK are trademarks or registered
trademarks of Cabletron Systems, Inc.
Microsoft, Windows, Windows 95, Windows 98, and Windows NT are either
trademarks or registered trademarks of Microsoft Corporation.
Netscape and Netscape Navigator are trademarks of Netscape Communications
Corporation.
All other product names mentioned in this manual may be trademarks or registered
trademarks of their respective companies.
FCC NOTICE
This device complies with Part 15 of the FCC rules. Operation is subject to the
following two conditions: (1) this device may not cause harmful interference, and
(2) this device must accept any interference received, including interference that
may cause undesired operation.
NOTE:This equipment has been tested and found to comply with the limits for a
Class A digital device, pursuant to Part 15 of the FCC rules. These limits are
designed to provide reasonable protection against harmful interference when the
equipment is operated in a commercial environment. This equipment uses,
generates, and can radiate radio frequency energy and if not installed in accordance
with the operator’s manual, may cause harmful interference to radio communica-
tions. Operation of this equipment in a residential area is likely to cause interfer-
ence in which case the user will be required to correct the interference at his own
expense.
WARNING:Changes or modifications made to this device which are not expressly
approved by the party responsible for compliance could void the user’s authority to
operate the equipment.
INDUSTRY CANADA NOTICE
This digital apparatus does not exceed the Class A limits for radio noise emissions
from digital apparatus set out in the Radio Interference Regulations of the Canadian
Department of Communications.
Le présent appareil numérique n’émet pas de bruits radioélectriques dépassant les
limites applicables aux appareils numériques de la class A prescrites dans le
Règlement sur le brouillage radioélectrique édicté par le ministère des Communica-
tions du Canada.
VCCI NOTICE
EC CONFORMANCE DECLARATION
European contact: Cabletron Systems Limited
Nexus House, Newbury Business Park
London Road, Newbury
Berkshire RG13 2PZ, England
This information technology product complies with ISO/IEC Guide 22 and
EN45014. It conforms to the following specifications:
EN55022(1988)/CISPR-22(1985) Class A
EN50082-1: IEC 1000-4-2, 3, 4, 6
This information technology product complies with the requirements of
the Low Voltage Directive 73/23/EEC and the EMC Directive 89/336/
EEC and carries the CE Mark accordingly.
Only qualified personnel should perform installation
procedures.

Other Cabletron Systems Switch manuals

Cabletron Systems MicroMMAC 22ES User manual

Cabletron Systems

Cabletron Systems MicroMMAC 22ES User manual

Cabletron Systems 9E423-36 User manual

Cabletron Systems

Cabletron Systems 9E423-36 User manual

Cabletron Systems FN100 User manual

Cabletron Systems

Cabletron Systems FN100 User manual

Cabletron Systems SEHI-22 User manual

Cabletron Systems

Cabletron Systems SEHI-22 User manual

Cabletron Systems SmartSTACK ELS100-S24TX2M User manual

Cabletron Systems

Cabletron Systems SmartSTACK ELS100-S24TX2M User manual

Cabletron Systems MMAC-Plus 9T125-08 User manual

Cabletron Systems

Cabletron Systems MMAC-Plus 9T125-08 User manual

Cabletron Systems Cabletron CyberSWITCH CSX5500 User manual

Cabletron Systems

Cabletron Systems Cabletron CyberSWITCH CSX5500 User manual

Cabletron Systems 6C105 User manual

Cabletron Systems

Cabletron Systems 6C105 User manual

Cabletron Systems SmartSTACK 100 ELS100-16TX User manual

Cabletron Systems

Cabletron Systems SmartSTACK 100 ELS100-16TX User manual

Cabletron Systems MMAC-Plus 9E312-12 Technical document

Cabletron Systems

Cabletron Systems MMAC-Plus 9E312-12 Technical document

Cabletron Systems 9F122-12 User manual

Cabletron Systems

Cabletron Systems 9F122-12 User manual

Cabletron Systems 9G421-02 Technical document

Cabletron Systems

Cabletron Systems 9G421-02 Technical document

Cabletron Systems SmartSwitch 2H22 Owner's manual

Cabletron Systems

Cabletron Systems SmartSwitch 2H22 Owner's manual

Cabletron Systems CSX200 CyberSWITCH User manual

Cabletron Systems

Cabletron Systems CSX200 CyberSWITCH User manual

Cabletron Systems ATX User manual

Cabletron Systems

Cabletron Systems ATX User manual

Cabletron Systems SmartStack STS16-20R User manual

Cabletron Systems

Cabletron Systems SmartStack STS16-20R User manual

Cabletron Systems SEHI100TX-22 User manual

Cabletron Systems

Cabletron Systems SEHI100TX-22 User manual

Cabletron Systems SEH-22 User manual

Cabletron Systems

Cabletron Systems SEH-22 User manual

Cabletron Systems 9F426-03 User manual

Cabletron Systems

Cabletron Systems 9F426-03 User manual

Cabletron Systems 9F426-02 User manual

Cabletron Systems

Cabletron Systems 9F426-02 User manual

Cabletron Systems FN10 User manual

Cabletron Systems

Cabletron Systems FN10 User manual

Cabletron Systems 2E48-27R User manual

Cabletron Systems

Cabletron Systems 2E48-27R User manual

Cabletron Systems SmartSwitch 9000 User manual

Cabletron Systems

Cabletron Systems SmartSwitch 9000 User manual

Cabletron Systems MiniMMAC User manual

Cabletron Systems

Cabletron Systems MiniMMAC User manual

Popular Switch manuals by other brands

D-Link xStack DGS-3400 Series user manual

D-Link

D-Link xStack DGS-3400 Series user manual

LEGRAND Mosaic 0 770 30 Assemnly Instructions

LEGRAND

LEGRAND Mosaic 0 770 30 Assemnly Instructions

Real-El HQ-174 user manual

Real-El

Real-El HQ-174 user manual

TEUCER TSS-3G manual

TEUCER

TEUCER TSS-3G manual

CYP CMLUX-4H4CAT Operation manual

CYP

CYP CMLUX-4H4CAT Operation manual

Cisco Business 250 Series quick start guide

Cisco

Cisco Business 250 Series quick start guide

Viessmann 5208 manual

Viessmann

Viessmann 5208 manual

Dell PowerConnect 6224 release note

Dell

Dell PowerConnect 6224 release note

Kinivo K301 user manual

Kinivo

Kinivo K301 user manual

LEGRAND HPM Vivo EVM970L Series instruction sheet

LEGRAND

LEGRAND HPM Vivo EVM970L Series instruction sheet

Allen-Bradley 1489-AAHH3 manual

Allen-Bradley

Allen-Bradley 1489-AAHH3 manual

ZyXEL Communications MS-7206 manual

ZyXEL Communications

ZyXEL Communications MS-7206 manual

TIL AMS-6000 Installation and operating instructions

TIL

TIL AMS-6000 Installation and operating instructions

H3C H3C S3600 Series installation manual

H3C

H3C H3C S3600 Series installation manual

IFM Electronic efector 150 operating instructions

IFM Electronic

IFM Electronic efector 150 operating instructions

GUIYUAN INDUSTRY DEVELOPMENT 0030066 user manual

GUIYUAN INDUSTRY DEVELOPMENT

GUIYUAN INDUSTRY DEVELOPMENT 0030066 user manual

SIIG AV-GM09Q3-S1 manual

SIIG

SIIG AV-GM09Q3-S1 manual

BEA 10COMBOPLATE manual

BEA

BEA 10COMBOPLATE manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.