
1. Locate the Wall Assembly Top Cover
(SS-05) and secure to the Wall Assembly
(SS-01) with provided screws (Fig.2)
(Fig.2)
SS-05
SS-01
2. Floor Assembly
Screw (SS-03) Front Back Floor Supports
to (SS-04) Floor Joists using the provided
screws.
SS-04
SS-03
3. Once base is assembled as in (Fig.3),
Screw (SS-02)Shower Floor Boards to
each of (SS-04) Floor Joists spacing floor
boards evenly.
(Fig.3)
SS-02
Sierra Pillar Shower – CTC105
Parts Identification & Assembly Instructions