
2
WARNING !
Connecon of lighng xtures to the electrical installaon must be carried out by qualied personnel
eligible and authorized for such operaons.
Before the installaon, turn o the main power circuit
Aempts of disassembling or altering xtures’ internal components are not allowed
Fully operaonal electrical installaon is necessary for the installaon of lighng xtures
9. Join A and B proles together [pic. 7]
10. Place the buckle ring ( A prole) on the pin ( B prole) [pic. 8]
11. Tighten the clamp by pressing it down; both proles should be joined now and connected with each other [pic. 9]
12. Set the light line horizontally [pic. 10]
13. Check all the connecons and power connectors
14. Connect the light line to the electrical installaon by means of power connector of already installed SWE prole [pic. 11] [pic. 12].
WARNING ! - Prior to starng assembly you must turn of the main power. Leave the main power turned o aer the installaon of SWE
prole.
pic. 12
pic. 11
pic. 7 pic. 8 pic. 9
ABABAB
Pic. 10