5gaSteam pHC CONTROL +030220534 - rel. 1.2 - 15.05.2006
Content
1. GENERAL CHARACTERISTICS OF THE MAIN CONTROL BOARD - PHC 7
2. CONTROL SIGNALS FROM THE FIELD 8
2.1 Humidity or temperature control.......................................................................................................8
2.2 Pin strip position on the board for probe configuration..............................................................10
2.3 Using other brand probes ................................................................................................................10
3. AUXILIARY CONTACTS 11
3.1 Alarm contact..........................................................................................................................................11
3.2 Dehumidification contact ...................................................................................................................11
3.3 Remote terminal/supervisor systems ..............................................................................................11
3.4 Checks......................................................................................................................................................11
4. STARTING, CONTROL AND SHUTTING DOWN 12
4.1 Starting the appliance...........................................................................................................................12
4.2 Manually draining the boiler ..............................................................................................................14
4.3 The pGD0 graphic display (CAREL code: PGD0PH0F00) ...........................................................14
4.4 The main “menu”................................................................................................................................15
5. “MAIN “MENU” - AUXILIARY FUNCTIONS 18
“SERVICE” (“MAINTENANCE”) SUBMENU 18
5.1 “SERVICE” - information on the firmware......................................................................................18
5.2 “SERVICE” - display the operating hours........................................................................................18
5.3 Manually draining the cylinder ...............................................................................................18
5.4 Procedure for testing the electrical parts........................................................................................19
6. READING AND SETTING THE PARAMETERS 20
6.1 Reading and setting the set point.....................................................................................................20
6.2 Reading and setting the control parameters - reading the measurements............................20
6.3 “Rotation” of the steam request between the two burners (UG180 only).............................23
7. CONFIGURATION PARAMETERS 24
7.1 Reading and setting the configuration parameters - “USER” submenu...................................24
7.2 Configuring the control mode ............................................................................................................24
7.3 Humidity control with humidistat .....................................................................................................24
7.4 Unit of measure ....................................................................................................................................24
7.5 Configuring the ambient humidity (or temperature) probe ......................................................24
7.6 Configuring the limit humidity probe ..............................................................................................25
7.7 Initial auto-test........................................................................................................................................25
7.8 Setting the pre-purge speed and calibrating the fan speed........................................................25
7.9 Water supply with REVERSE OSMOSIS system.............................................................................26
7.10 Setting the maximum ratio between the water filled and the water drained for dilution..26
7.11 Preheating.............................................................................................................................................26
7.12 Antifreeze..............................................................................................................................................27
7.13 Reversing the logic of the alarm relay.............................................................................................27
7.14 Options - drain due to inactivity......................................................................................................28
7.15 Setting the production ramp .............................................................................................................28
7.16 Setting the fan speed for minimum and rated production.......................................................28
7.17 Setting the minimum production....................................................................................................29
7.18 Options .................................................................................................................................................29
8. ALARMS, TROUBLESHOOTING 30
8.1 Alarms ....................................................................................................................................................30
8.2 Alarm management and signals.......................................................................................................30
9. OPERATING PRINCIPLE, CONTROL AND OTHER FUNCTIONS 32
9.1 Operating principle..............................................................................................................................32
9.2 Control principles.................................................................................................................................32