
Page
INTRODUCTION, Section 1
Introduction, 1.1 1
Special Definitions, 1.2 1
INSTALLATION, Section 2
Truck System Requirements, 2.1 2
Recommended Hydraulic Supply Options, 2.2 3
Clamp Installation Procedure, 2.3 4
PERIOD MAINTENANCE, Section 3
100-Hour Maintenance, 3.1 9
500-Hour Maintenance, 3.2 9
1000-Hour Maintenance, 3.3 9
TROUBLESHOOTING, Section 4
General Procedures, 4.1 10
Truck System Requirements, 4.1-1 10
Tools Required (metric), 4.1-2 10
Troubleshooting Chart, 4.1-3 11
Troubleshooting Carton Clamp Loads, 4.1-4 12
Plumbing, 4.2 14
Non-Sideshifting – Hosing Diagram, 4.2-1 14
Non-Sideshifting – Hydraulic Circuit, 4.2-2 15
Sideshifting – Hosing Diagram/Clamp, 4.2-3 16
Sideshifting – Hosing Diagram/Sideshift, 4.2-4 17
Sideshifting – Hydraulic Circuit, 4.2-5 18
Sideshifting/Regen. – Hydraulic Circuit, 4.2-6 19
Clamp Function, 4.3 20
Supply Circuit Test, 4.3-1 20
Clamp Circuit Test, 4.3-2 20
Sideshift Function, 4.4 21
Supply Circuit Test, 4.4-1 21
Sideshift Circuit Test, 4.4-2 22
Electrical Circuit, 4.5 23
ONTENTS
C
i
SERVICE, Section 5
Clamp Removal, 5.1 25
Arms, 5.2 26
Arm Assemblies – Removal and Installation, 5.2-1 26
Drum Arm Pad Surface Replacement, 5.2-2 27
Carton & Rigid Arm Pad Replacement, 5.2-3 28
Carton Clamp Pad, Stabilizer Repair, 5.2-4 29
Carton Clamp Camber Adjustment, 5.2-5 30
Clamps without Arms, 5.2-6 31
Arm Bearings – Removal and Installation, 5.2-7 32
Valve/Manifold, 5.3 33
Valve Removal and Installation, 5.3-1 33
Manifold Removal and Installation, 5.3-2 33
Valve Service, 5.3-3 34
Relief Valve Cartridge Adjustment, 5.3-4 36
Cylinders, 5.4 37
Cylinder Service, 5.4-1 37
Cylinder Disassembly, 5.4-2 37
Cylinder Inspection, 5.4-3 38
Cylinder Reassembly, 5.4-4 39
Cylinder Replacement, 5.4-5 41
Base Unit, 5.5 42
Baseplate Replacement, 5.5-1 42
Solenoid Valve, 5.6 43
Coil Service, 5.6-1 43
Valve Service, 6.6-2 43
SPECIFICATIONS, Section 6
Specifications, 6.1 44
Hydraulics, 6.1-1 44
Auxiliary Valve Functions, 6.1-2 44
Truck Carriage, 6.1-3 44
Torque Values, 6.1-4 45
Page