ccei Oxeo VP User manual

Technical Manual
Oxeo VP &
Oxeo LT VP
Automatic and Connec-
ted Chlorine Regulator
PF10J055 - PF10J056
Table des matières
1. Important Safety Instructions ....................................................................................................... 2
2. Package Content .......................................................................................................................... 2
3. Description .................................................................................................................................. 3
4. Technical Specifications .............................................................................................................. 3
5. Installation ................................................................................................................................... 4
5.1. Wall Mounting ................................................................................................................. 4
5.2. Hydraulic Connection ....................................................................................................... 4
5.3. Accessories Positioning (Zelia POD, for 1.5" Piping) ....................................................... 5
5.4. Accessories Positioning (for 2" Piping) ............................................................................ 7
5.5. RedOx Sensor, Flow Switch and Tube Connection ........................................................... 8
5.6. Electrical Wiring .............................................................................................................. 8
6. Smartphone Application .............................................................................................................. 9
6.1. App Download ................................................................................................................. 9
6.2. Connect your Device to Vigipool ..................................................................................... 9
7. Setting the Oxeo ........................................................................................................................ 10
7.1. Control Interface ............................................................................................................. 10
7.2. Getting Started with the Oxeo ........................................................................................ 10
7.3. Additional Parameters to be set via the Smartphone App ................................................ 12
8. Operating the Oxeo ................................................................................................................... 12
8.1. Information Delay and Non-Active Injection .................................................................. 12
8.2. Setpoint Selection ........................................................................................................... 13
8.3. Measured Value Display ................................................................................................. 13
8.4. Product Factory Reset ..................................................................................................... 13
9. Sensor Maintenance ................................................................................................................... 14
A. Technical Support / Declaration of Conformity .................................................................... 15
CONT0047 v1.0EN (10/31/2022)

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
1. Important Safety Instructions
When installing and operating this electrical equipment, basic safety precautions
should be followed, including the following:
• READ AND FOLLOW ALL INSTRUCTIONS IN THIS MANUAL
• WARNING - To reduce the risk of injury, do not permit children to use this
product unless they are closely supervised at all times.
• WARNING - Risk of Electric Shock. Connect only to a branch circuit protected
by a ground-fault circuit interrupter (GFCI). Contact a qualified electrician if
you cannot verify that the receptacle is protected by a GFCI.
• WARNING - To reduce the risk of electric shock, replace damaged cord imme-
diately.
• SAVE THESE INSTRUCTIONS.
IMPROPER INSTALLATION OR USE OF THIS PRODUCT CAN CAUSE
SERIOUS INJURY OR DEATH.
INSTALLERS, MAINTENANCE PERSONNEL AND THE POOL OWNER
MUST READ AND UNDERSTAND THE WARNINGS AND INSTRUCTIONS
IN THIS MANUAL BEFORE USING THIS PRODUCT.
This manual contains instructions for installing and using the Oxeo VP & Oxeo
LT VP. Contact CCEI for any questions about the equipment.
To the installer: This manual contains important safety information on the instal-
lation and use of this product. This manual should be given to the user after ins-
tallation.
To theuser : This manual contains important information that will help you use
this product properly. Please keep it as a reference.
Always read the Material Safety Data Sheets (MSDS) and instructions related to
the storage and use of chemicals used with this controller.
2. Package Content
• 1 x Oxeo VP (P/N: PF10J055) or Oxeo LT VP (P/N: PF10J056)
• 1 x RedOx sensor with 80" of cable (2 m)
• 1 x 650 mV calibration solution
• 1 x Flow switch with 115" of cable (2.9 m) (PF10J055 only)
• 1 x 144" (3.6 m) of injection tube (7/32" OD) + connection accessories
• 1 x MM 3/4" - 3/4" adapter for flow switch (PF10J055 only)
• 2 x screws, 2 x dowels and 1 x bracket for wall mounting of the product
• 1 x Technical manual (this manual)
ccei.ca 2

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
3. Description
Features
• Automatic regulation of RedOx according to a setpoint
• Dosing pump with a visual status indicator (RGB LED)
• Intuitive interface with 1 selection button and 5 LEDs indicating the pool's RedOx level
• Control with a smartphone app (Vigipool NA)
• Wi-Fi and Bluetooth connection
• Easy installation thanks to the Zelia measuring and injection chamber
• Compatible with the Vigipool-connected universe
Oxeo VP & Oxeo LT VP measure the RedOx potential and introduce an oxidizing product into the pool
water as long as the RedOx potential is below the set threshold.
All disinfectants used in swimming pools have the function of oxidizing microorganisms. This oxida-
tion, which consists in capturing electrons on organic molecules, prevents the proliferation of bacteria.
This chemical reaction is called oxidation-reduction and we can evaluate the capacity of the water to
disinfect by measuring its oxidation-reduction potential (RedOx potential or ORP).
The pool water must not only be clean and healthy, but it must also be able to destroy bacteria and
microorganisms that are brought in from outside. Therefore, it is not enough to disinfect it, but it must
still be made disinfectant. It is therefore essential to use "persistent" products.
The level of RedOx is an extremely important parameter for the treatment of your
pool water and can have toxic effects on health and the environment.
Chemicals must be handled and stored with care and in a suitable environment.
4. Technical Specifications
Size (H x L x W) 5" x 4" x 2,5" (260 x 180 x 80 mm)
Weight 700 gr (Oxeo VP or Oxeo LT VP only)
Installation Inside and outside
Voltage of operation 120 VAC @ 0.2 A, 50 / 60 Hz
Rated power 22 W (max)
Ingress protection rating IP 54
RedOx measurement
Measuring range
Calibration
Measurement by combined electrode +/- 5 mV
100 to 900 mV
650 mV (provided solution) or between 550 to 750
mV through the app
Dosing pump
Maximum water flow
Peristaltic
Up to 1.5 L/h
Sizeofthemeasuringandinjectionchamber(Zelia
Pod) 3.35" long, installed on 1.5" piping (via union fit-
tings)
Bluetooth Low Energy (v4.x)
Conform R&TTE Directive 1999/5/EC
Wi-Fi 802.11 b/g/n and "dual band" (2.4 GHz only)
ccei.ca 3

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
5. Installation
Always mount the controller in a safe and non-floodable area. Never bury the po-
wer cable.
The controller must not be installed directly outside, it must be protected from
rain, cleaning or watering jets and UVs (sunlight).
The controller is splash-resistant, but should not be placed in a floodable area.
The controller must be placed on a flat and stable surface and fixed to the wall
using the supplied plugs and screws.
For safety reasons and by the NF C15-100 standard, the product must be installed:
- at more than 3.5m from the edge of the pool. This distance is evaluated taking into
account obstacles. If the Oxeo is installed behind a wall, it is the distance needed
to go around it and reach the box that is taken into account.
- or in an underground room in the immediate vicinity of the pool. In this case, the
room must be accessible through a trap door requiring a tool for its opening.
Prior to installation, verify that the Wi-Fi network is available where the product
will be installed.
5.1. Wall Mounting
Using the two screws and two dowels provided, attach the bracket to the wall. The tab should be facing
up.
Once the bracket is attached, slide the Oxeo from top to bottom until you hear a "click".
5.2. Hydraulic Connection
1.5" piping: It is preferable to install the Zelia Pod measuring chamber in bypass to control the flow
through the measuring chamber and to be able to remove it without interrupting the filter unit. (A bypass
installation is essential when the flow rate is greater than 15 m3/h).
2" piping: Use the 3 support clamps to install the RedOx sensor, the flow sensor and the injector in
line on the 2" pipe.
The equipment should be placed after the filtration, heating, and chlorinator and be positioned on a
horizontal pipe always loaded with water. The RedOx probe must always be immersed in the water.
ccei.ca 4

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
When installing and using the Zelia Pod, make sure that it is loaded relative to the
water level of the pool, so that it is constantly filled with water and free of air. If
air is present in the measurement chamber, the sensor readings may be distorted.
The injection of liquid sanitizer (e.g. liquid chlorine) must always be installed after
the filter unit, the heater and the electrolysis cell! Otherwise, these components
could be irreversibly damaged.
5.3. Accessories Positioning (Zelia POD, for 1.5" Piping)
Beforeinstalling theZelia POD,disconnect thepower supplyof thefiltration group
and drain all the water from the circuit.
1. Installing the Zelia POD
On the 1.5" pipe, cut a 7,8" section (200 mm). Glue the 2 provided union fittings using the appropriate
glue.
Position the different elements by referring to the photo below. To screw in the injectors (E or F), use
the flat gasket supplied to ensure the tightness of the assembly. It is recommended to use Teflon tape
in all the threads.
The water flow is illustrated by the blue arrow in the picture below:
• A:PoolGrounding (Allows you to putthewaterto the ground to improvethedurabilityofthe metallic
parts in your pool)
• B: Housing for sensor (not used)
• C: Housing for sensor (via provided cable gland)
ccei.ca 5

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
• D: Flow sensor (when installing, make sure that the arrow on the flow sensor points in the same
direction as the flow direction)
• E: Housing for injection (not used)
• F: Housing for sanitizer injection
2. RedOx sensor installation:
Open the RedOx probe box and remove the storage solution. Carefully place the probe in the slot (B
or C). When the probe touches the bottom of the slot, pull it out 3-4 mm so that water can flow around
it. Tighten the gland nut.
3. Injector installation:
Remove the upper part of the injector and mount the threaded part in the slot (E or F) of the Zelia Pod
Place the cap and top ring around the flexible tube.
Push the tube into the injector.
Screw the two pieces on the tube of the lower part of the injector.
4. Flow switch installation:
Screw the flow sensor onto the location (D) and validate that the arrow is in the direction of the flow.
ccei.ca 6

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
5.4. Accessories Positioning (for 2" Piping)
Using the supplied support clamps, mount the RedOx probe, injector and flow sensor.
Donotmountthedisinfectantinjectionbeforetheprobe!(Thesensormeasurement
would be distorted)
Before installation, water must be drained from the piping. For each location, drill a hole in the top of
the pipe between 11/16" and 7/8" (18 - 22 mm) in diameter.
1Support clamp with 1/2" thread: mount the supplied gland using Teflon tape. Insert the RedOx
probe carefully, until it reaches the bottom of the pipe. Remove the probe by 3-4 mm.
2
Support clamp with 1/2" thread: mount the injector using Teflon tape. Use the tube provided
and connect it to the Oxeo (right side).
Refer to the image below for more details on the assembly.
3
Support Clamp with 3/4" thread: Put Teflon on both sides of the 3/4" male-to-male adapter.
Screw the adapter into the support clamp, then screw the flow sensor onto it. Caution, an arrow
indicating the direction of flow is present on the flow sensor, the arrow must be pointed in the
direction of flow.
Tubing installation on the disinfectant injector (#2):
• Put the threaded cap and the pressure washer around the tube
• Insert the nozzle into the tube as far as it can go
• Insert the injection washer and screw on the nut
ccei.ca 7

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
5.5. RedOx Sensor, Flow Switch and Tube Connection
A: Power supply cable (120 VAC)
B: BNC socket for the RedOx sensor installation
C: Flow switch connector
D: Dosing pump
For (D): the adapter on the left is for the aspiration of the disinfectant, and the one
on the right is for the injection of the product into the pool water
5.6. Electrical Wiring
Risk of electric shock. Connect the controller only to a grounded outlet protected
by a ground fault circuit interrupter (GFCI). We recommend installation to a de-
dicated GFCI. Installation should be performed by a licensed electrician.
Disconnect power before servicing. There are no user-serviceable parts inside the
controller.
All power cords should be inspected frequently. Any damaged power cords should
be replaced immediately to reduce the risk of electric shock. Never operate a
controller without a working flow switch.
Installation requires a properly located GFCI-protected outlet. Never use an ex-
tension cord for electrical connections to the controller.
The unit is equipped with a flow sensor and should not be installed on a power
supply that is connected to the filtration system. This may cause the unit to mal-
function.
The box is delivered with a power cable that can be connected to the mains on a standard plug (120V,
50 / 60 Hz) in the technical room. This socket must be protected by a 30mA differential device (GFCI)
by the NFC15-100 standard.
ccei.ca 8

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
6. Smartphone Application
6.1. App Download
Search for Vigipool NA in the search engine of the App Store or Play Store and install the app on your
device. You can also use the following QR code:
For Android® devices: For Apple® devices:
The Oxeo VP and Oxeo LT VP include a Bluetooth® and Wi-Fi transmitter, which allows your device
to be controlled by a smartphone or tablet. To control the Oxeo, an iOS (Apple®) or Android® device
with a Bluetooth® Low Energy (v4.x) OR WiFi 502.11 B:N:G connection is required. Other operating
systems (Windows Phone®,...) or devices equipped with a previous version of Bluetooth® - lower than
4.0 - are not compatible.
In Bluetooth, only one mobile/tablet can be connected at any time. To connect to a new device, the
previous one must be disconnected.
In Wi-Fi, a Vigipool account must be created in the application, and the ID and SSID of your Wi-Fi
network must be entered.
Bluetooth and geolocation of your phone must be enabled when connecting for the
first time and when using the product in Wi-Fi
If the device is connected via Wi-Fi (recommended), multiple devices can be
connected to the product at the same time and can be controlled from anywhere.
6.2. Connect your Device to Vigipool
With Vigipool, all Vigipool-compatible products can be controlled with a single application.
To connect this product to the Vigipool app:
• Oxeo VP (PF10J055) only: If no other Vigipool product is connected and the Oxeo is the only one
when the product is first powered on, wait for the LED to flash WHITE. Press the "Ox" button on
the product to make the Oxeo the "Master" of the environment. When other Vigipool-compatible
products are added to the environment, they will automatically pair up with the "Master" product,
provided that the "Master" product has been restarted at least 1 minute before the operation.
• Oxeo LT VP (PF10J056) only: The Oxeo LT VP must pair with a "Master" Phileo VP or in an
environment where a Phileo VP is also present to be functional.
• If another Vigipool product is already connected, turn off all Vigipool products and start them at the
same time. The new products will be paired directly with the current "Master".
If you have a CCEI Tild, this product will always be defined as "Master".
ccei.ca 9

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
7. Setting the Oxeo
The Oxeo VP and Oxeo LT VP can be set up via the interface of the box or via the smartphone app
available on iOS® and Android®. We encourage you to use the app, which gives access to additional
settings, especially for sensor calibration.
7.1. Control Interface
The interface is equipped with a button (A), 5 indication LEDs (B) and an RGB LED (C) installed
behind the dosing pump.
7.2. Getting Started with the Oxeo
7.2.1. Powering Up
The system is activated by the switch on the side of the automatic controller.
At startup, the front panel lights will flash for several seconds while the unit is being turned on.
[Initialization phase: chase on the green light indicators (B) then different colours of the multi-color
LED (C)]
7.2.2. Vigipool "Master" Device Selection
At the end of the initialization phase, the multi-color LED (C) flashes white. This corresponds to the
choice of the device that will perform the Vigipool "Master" function:
• If the system has only this device, press the selection button (A). The device is now configured as a
Vigipool "Master" and you can add other devices to the system later.
• If the installation is equipped with several Vigipool Universe-compatible devices:
– And that a device is already configured as Vigipool "Master", restart the Vigipool "Master" device
if it has been powered for more than one minute. Your Oxeo VP or Oxeo LT VP will connect to
the Vigipool "Master": it will stop flashing in white and go to normal operation mode.
– And that no other device is already configured as Vigipool "Master", turn on all the devices and
press the button of the device you want to use as Vigipool "Master". The other products will then
connect to the device you have validated as Vigipool "Master", stop flashing in white and go to
normal operation mode.
If you want to change the choice of the Vigipool "Master", it is necessary to reset
the system (see the section "Product Factory Reset")
ccei.ca 10

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
7.2.3. Pump Priming
To start the control circuit by rotating the peristaltic pump, it is necessary to hold down the selection
button (A) for a long time (more than 10 seconds). After 10 seconds, the multi-color LED (C) will flash
Turquoise and the pump will rotate regardless of the status of the flow sensor, for a maximum of 30
seconds, as long as the selector button is held down. Once the button is released, the pump will return
to its normal state. It is necessary to repeat the operation if a longer priming time is required.
7.2.4. RedOx Sensor Calibration
Filtration must be turned off to calibrate the sensor.
1. Immerse the probe in the 650 mV calibration solution
2. Press and hold the selection button (A) for 3 seconds
3. The RGB LED (C) lights up blue. Release the selection button (A)
4. The first green indicator (B) - 500 mV and the multi-color LED (C) light up
The 5 LEDs (B) will progressively light up to indicate the progress of the calibra-
tion.
The colour of the RGB LED (C) lights up depending on the difference compared
to the expected measurement:
• Green: very small deviation between the measured and expected values (devia-
tion less than 50 mV).
• Yellow / Orange: small deviation between the measured and expected values
(deviation between 50 and 150 mV).
• Red: big deviation between the measured and expected values (deviation greater
than 150 mV)
1. Once the 5 LEDs (B) are lit and fixed, and the RGB LED (B) is lit in green or yellow, the measu-
rement is stabilized.
2. Press the selection button to confirm the calibration.
3. The RGB LED flashes rapidly in green to indicate the validation of the calibration.
4. The first green indicator (B) - 500 mV and the multi-color LED (C) light up
If the RGB LED flashes red, the calibration is not taken into account: the value has
adeviationgreaterthan150mVorthemeasurementhasnotstabilized.Inthiscase,
the device returns to its normal state and a diagnosis can be made on the sensor.
7.2.5. RedOx Sensor Calibration via the App
The smartphone app offers more advanced features to calibrate the probe to ensure a more reliable and
accurate measurement.
•Calibration with one measuring point: Instead of calibrating at 650 mV, you can calibrate with
another value between 550 and 750 mV.
ccei.ca 11

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
•Manual adjustment: The manual adjustment allows you to make a correction on your measurement.
For example, in case of a slight deviation (up to +/- 200 mV), you can increase or decrease the
measurement of your device as close as possible to the real value, by increments of 20 mV.
7.3. Additional Parameters to be set via the Smartphone App
7.3.1. Wintering Mode
The application allows you to activate the wintering mode. As long as the wintering mode is activated:
• The injection is stopped.
• Notifications and alerts are disabled.
• The RGB LED (C) is lit in cyan, continuously
7.3.2. Maximum Daily Injection Volume Setting
The maximum daily volume of RedOx corrector to be injected can be limited by setting a non-zero
value. The default volume is 1.0 L (even when not set in the application).
• Daily volume adjustable from 0.1 to 2.0 L
• Increment of 0.1 L at a time
This function and setting are very important because it protects your pool from too much product in-
jection in case the sensor gives an incorrect value.
In case this parameter is set to "Off", no limitation of the injected volume will take
place.
In case of a power failure, the volume injected during the last 24 hours is reset to 0.
7.3.3. Adjustment of Product Volume in the Container
This function allows you to indicate the total volume of the correction product container. This value is
counted down to warn you when the tank is empty and avoid unnecessary pumping. By default, this
parameter is not activated. The value must be adjusted each time the container is replaced.
• Volume adjustable from 0 to 50 L
• Increment of 1 L at a time
8. Operating the Oxeo
Oxeo VP and Oxeo LT VP do not perform measurements:
• during the first 2 minutes after powering up (to wait for the stabilization of the
measurement),
• whenthe flow rateis notdetectedby thedevice(to takemeasurementsonly when
the filtration is on and thus be sure to measure the water in the pool and not the
water stagnating in the pipe).
8.1. Information Delay and Non-Active Injection
A hysteresis of ±50 mV is provided to avoid oscillation around the set value.
Several causes can lead to a non-active injection despite a measurement different from the set point:
• When the device is started, no injection occurs in the first 2 minutes because the device does not yet
measure the ORP value.
ccei.ca 12

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
• When the flow meter detects a flow rate, a 2-minute delay is built in before injection. The injection
is instantly stopped when the flow rate returns to OFF.
• No injection if ORP measurement is lower than 100 mV or greater than 900 mV (ORP measurement
fault).
• No injection if tank volume = 0 (empty liquid disinfectant tank).
• No injection if the Max 24h injection volume is reached.
• No injection in wintering mode.
8.2. Setpoint Selection
1. Short press the selection button (A).
2. One of the 5 green indicators (B) flashes for 5 seconds indicating the current setpoint.
3. While the LED is flashing, each press of the selection button (A) shifts the setpoint to the right until
it reaches 700 mV and then back to 500 mV. Press until the desired setpoint is reached.
4. Wait 5 seconds to validate the change of setpoint. The unit returns to its normal mode with the
new setpoint.
5. By default, the setpoint is set to 600 mV.
8.3. Measured Value Display
The 5 indicator LEDs on the front panel display the measured ORP value (here 600mV). If the ORP
is between two graduations, the LED of the previous graduation remains fixed (here 600mV), and the
LED below or above, depending on the reading direction of the ORP, flashes slowly.
Example in the following pictures: the measured ORP increases from 600 to 630 mV.
LED 600 will flash and when the ORP value increases to 650 mV, only the green LED 650 will be
permanently lit.
The RGB LED on the pump indicates the deviation between the measured value and the setpoint:
Couleur de la LED Description
Green The difference between the measured value and
the setpoint is less than or equal to 50 mV.
Yellow - Orange (gradual*) The difference between the measured value and
the setpoint is between 50 and 150 mV.
Red The difference between the measured value and
the setpoint is greater than or equal to 150 mV.
To indicate that the injection is in progress, the multi-color LED (C) will flash during this period, while
maintaining the colour associated with the measurement (e.g. flashing yellow).
*Thecolour of the pumplightchangesfromgreen to red dependingonthedeviationof the measurement
from the setpoint, gradually passing through yellow, orange, …
8.4. Product Factory Reset
If you install a new Vigipool-compatible product and wish to change the "Master" device, or for any
other reason, a factory reset is available as follows:
• Turn off the unit (switch on the side of the cabinet) and wait approximately 10 seconds;
ccei.ca 13

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
• Press and hold the selection button (A);
• Turn on the device while holding down the button;
• Wait for the green indicator lights (B) to flash;
• Release the button. All the parameters are reset to the factory settings.
Performing a product reset will erase all the parameters in memory (calibration,
setpoint, WiFi configuration, tank volume, pairing of telephones and other devices
in the Vigipool Universe, etc.). Therefore, it is necessary to redo the commissioning
procedure after resetting the product.
9. Sensor Maintenance
When a probe is immersed in water, a film forms around the glass bulb at the end of the probe, the
thickness of which increases with time. This invisible film induces a longer response time, a degradation
of the gradient and a drift of the 0 point. The drift of the 0 point can be easily compensated by a regular
calibration. The increase in temperature is also an important factor in aging.
Probe storage:
Remove the probe from the pipe and store it in its original bottle.
Fill the original vial with a 3 mol/L KCl solution or with a PH7 solution or tap water.
Place the probe head in the bottle.
Store at room temperature.
A poorly wintered probe may have a slower response and thus make calibration
more difficult.
Probe regeneration:
At the end of wintering, it is recommended to immerse the probe for 12 hours in a 50% PH4, 50% KCl
solution at 3 mol/L.
Calibration:
Each probe is characterized by its drift and gradient. Since these characteristics tend to drift with use,
regular calibration is necessary. Calibration is mandatory in the following cases:
• During installation.
• After a probe replacement.
• After each cleaning with a cleaning solution.
• After a long storage period.
• When the measurement results differ too much from the expected values.
Note that the average probe lifetime varies between 6 and 18 months depending on
usage. A TAC greater than 100 mg/L reduces the life of the probe.
The probes are fragile consumables that must be inspected by a professional.
ccei.ca 14

Technical Manual Oxeo VP & Oxeo LT VP v1.0EN
A. Technical Support / Declaration of Conformity
USA: na.ccei-pool.com/us / Tel: +1 424 800 2191
Canada: na.ccei-pool.com/ca / Tel: +1 514 963 4226
CCEI Inc. (Quebec 1170122155) declares that the Oxeo VP & Oxeo LT VP is compliant with
the safety and electromagnetic compatibility requirements of European directives 2006/95/CE
and 2004/108/CE. The product Oxeo VP & Oxeo LT VP is UL certified in the file E524688
Pierre-Yves Flattot
Montreal, on 10/31/2022
Distributor's stamp
Date of sale: . . . . . . . . . . . . . . . . . . . . . . . Lot N°: . . . . . . . . . . . . . . . . . . . . . . . . . . .
ccei.ca 15
This manual suits for next models
1
Table of contents
Other ccei Controllers manuals
Popular Controllers manuals by other brands

Cressi-sub
Cressi-sub MC5 Repair and maintenance instructions

Xpelair
Xpelair FR22-30 and Installation and operating instructions

Anaheim Automation
Anaheim Automation DPC50501 user guide

Linear Technology
Linear Technology LTM4650EY-1 Demo Manual

Savant
Savant Touch 5.5 Deployment guide

Messana
Messana mZone 8 Submittal information

Allen-Bradley
Allen-Bradley 1756 ControlLogix instruction manual

Fisher
Fisher 6492HTM instruction manual

S+S Regeltechnik
S+S Regeltechnik HYGRASREG KH-10 Operating Instructions, Mounting & Installation

hpmont
hpmont HD5L-PLUS Series user manual

Sharp
Sharp PN-E421 user guide

Smart-Ashley
Smart-Ashley YDL100SF user manual