ELECTRICAL CONNECTIONS
The chillers leave the factory completely cabled and ready
for connection to the mains electricity supply and for the
flow switch, remote ON/OFF switch and pump to be con-
nected to the terminals provided. Electrical connections
must be carried out by qualified personnel in respect of
current legislation.
For all electrical work, refer to the electrical wiring dia-
grams in this manual.
You are also recommended to check that:
-The characteristics of the mains electricity supply are
adequate for the power ratings indicated in the electrical
characteristics table below, also bearing in mind the pos-
sible use of other equipment at the same time.
Power to the unit must be turned on only after
installation work (hydraulic and electrical) has been
completed.
All electrical connections must be carried out
by qualified personnel in accordance with current
legislation in the country concerned.
Respect instructions for connecting phase, neu-
tral and earth conductors.
The power line should be fitted upstream with a
suitable device to protect against short-circuits and
leakage to earth, isolating the installation from oth-
er equipment.
Voltage must be within a tolerance of ±10%
of the rated power supply voltage for the unit (for
three phase units, the unbalance between the phas-
es must not exceed 3%).
If these parameters are not respected, contact the
electricity supply company.
For electrical connections, use double insulation
cable in conformity with current legislation in the
country concerned.
Install, if possible near the unit, an appropriate
protection device to isolate the unit from the mains
supply with delayed characteristic curve, contacts
opening by at least 3 mm and an adequate interrup-
tion and differential protection capacity.
If this device is not visible from the electrical
panel of the unit, it should be lockable
An efficient earth connection is obligatory.
Failure to earth the appliance absolves the manufac-
turer of all liability for damage.
In the case of three phase units, ensure the
phases are connected correctly.
Do not use water pipes to earth the unit.
supply (V-Ph-Hz) F.L.I. F.L.A. L.R.A. F.L.I. F.L.A. F.L.I. F.L.A. F.L.I. F.L.A. FU1 FU2 FU3 FU4 FU4*
(kW) (A) (A) (kW) (A) (kW) (A) (kW) (A)
Rated values (1) FUSES
Model Electrical power Compressors Fans Total Max. values (2) Glass 5x20mm 250V
0011 230~50 1,65 7,67 47,0 0,16 0,73 1,81 8,4 2,52 12,13 1A 1A 1A 1A 6,3A
0021 230~50 2,11 9,81 61,0 0,16 0,73 2,27 10,54 3,22 15,53 1A 1A 1A 1A 6,3A
0025 230~50 2,5 11,62 76,0 0,16 0,73 2,66 12,35 3,74 18,03 1A 1A 1A 1,6A 6,3A
0031 230~50 2,94 13,66 100,0 0,32 1,46 3,26 15,12 5,1 24,56 1A 1A 2A 1,6A 6,3A
0021 400-3N~50 2,07 3,77 40,0 0,16 0,73 2,23 4,5 2,98 5,83 1A 1A 1A 1A 6,3A
0025 400-3N~50 2,45 4,56 40,0 0,16 0,73 2,61 5,29 3,59 6,93 1A 1A 1A 1A 6,3A
0031 400-3N~50 2,86 5,22 46,0 0,32 1,46 3,18 6,68 4,2 8,46 1A 1A 2A 1,6A 6,3A
0041 400-3N~50 3,43 6,23 50,0 0,32 1,46 3,75 7,69 5,86 11,46 1A 1A 2A 1,6A 6,3A
0051 400-3N~50 4,21 7,98 66,0 0,32 1,46 4,53 9,44 7,18 13,86 1A 1A 2A 1,6A 6,3A
0061 400-3N~50 4,88 8,65 74,0 0,32 1,46 5,2 10,11 7,79 14,96 1A 1A 2A 1,6A 6,3A
0071 400-3N~50 6,31 12,04 101,0 0,67 3,3 6,98 15,34 9,03 18,4 1A 1A 10A 3,15A 6,3A
0091 400-3N~50 7,77 14,13 123,0 0,67 3,3 8,44 17,43 10,63 21,3 1A 1A 10A 3,15A 6,3A
0101 400-3N~50 8,93 16,23 127,0 1,34 6,6 10,27 22,83 12,8 27,3 1A 1A 10A 3,15A 6,3A
0121 400-3N~50 10,93 18,92 167,0 1,34 6,6 12,27 25,52 15,51 32,2 1A 1A 10A 3,15A 6,3A
0151 400-3N~50 13,4 20,0 198,0 1,34 6,6 14,7 26,6 18,10 36,6 1A 1A 10A 3,15A 6,3A
F.L.I. Power input
F.L.A. Current input
L.R.A. Compressor start-up current
(1) External air temperature 35°C - Water temperature at evaporator 12/7°C.
(2) Values refer to the lower rated voltage (50 Hz).
These values should be used to size the protection switches and power cables.
FU1* Fuse to replace FU1 if a storage tank pump + pump on unit are connected (supplied inside the electrical panel).
HRAT E ELECTRICAL DATA
AI