
6
ML2000 Series Mortise Lock
Installation Instructions
Used with VN Escutcheon Trim and V Series Indicators
FM521 11/21
Copyright © 2019, 2020, 2021, ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in
whole or in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
5 Installation
a Prepare Door
Prepare door for function holes, size, and location according to
FM500 door marker template, if not already prepped.
b Install Strike and Lock
1. Install strike using two (2) 3/4"combination mounting
screws. If strike box is needed, insert between strike and
door frame. (Figure11)
2. Make sure handing of lock matches
handing of door.
3. Insert mortise lock into door, and temporarily hand tighten
two (2) 1" combination screws. (Figure12)
Notes:
• Keep door open until installation is complete.
• Make sure lock is unlocked. If lock has a toggle, push bottom of
toggle inward to ensure it is unlocked during installation.
c Install Outside Trim (for standard levers or knobs only)
For Muséo®Levers, skip to step 5f Attach Levers to
Escutcheons (for Muséo® levers or knobs only) on page 7.
1. Verify the indicator is in the vacant/unlocked position.
2. Align trim posts with vertical holes in door. (Figure13)
3. Slide outside escutcheon assembly through
lock body from outside door face.
Note:
If indicator is used on the outside, align hub indicator
spindle with diamond hole in control hub of lock. (Figure14)
d Install Inside Trim (for standard levers or knobs only)
1. Verify the indicator is in the vacant/unlocked position.
2. Align escutcheon and install inside escutcheon assembly onto
inside of door face. (Figure15)
Note:
If indicator is used on the inside, align hub indicator spindle with
diamond hole in control hub of lock. (Figure14)
3. Through-bolt inside escutcheon to outside escutcheon with two
(2) #8-32 x 2-1/4" screws.
Note:
Screw heads should be visible on inside escutcheon.
Figure11
Narrower Hole
Wider Hole
Strike Orientation Strike
3/4"
Screws
Lock
Figure12
1 "
Screws
Outside Escutcheon Assembly
Figure13 Figure14
Control
Hub
Spindle
SpindleCam
#8-32 x 2-1/4"
Screws
Escutcheon
Assembly
Figure15