
National Sales Oce:
38 Redfern Street
Wetherill Park NSW 2164
Australia
1300 132 389
www.doric.com.au
INSTALLATION GUIDE 6
DS2800 I LIFT TO LOCK
MORTICE LOCKBODY
STEP 6: END GUIDE INSTALLATION
Insert the Top and Bottom
End Guides and secure to the
extrusion using the supplied
½” x 8G CS screws.
Ensure the D-Bolts can be
thrown and retracted freely
before tightening the
mounting screws all the way.
STEP 7: FUNCTION CHECK
1. Lift the Furniture Handle and ensure that
the D-Bolts and Bolt are being thrown.
To adjust the Height of the D-Bolts, remove
the Furniture, Lock Body and Bolt Assemblies.
Rotate the D-Bolt Tip Clockwise to decrease
the protrusion, and Counter Clockwise to
increase the protrusion.
2. Lower the handle and ensure that the
D-Bolts, Bolt and Tongue are being retracted.
3. Operate the Snib and ensure the handle
becomes inoperable in the locked position.
4. Operate the Key and ensure the handle
becomes inoperable in the locked position.
1. ENGAGING
LOCKING BOLTS
2. RETRACTING
LOCKING BOLTS
3. SNIB LOCK 4. KEY DEADLOCK
SNIB LOCKED
SNIB UNLOCKED