Dura-Max Greenhouse User manual

• Tall Walk in Shed
• Quick & Easy Assembly
• Ridge Reinforced Walls
• Wide Double Doors
• Available in Various Sizes
Call us for any missing or damaged parts.
Do not return to the store.
Greenhouse
Requires twopeopleandtakes2-3hoursforInstallation.
ALL PURPOSE POLY STORAGE SHEDS
OWNER’S MANUAL /
Instructions for Assembly
Customer
Service Hotline
(800) 483-4674
www.uspolymersinc.com
Ver: 1.0
Size 8’ x 6’

Duramax Storage Shed
Limited Ten Year Warranty
U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or
workmanship for a period of ten years from the date of purchase.
This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original
purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring,
labor, installation or any other costs related thereto.
This warranty only covers failures due to defects in material or workmanship which occurs during normal
use and does not extend to color change arising due to normal weathering or to damage resulting from
misuse or neglect, commercial use, failure to follow assembly instructions and the owner’s manual (including
proper anchoring of the shed), painting, forces of nature and other causes which is beyond our control.
Claims under this warranty must be made within the warranty period by calling 1-800-483-4674 or mail in
a dated sales slip and clear photograph of the part to:
U.S. Polymers, Inc.
6915 Slauson Avenue
Commerce, CA 90040
We reserve the right to discontinue or change components. If a component has been discontinued or is
not available,
U.S. Polymers, Inc. reserves the right to substitute a component of equal quality as may be compatible.
Limits and Exclusions
There are no express warranties except as listed above. The warrantor shall not be liable for incidental or
consequential damages resulting from the use of this product, or arising out of any breach of this warranty.
All express warranties are limited to the warranty period set forth above . Some states do not allow the
exclusion or limitation on how long an implied warranty lasts, so the above limitations may not apply to
you.
This warranty gives you specific legal rights and you may also have other rights which vary from state to
state or country to country.
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.

ACCESSORIES
CODE DESCRIPTION QTY
FCFP FRONT COLUMN FITTING 2
CCFP CORNER COLUMN FITTNG 4
CFP COLUMN FITTING 15
DCBFP DOOR COLUMN BOTTOM FITTING 2
CBFP CENTER BAND FITTING 7
BS BOTTOM SLIDER 4
DH DOOR HANDLE 2
FC RIDGE END CAP 2
TC TOP CORNERS 4
TS TOP SLIDER 4
PPG ROOF PLUG WITH WASHER 50
PIN ROOF PIN 50
PW PLASTIC WASHERS 261
PC PLASTIC SCREW COVER 109
WHG HOOK 1
EDP EDGING PROFILE 1
S1 SHEET METAL SCREW 443
DIA. 4.2mm.x16.0mm. (5/32”x5/8”)
S3 MACHINE SCREW with NUTS 52
M4x10.0mm. (5/32”x3/8”)
S7 SHEET METAL SCREW 60
DIA. 4.2mm.x10.0mm. (5/32”x3/8”)
Note: Check all parts prior to installation.
CODE DESCRIPTION QTY
FC1BP FOUNDATION ‘U’CHANNEL 2
FC2BP FOUNDATION ‘U’CHANNEL 2
FC3BP FOUNDATION ‘U’CHANNEL 2
FCCP FOUNDATION ‘U’CHANNEL 4
BLBP BASE BAR BACK LEFT 1
BRBP BASE BAR BACK RIGHT 1
BSBP BASE BAR SIDE 2
BBFP BASE BAR FRONT 2
ECBP ENTRANCE TAPER CHANNEL 1
COLP COLUMN LONG 13
COSP COLUMN SHORT 2
DCLP DOOR COLUMN PROFILE LEFT 1
DCRP DOOR COLUMN PROFILE RIGHT 1
CS COLUMN SUPPORT 4
CB1P CENTER BAND FRONT 2
CB2P CENTER BAND SIDE FRONT 2
CB3P CENTER BAND SIDE FRONT 2
CB4P CENTER BAND MIDDLE 6
SLBP SLIDING CHANNEL LEFT 1
SRBP SLIDING CHANNEL RIGHT 1
SJP SLIDING CHANNEL JOINT 1
SCBP SLIDING CHANNEL COVER 1
ASBP TOP ANGLE SIDE LEFT/RIGHT 2
ABLBP TOP ANGLE BACK LEFT 1
ABRBP TOP ANGLE BACK RIGHT 1
SB1BP SUPPORT BRACKET FRONT RIGHT/BACK LEFT 2
SB2BP SUPPORT BRACKET FRONT LEFT/BACK RIGHT 2
SB3BP SUPPORT BRACKET LONG FRONT RIGHT/BACK LEFT 2
SB4BP SUPPORT BRACKET LONG FRONT LEFT/BACK RIGHT 2
FBS FACIA BRACKET SUPPORT 8
FSLBP FACIA SUPPORT LEFT 2
FSRBP FACIA SUPPORT RIGHT 2
RSBP ROOF SUPPORT 4
RS4BP ROOF STRUCTURE 4
RF1BP ROOF FLASHING FRONT RIGHT/BACK LEFT 2
RF2BP ROOF FLASHING FRONT LEFT/BACK RIGHT 2
RF3BP ROOF FLASHING FRONT LEFT/BACK RIGHT 2
RF4BP ROOF FLASHING FRONT RIGHT/BACK LEFT 2
DSTBP DOOR PANEL STRIP TOP 2
DSBBP DOOR PANEL STRIP BOTTOM 2
DMSBP DOOR PANEL MIDDLE SUPPORT 2
DVSP DOOR PANEL VERTICAL SUPPORT 2
DSP DOOR STOPPER VERTICAL 2
HS HINGES SUPPORT 1
HAS HEIGHT ADJUSTABLE SUPPORT 1
WP1A FRONT WALL PANEL LEFT 1
WP2A FRONT WALL PANEL RIGHT 1
WP3A CORNER WALL PANEL 4
WP4A WALL PANEL 6
FLBP FACIA PANEL LEFT 2
FRBP FACIA PANEL RIGHT 2
RP1BP ROOF PANEL 2
RP2BP ROOF PANEL 1
RP3BP ROOF PANEL 2
RP2BG ROOF PANEL 1
RPWG ROOF PANEL WINDOW 1
RC1P RIDGE COVER 1
RC2P RIDGE COVER 2
DLBP DOOR PANEL LEFT 1
DRBP DOOR PANEL RIGHT 1
VBCS1 VENTILATION BLOCKING COVER SIDE-1 4
VBCS2 VENTILATION BLOCKING COVER SIDE-2 2
VBCF VENTILATION BLOCKING COVER SIDE FRONT/BACK 6
Parts List
BASE BAR
(BLBP, BRBP, BSBP)
PROFILES
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
TOP ANGLE BACK
(ABLBP, ABRBP)
BASE BAR FRONT
(BBFP)
DOOR COLUMN
PROFILE LEFT
(DCLP)
ENTRANCE TAPER CHANNEL
(ECBP)
DOOR COLUMN
PROFILE RIGHT
(DCRP)
SLIDING CHANNEL COVER
(SCBP) TOP ANGLE SIDE
(ASBP)
SLIDING CHANNEL
(SLBP, SRBP) SLIDING CHANNEL
SUPPORT
(SJP)
ROOF SUPPORT
BRACKET
(SB1AP, SB2AP)
ROOF FLASHING
(RF1BP, RF2BP,
RF3BP, RF4BP
ROOF SUPPORT
(RSBP)
DOOR PANEL VERTICAL
SUPPORT
(DVSP)
DOOR STOPPER
VERTICAL
(DSP)
DOOR PANEL MIDDLE
SUPPORT
(DMSBP)
COLUMN
(COLP, COSP)
CENTER BAND
(CB2P, CB3P, CB4P, HS) CENTER BAND FRONT
(CB1P)
PLASTIC WASHER
(PW)
TOP SLIDER
(TS)
TOP CORNERS
(TC)
DOOR HANDLE
(DH)
BOTTOM SLIDER
(BS)
CENTER BAND FITTING
(CBFP)
CORNER COLUMN FITTING
(CCFP)
FRONT COLUMN FITTING
(FCFP)
COLUMN FITTING
(CFP)
ROOF PLUG
(PPG)
ROOF PIN
(PIN)
RIDGE END CAP
(FC)
MACHINE SCREW WITH
NUT (S3)
SHEET METAL SCREW
(S1, S7) FACIA SUPPORT
(FSLBP, FSRBP,
SB3BP, SB4BP)
DOOR PANEL STRIP
(DSTBP, DSBBP)
ROOF SUPPORT
(RS4BP) (HAS)
PLASTIC SCREW COVER
(PC)
COLUMN SUPPORT
(CS)
FACIA BRACKET
SUPPORT (FBS)
DOOR COLUMN
BOTTOM FITTING
(DCBFP)
HOOK (WHG)‘U’ CHANNEL
(FC1BP, 2BP, 3BP, FCCP)

Exploded View
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
RC2P
RC2P
RC1P
RF3BP
RF4BP
RF2BP
RP3BP
RF2BP
RF1BP
RF3BP
RF4BP
RS4BP
FLBP
FRBP
FSRBP
FLBP
FSLBP
SB1BP
SB3BP
SB2BP
SB1BP FBS
SB4BP RS4BP
SB2BP
ASBP ABLBP
ASBP
SLBP
SRBP
SJP
CB3P
CB4P
CB2P
WP4A
WP3A WP4A
BRBP
BLBP
BSBP
BBFP
COSP
WP2A
SCBP
DCRP
WP1A
SB3BP
FSLBP
FSRBP
ABRBP
CB1P
BSBP
WP4A
COSP
RP3BP
RP2BG
RP1BP
RP1BP
CB3P
CB2P
CB4P
BBFP
CB1P
DCLP
RF1BP
Left
Door Right
Door
CB4P
COLP
RP2BP
RSBP
HS
RPWG
ECBP
FC1BP
FC2BP
FC3BP
FCCP
FC1BP
FC2BP
WHG
FRBP
RSBP
HAS
VBCS2
VBCS1
VBCS2
VBCS1
CB4P
VBCF
WP4A WP4A WP4A
WP3A
COLP
WP3A
VBCF
FC3BP
VBCF
COLP

A. Foundation & Base Frame
Note: It is important that these instructions
are followed step by step.
1
(2) Foundation ‘U’ Channel (FC1BP)
(2) Foundation ‘U’ Channel (FC2BP)
(2) Foundation ‘U’ Channel (FC3BP)
(4) Foundation ‘U’ Channel (FCCP)
(1) Base bar back left (BLBP)
(1) Base bar back right (BRBP)
(2) Base bar side left & right (BSBP)
(2) Base bar front (BBFP)
(1) Entrance taper channel (ECBP)
(8) Sheet metal screws (S7)
(56) Sheet metal screws (S1)
Parts needed:
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
1. Assemble the channel (FC1BP) & (FC2BP)
together using (S1) screws. Make 2 sets.
FC2BP
2. Make a frame with the sub assemblies as shown below.
Make sure while assembling, the
channel position should be as
shown.
Note
FC1BP
S1
Channel Position
FC3BP
FC2BP
FC1BP
FC1BP
FC2BP
FC3BP
Before Assembling Foundation
make sure that the floor level
should be perfect flat.
Note

2
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
3. Fix the channel (FCCP) to all the four corners to
make a perfect frame. See Fig.
FCCP
FCCP
FCCP
4. Assemble base bar back left (BLBP) and base
bar back right (BRBP) with four (S7) screws.
See fig. 1 & 2.
5. Place the base bar assembly on top of the
foundation. Use (S1) screws to fix the assembly to
foundation.
Fig.1 Fig.2
S7
S1
Back
BLBP
BRBP
BLBP
BRBP
BLBP
BRBP
FCCP

3
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
Fig.1
Fig.2
Step 1
Step 2
BSBP
BLAP
BRAP
BSBP
S7
S7
BSBP
BSBP
6. Insert the base bar side (BSBP) into (BLBP) &
(BRBP) secure with two (S7) screws on both sides.
See blowup.
7. Line up the holes with foundation and secure with
(S1) screws.
S1 S1
BSBP
BSBP
1
2
8. Place the base bar (BBFP) on top of (BSBP) on
both sides. Secure with (S7) screw to (BSBP) on
both corners. See fig. 1 & 2.
BBFP
BSBP
Fig.1
BBFP
BSBP
Fig.2
S7
BBFP
BBFP

4
Parts Needed:
(2) Column short (COSP)
(13) Column long (COLP)
(4) Column support (CS)
(1) Wall panel front left (WP1A)
(1) Wall panel front right (WP2A)
(4) Wall panel corner (WP3A)
(6) Wall panel side (WP4A)
(1) Sliding channel right (SRBP)
(1) Sliding channel left (SLBP)
(1) Sliding channel joint (SJP)
(1) Sliding channel cover (SCBP)
(2) Top angle side left & right (ASBP)
(1) Top angle back left (ABLBP)
(1) Top angle back right (ABRBP)
(2) Center band front (CB1P)
B. Walls & Columns
All panels are clearly marked
and care should be taken to
use the correct one.
Note
(2) Center band side front (CB2P)
(2) Center band side back (CB3P)
(6) Center band middle (CB4P)
(1) Door column profile left (DCLP)
(1) Door column profile right (DCRP)
(4) Corner column fitting (CCFP)
(7) Center band fitting (CBFP)
(2) Front column fitting (FCFP)
(15) Column fitting (CFP)
(2) Door Column bottom fitting (DCBFP)
(4) Top slider (TS)
(148) Plastic washer (PW)
(6) Vantilation Blocking Cover Front/Back (VBCF)
(248) Sheet metal screw (S1)
(20) Sheet metal screw (S7)
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
9. Secure the base (BBFP) to the foundation with
(S1) screws.
BBFP
S1
BBFP
10. Place the entrance taper channel (ECBP) on
top of the (BBFP). Secure with (S1) screws to the
foundation. See fig. 1 & 2. S1
Fig.1 Fig.2
ECBP
BBFP
BBFP
BBFP
ECBP
After completing the assembly
of the base bar fill the concrete
or sand upto the foundation
top suraface
Note

5
1. Place the corner column fitting (CCFP) on top of
the base bar (BBFP & BSBP). Secure with the three
(S1) screws to the base bar.
Follow the same at the other corner.
2.Insert the column (COSP) & (COLP) in to corner
column fitting and secure with (S1) screws from
inside. Insert the column (COSP) at the top of base
(BBFP) and column (COLP) at the top of (BSBP)
3. Fix the column support (CS) to the column with
two (S1) screws.
Make sure the direction of the
column opening and arrow up
as per blow up.
Note
Fig.1 Fig.2
CCFP
BBFP
COSP
S1
COLP
S1
BSBP
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
BACK
BBFP
BSBP
CCFP
S1
S1
cs
BSBP
BSBP
BBFP
BBFP
BBFP
BBFP

6
4.Insert the column (COSP) & (COLP) in to corner
column fitting and secure with (S1) screws from
inside. Insert the column (COSP) at the top of base
(BBFP) and column (COLP) at the top of (BSBP)
5. Fix the column support (CS) to the column with
two (S1) screws.
6. Assemble the sliding channel (SLBP & SRBP)
together with sliding channel joint (SJP). Secure
with 8 screws (S7)
Fig.1 Fig.2
BSBP
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
S1
S1
COLP
COSP
Fig.3
BBFP
cs S1
SLBP
SJP
SRBP
SJP
S7
SRBP
SLBP
Make sure the direction of the
column opening and arrow up
as per blow up.
Note

7
7.Insertthefrontcolumnfittingatthetopoffrontcolumn
(COSP) and secure with (S1) screws from inside.
Continue the same at the other side.
8. Place the sliding channel assembly (SLBP & SRBP)
on the top of front column fitting at the both ends.
Secure with (S1) screws.
9.Insert4nosoftopslider (TS) into the sliding channel
as per the direction shown.
Fig.1
Fig.2
COSP
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
S1
FCFP
SLBP
SRBP
FCFP S1
SRBP
TS
FCFP
S1
COSP
2
1

8
10. Place the wall panel (WP3A) on the base bar
(BSBP) front right side of the shed. Line up the holes
with base bar.
Secure with (S1) screws with washers from out side.
11. Place the wall panel (WP2A) on the base bar
(BBFP). Line up the holes with base bar.
Secure with (S1) Screws.
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
WP3A
BSBP
S1
WP2A
WP2A
BBFP
S1
1
FRONT
BBFP
First fix the middle screws then
go to the edges.
Tip
First fix the middle screws (top
or bottom) then go to the edges.
Tip
12. Insert the Ventilation Blocking Cover (VBCF) in
between the sliding channel (SRBP) and the wall panel
(WP2A). Lineup the holes with the sliding channel &
secure with (S1) screws.
WP2A
S1
SRBP
WP3A
WP2A
SRBP
VBCF

14. Place the right Door column (DCRP) on top of
the base bar (BBFP) and insert into the wall panel
(WP2A).Line up the holes with wall panel and secure
with (S1) screws.
S1
BBFP
DCRP
Fig.2
DCRP
Fig.3
3
1
2
WP2A
S1
SRBP
SRBP
DCRP
WP2A
Fig.1
15.Fix the door column bottom to the fitting (DCBFP)
with (S1) screws.
WP2A
DCRP
BBFP
S1 BBFP
S1
ECBP
BBFP
DCBFP
WP2A
13. Fix to door column bottom fitting (DCBFP) on
the base bar (BBFP) with (S1) screws.
Note Make sure the door column
bottom fitting to be inside
the door column.
9
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.

16. Assemble the center band (CB1P) with column
fitting (CFP). Secure with (S1) screw at one end.
Make 2 Sets.
Fig.1 Fig.2
CB1P
CFP
S1
CB1P
10
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
17. Fix the column fitting (CFP) to the front column
(COSP) with (S1) screws from inside, fix the other
end to the Door Column (DCRP) through the wall
panel with (S1) screw from inside.
18. Secure the wall panel (WP2A) to the center
band (CB1P) with (S7) screws with washer from
outside.
Fig.1 Fig.2
DCRP
S1
CB1P
CB1P
S1
COSP 2
1
S7
WP2A

11
20. Place the wall panel (WP1A) on the base bar
(BBFP). Line up the holes with base bar.
Secure with (S1) screws.
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
S1
WP1A
BBFP
WP1A
BBFP
First fix the middle screws (top
or bottom) then go to the edges.
Tip
19. Place the wall panel (WP3A) on the base bar
(BSBP) front left side. Line up the holes with base bar.
Secure with (S1) screws with washers from out side.
Fig.1
WP3A
BSBP
S1 FRONT
First fix the middle screws then
go to the edges.
Tip
21. Insert the Ventilation Blocking Cover (VBCF) in
between the sliding channel (SLBP) and the wall panel
(WP1A). Lineup the holes with the sliding channel &
secure with (S1) screws.
WP3A
WP1A
S1
WP1A
SLBP
SLBP
VBCF

12
23. Place the left Door Column (DCLP) on top of
the base bar (BBFP) and insert in to the wall panel
(WP1A).Line up the holes with wall panel and secure
with (S1) screws.
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
Fig.1
Fig.3
Fig.2
S1
S1
DCLP
3
2
1
DCLP WP1A
SLBP
WP1A
SLBP
DCLP
BBFP
22. Fix to door column bottom fitting (DCBFP) on
the base bar (BBFP) with (S1) screws.
S1
BBFP
ECBP
DCBFP
WP1A
Make sure the door column
fitting to be inside the door
column
Note
24. Fix the door column bottom to the fitting
(DCBFP) with (S1) Screws.
S1
DCLP

27. Place the Corner Column fitting (CCFP) on top
of the base bar at the back side on both corners.
Secure with (S1) screws.
Fig.1 Fig.2
S1
CCFP
CCFP
S1
1
2
BACK
13
26. Secure the wall panel (WP1A)to the centre band
(CB1P) with (S7) screws from outside.
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
WP1A
Fig.1 Fig.2
25Fix the Column fitting (CFP) to the front Column
(COSP) with (S1) screw from inside.
Fix other end to the Door Column (DCLP) through the
wall panel with (S1) screw from inside.
S1
DCLP
CB1P
S1
CFP
WP1A
S7
12

14
28.Insert the column (COLP) into the Corner Column
fitting (CCFP) and secure with (S1) screws.
30. Place the wall panel (WP3A) on the base bar
side (BSBP) at back left .Line up the hole with base
bar and secure with (S1) screws with washers from
out side.
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
Make sure the direction of
the Column opening and
arrow up as per blowup
Note
S1
S1
S1
BSBP
Fig.1 Fig.2
Fig.3 Fig.4
COLP
COLP
Fig.5
1
2 & 3
4
5
FRONT
BACK
WP3A
COLP
COLP
BSBP
First fix the middle screws then
go to the edges.
Tip
Fig.1
29. Fix the Column Support (CS) to the columns with
two (S7) screws at both corners.
S7
COLP
COLP
CS
COLP
COLP

15
31.Place the wall panel (WP4A) on the base bar
back left (BLBP). Line up the holes with base bar
and secure with (S1) screws. See the blow up
Fig.1 Fig.2
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
S1 WP4A WP3A
WP4A
1
2
BLBP
Make sure the overlapping
position of panels is as
shown in fig. 2.
Note
First fix the middle screws then
go to the edges.
Tip
32. Place the wall panel (WP3A) on the base bar
(BSBP). Line up the holes with base bar and secure
with (S1) screws with washer from out side.
Fig.1
WP3A
S1
BSBP
BSBP
First fix the middle screws then
go to the edges.
Tip
33. Place the wall panel (WP4A) on the base bar
(BRBP). Line up the hole with base bar and secure
with (S1) screw with washer from out side.
Fig.1 Fig.2
DCL
S1
BRBP WP4A
BRBP
WP4A
WP3A
Make sure the overlapping
position of panels is as
shown in fig. 2.
Note
First fix the middle screws (top
or bottom) then go to the edges.
Tip
1
2

16
34.Assemble the top back angle left & right (ABLBP
& ABRBP) together with (S7) screws.
See the blow up
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
ABRBP
ABLBP
S7
ABLBP
ABRBP
35. Place the assembled top angle back in between
the column and back wall panel top side. Then insert
the Ventilation Blocking Cover (VBCF) in between the
top angle and the wall panel. Line up the holes with
panel and secure with (S1) screws from outside.
ABRBP
S1
ABLBP
S1
Fig.1
Fig.2
2
1
ABLBP
ABRBP
VBCF
VBCF
36. Place the top angle side (ASBP) on top of back
top angle (ABLBP) and top of sliding channel (SLBP).
Secure with (S1) screws from top.
1
2
ASBP
ASBP
S1
S1
Fig.1
Fig.2
ASBP
Table of contents
Popular Greenhouse Kit manuals by other brands

Alton
Alton Evolution Six LT instruction manual

Mercia Garden Products
Mercia Garden Products 04VCGRO-V2 General instructions

Juliana
Juliana 05112019-CH manual

Palram
Palram Mythos 6'x10' Assembly instructions

Infloria
Infloria GH010992 manual

Harbor Freight Tools
Harbor Freight Tools OneStopGardens 04325 Assembly instructions

simpo
simpo 3-in-1 Garden System Assembly instruction

Palram
Palram Balance 8'x12' Hybrid Glazing Assembly instructions

Palram
Palram Victory Orangery Assembly instructions

Vitavia
Vitavia Neptun Plus 6700 Assembly instructions

Greenhouse Style
Greenhouse Style Five-Wall Series instructions

Serranova
Serranova 24 manual