
4Revision date: 04.18.19
READ THIS DOCUMENT BEFORE YOU BEGIN TO
INSTALL THE END CLADDING.
Thank you for purchasing a Series 500 greenhouse
kit with a black-out system, ventilation & evaporative
cooling. When properly assembled and maintained,
this product will provide years of reliable service.
These instructions include helpful hints and important
information needed to safely assemble and properly
maintain the structure. Please read these instructions
before you begin.
If you have any questions during the assembly, contact
Customer Service for assistance.
SAFETY PRECAUTIONS
• Wear eye and ear protection.
• Wear gloves when handling metal.
• Use a portable GFCI (Ground Fault Circuit
Interrupter) when working with electric power tools
and cords.
Important Information
UNPACK AND IDENTIFY PARTS
The following steps will ensure that you have all the
necessary parts before you begin.
1. Unpack the contents of the shipment and place where
you can easily inventory the parts. Refer to the Bill of
Materials/Spec Sheets.
Verify that all parts listed on the Bill of Materials/Spec
Sheets are present. If anything is missing or you have
questions, consult the parts guide (below) and
all diagrams for clarification, or contact Customer
Service.
NOTE: At this time, you do not need to open the
plastic bags containing smaller parts such as
fasteners and clamps.
For replacement or missing parts, call 1.800.245.9881
for assistance.
ASSEMBLY PROCEDURE
Following the instructions as presented will help ensure
the proper assembly of the evaporative cooling system.
The steps outlining the assembly process are as follows:
1. Verify that all parts are included in the shipment. Notify
customer service for questions or concerns.
2. Read these instructions and all additional
documentation included with the shipment before you
begin.
3. Gather the tools and assistants.
4. For best results, assemble the components in the
order they are presented in these instructions.
ELECTRICAL WARNING
CONSULT THE SERVICES OF A QUALIFIED
ELECTRICAL TECHNICIAN WHEN
INSTALLING THE WATER PUMP OR ANY
ELECTRICALLY POWERED ACCESSORIES.
REQUIRED TOOLS
The following list identifies the main tools needed to
assemble and install the breathable wall light trap and
kit components (if applicable). Additional tools may be
needed.
• Tape measure and marker.
• Variable speed drill (cordless with extra batteries
works best) & 3/8" drill bit.
• Small hammer and gloves.
• Level (length depends on kit dimensions).
• 7/16" & 1/2" wrenches and a socket set containing
7/16" & 1/2" deep-well socket.
• Wrench set, tool to cut 1/8" cable, & pliers.
• C-clamps or similar tools.
CARE AND MAINTENANCE
Proper care and maintenance is important. Check the
following items periodically to ensure breathable wall light
trap components are secure and functioning properly.
• Check all fasteners to verify they remain tight.
• Never climb or stand on any part of the light trap and
its frame components.
• Ensure nothing blocks either side of light trap.
• Inspect all electrical connections and wires. Repair or
replace as needed.