
Quick Start Guide
– 2 –
Mount the Device
Ground the Device
Connect Power
1. Connect the RTN return. (red wire).
2. Connect the -36 – -72 VDC (black wire).
3. Connect the Chassis Ground (yellow-green wire).
Verify Device Power
Make Network Connections
Warning:
For a safe and reliable installation, use only the
accessories and screws provided with the device. Use of other
accessories and screws could result in damage to the unit. Any
damages incurred by using unapproved accessories are not
covered by the warranty.
Avertissement:
Pour une installation sûre et fiable, utilisez
uniquement les accessoires et les vis fournies avec l’appareil.
L’utilisation d’autres accessoires et vis pourrait endommager
l’appareil. Les dommages causés par l’utilisation d’accessoires
non approuvés ne sont pas couverts par la garantie.
Caution:
The device includes plug-in power supplies (PSUs)
and fan tray modules that are installed into its chassis. Make
sure all installed modules have a matching airflow direction.
Attention:
Le appareil comprend des modules
d’alimentation et de modules de ventilation installés dans son
châssis. Assurez-vous que tous les modules installés ont une
direction d’air adaptée.
Note:
The device has the Open Network Install Environment
(ONIE) software installer preloaded on the switch, but no switch
software image. Information about compatible switch software
can be found at www.edge-core.com.
Note:
Model name and approval markings are indicated on
the product label located on the bottom of the device.
1. Attach the Brackets
Use the included screws to attach the left and right brackets.
2. Mount the Device
Mount the device in the rack and secure it with rack screws.
Ensure the Rack is Grounded
Ensure the rack on which the device is to be mounted is properly
grounded and in compliance with ETSI ETS 300 253. Verify that there
is a good electrical connection to the grounding point on the rack (no
paint or isolating surface treatment).
Ground the Device
Attach a #14 AWG grounding wire (not included) to the grounding
point on the device rear panel. Then connect the other end of the wire
to rack ground.
Caution:
Use a UL/IEC/EN 60950-1 certified power supply
to connect to a DC converter, and a #14 AWG (for -36 – -72
VDC PSU).
Attention:
Utilisez une alimentation certifiée UL/IEC/EN
60950-1 pour le connecter à un convertisseur CC et un câble
AWG #14 (pour -36 – -72 VDC) pour vous connecter à une
alimentation CC.
Note:
DC terminal screws should be tightened to a torque of
6.6 in-lbs.
AC or DC Power
Connect the two AC or DC PSUs to a power source.
Check the PSU LEDs
The PSU1/PSU2 LEDs should be on green when operating normally.
1. SFP GPON slots
First install GPON transceivers and then connect fiber optic cabling to
the transceiver ports.
Installation