Emco A1100EVR GUARDIAN User manual

PREVENTIVE MAINTENANCE
1. Annually, conduct a visual inspection of the flapper valve located inside the
A1100EVR overfill prevention valve. Begin by removing the spill containment
lid and fill adapter cap. Looking down over the tank fill riser opening, verify
that the flapper valve is open and free of any foreign objects that can block
or restrict the flow of gasoline into the underground storage tank during a fuel
delivery.
2. Annually, verify leak tightness integrity of the A1100EVR overfill prevention
valve by performing ARB test procedure TP-201.1D.
3. If the A1100EVR overfill prevention valve fails to pass the leak tightness
integrity test, replace the drop tube o-ring with the EMCO o-ring kit p/n
569461.
PERFORMANCE SPECIFICATIONS
This component was factory tested to, and met, the following specifications.
1. TP-201.1D - Meets or exceeds the allowable maximum leakrate of 0.17 CFH
@ 2.00 inches of water.
IMPORTANT: Leave these installation instructions, product warranty
registration card and the warranty tag with the station owner and/or
operator.
p/n 568415
Rev. Z, 03/17
Emco Wheaton Retail Corp.
2300 Industrial Park Dr. • Wilson, NC 27893
252-243-0150 • 252-243-4759 (fax)
A1100EVR GUARDIAN
OVERFILL PREVENTION VALVE
WITH THREADED BOTTOM
INSTALLATION INSTRUCTIONS
Permanent Identification:
(1) Collar #566679 with: (1) Tube, Seals-All Sealant #566726
(1) O-ring #480049 installed (1) Counter Sink Indenter #564416
(1) Drop Tube O-ring #569461 installed (4) Rivets #564412
(1) Warning Plate #564420 (1) Hose Clamp #564421
Packing List:
Month/Year
of Manufacture
CAUTION:
1. Always barricade to keep pedestrians and vehicles from accessing the
storage tank area during preventive maintenance and/ or compliance testing
of the EMCO phase I EVR system.
2. If the underground storage tank is equipped with a ball float vent valve, make
sure it does not extend below the positive shut-off point of the A1100EVR
overfill prevention valve. If so, the ball float valve must be removed to allow
proper operation of the A1100EVR overfill prevention valve.
3. Never disconnect the delivery elbow from the fill adapter when the
A1100EVR overfill prevention valve has reached the positive shut-off point of
95% total capacity. Note the tank delivery hose is full and must not be dis-
connected until enough fuel has been evacuated from the underground stor-
age tank. This will allow the tank delivery hose to drain, and to safely discon-
nect from the fill adapter. Premature disconnection will result in a hazardous
spill and/or a potential for personal injury and property damage.
4. Once the A1100EVR overfill prevention valve is completely assembled, the
Seals-All Sealant must cure for a minimum of 24 hours before installing
into the underground storage tank.
• 13/64” Drill Bit • Hacksaw w/ fine tooth • Pipe Thread Sealant Compound
• Rivet Gun • Hand file w/ fine blade • 150 Grit Size Emery Cloth
• Power Drill • Marker • De-burring Tool w/ #10 Blade
• Tape Measure • Hammer • Fabric Strap Wrench (2)
• EMCO Drill Fixture p/n 566675
Service Tool Required:
Model #

Place tape measure at the end of the top tube
(riser collar) and measure down to distance E.
Carefully cut the drop tube to the required
length. Use a hacksaw equipped with a fine
tooth blade to ensure a straight 90-degree cut.
An angled cut is permissable, but the 4”-6” dis-
tance from the bottom of the tank must corre-
spond to the top of the cut as shown.
Spill
Containment
Tape Measure
Riser Pipe
Figure 4
ED
20. Remove all metal chips or debris left from cutting or drilling. Shake the
A1100EVR overfill prevention valve in a vertical position. Verify that the
A1100EVR drop tube o-ring is installed properly. Locate the A1100EVR
overfill prevention valve over the tank fill riser opening with the A1100EVR
collar pointing upward. Carefully lower the A1100EVR overfill prevention
valve into the tank until the A1100EVR collar is resting on the riser pipe.
21. Install warning plate on the riser using the hose clamp provided.
A1100EVR Overfill Prevention Valve Top Drop Tube Cut Length
1. Find measurement A, the distance from the inside top of the tank to the top
edge of the riser pipe as shown in Figure 1.
If the tank has a manway (Figure 3), make sure to include the height of the
manway when finding measurement A as shown in Figure 2, A =J+H.
Consult your tank diagram to determine the proper H dimension. If this
dimension cannot be found, use 6” as the H dimension (typical manway
height is 5”-7”).
When installing the A1100EVR overfill prevention valve below the spill
containment drain valve, measurement A is the distance between the inside
top of the tank to the top edge of the A1100EVR overfill prevention valve
seat as shown in Figure 2.
7
Tape Measure
Riser Pipe
Maximum
Fluid Level
Spill
Containment
Containment
Nipple
Figure 1
B
A
A1100EVR Overfill Prevention Valve Installed Above Drain Valve
Conventional, Non-EVR Application
19. Bottom Tube Cut Location, Measurement E:
Find measurement D, the distance between the
top of the riser pipe and the bottom of the tank
as shown in Figure 3.
PEI Recommended Practice suggests 4”-6”.
Cut Length E = D - 5”
A1100EVR Overfill Prevention Valve to Tank Fill Riser
Figure 2
Maximum
Fluid Level
Riser Pipe
B
A
A1100EVR
Seat
A1100EVR Overfill Prevention Valve Installed Below Drain Valve
EVR Application
Top of
angled cut
Bottom of
tank
4”-6”
4”-6”
C
C
IMPORTANT: Do not use a power saw, pipe or tubing cutter as this may
result in damage to the bottom of the lower drop tube, voiding warranty.
2

15. Apply pipe thread sealant compound to the male threads of the A1100EVR
base.
16. Manually tighten both
top and bottom drop
tubes to avoid cross
threading.
17. Use two fabric strap wrenches to permanently tighten.
IMPORTANT: Once the Seals-All sealant has cured for a minimum of 24
hours and before installing the A1100EVR overfill prevention valve into the
underground storage tank, a leak tightness integrity test must be performed.
18. Test the A1100EVR overfill prevention valve by sealing both ends with
inflatable plumber’s plugs. Apply a maximum pressure of 2 inches of water
column. Should the leak rate exceed the allowable limit of 0.17 CFH, locate
the leak point by spraying soap solution along the outside of the A1100EVR
overfill prevention valve.
IMPORTANT: Do not exceed the maximum presssure of 2 inches of water
column. This will damage the A1100EVR overfill prevention valve and result
in voiding the warranty.
63
A1100EVR Overfill Prevention Valve to Lower Drop Tube
Place tape
measure here
Measurement C,
cut length
Figure 3
2. Find measurement B from the chart below, the distance from the maximum
fluid level allowed to the inside top of the tank. The calculations are based
on cylindrical tanks with flat ends. For exact dimensions, consult the manu-
facturer’s tank charts. Use the actual capacity of the tank for calculations.
NFPA30 Guidelines limit tank fill to 95%.
95% Shut-off
Tank Diameter B Dimension
Feet Meters Inches mm
6.5’ 1.98 7.5" 190
7.0’ 2.13 8.0" 203
7.6’ 2.29 9.0" 229
8.0’ 2.44 9.5" 241
8.2’ 2.50 9.5" 241
8.5’ 2.59 10.0" 254
9.0’ 2.74 10.5" 267
9.5’ 2.90 11.0" 279
10.0’ 3.05 11.5" 292
12.0’ 3.66 14.0" 336
IMPORTANT: The A1100EVR overfill prevention valve is not recommended
for tanks under 6.5 feet in diameter.
3. Top Tube Cut Location, Measurement C: Add measurements A and B.
Place tape measure at the 95% fill mark on the valve and measure up the
tube as shown. Mark and cut the tube at the C measurement length.
Example: Top drop tube cut length, C = A + B

14. Once finished with steps 11 through 13, clean and remove all excess
sealant around the top of the A1100EVR collar and rivets.
IMPORTANT: The Seal-All sealant must cure for a minimum of 24 hours
before installing into the underground storage tank.
5
4
10. Apply a 1/2 inch bead of Seals-
All Sealant around the 480049 o-ring
and outside area of the A1100EVR
collar. Verify the o-ring is properly
secured inside the machined groove.
Do not apply sealant to the 569461
drop tube o-ring.
11. Slide the A1100EVR collar inside
the top end of the drop tube and align
the four holes.
12. Using the indenter tool and a
hammer, apply a sharp blow to
counter sink each individual hole
before attempting to install the
mounting rivets.
13. Using only the factory supplied
rivets, apply a good amount of the
Seals-All Sealant around the base of
each rivet before installing into each of
the four holes. Using the rivet gun,
permanently fasten the A1100EVR
collar to the top of the drop tube.
4. Carefully cut the top drop tube to
the required length. Use a hacksaw
equipped with a fine tooth blade to
ensure a straight 90-degree cut.
IMPORTANT: Do not use a power
saw, pipe or tubing cutter as this
may result in damage to the top
drop tube, voiding warranty.
5. Slide the EMCO Drill Fixture p/n
566675 onto the end of the top drop
tube until the edge bottoms out
against the inside ridge.
6. Drill four 13/64 diameter holes
through the top drop tube. Remove
the drill fixture from the top drop
tube. Using a de-burring tool
equipped with a #10 blade, remove
any sharp burrs around the inside
area of the mounting holes.
7. Using a fine blade hand file,
remove all burrs from the inside and
outside edge of the top drop tube.
File the edge of the top drop tube
square. File the inside surface of the
holes. Remove all rough edges.
A1100EVR Collar to Top Drop Tube
8. Using a de-burring tool equipped with a #10 blade, remove the sharp cutting
ring from the inside edge of the top drop tube. Lightly sand the inside area of
the top drop tube and mounting holes using 150-grit size emery cloth. Clean
and remove any sanding debris.
IMPORTANT: Failure to perform this procedure will damage the o-ring seal
during the installation of the A1100EVR collar, voiding warranty.
9. Remove the o-ring (p/n 480049)
from the A1100EVR collar groove.
Lightly sand the outside area using
150-grit emery cloth. Clean and
remove any sanding debris.
Re-install o-ring.
569461
480049

14. Once finished with steps 11 through 13, clean and remove all excess
sealant around the top of the A1100EVR collar and rivets.
IMPORTANT: The Seal-All sealant must cure for a minimum of 24 hours
before installing into the underground storage tank.
5
4
10. Apply a 1/2 inch bead of Seals-
All Sealant around the 480049 o-ring
and outside area of the A1100EVR
collar. Verify the o-ring is properly
secured inside the machined groove.
Do not apply sealant to the 569461
drop tube o-ring.
11. Slide the A1100EVR collar inside
the top end of the drop tube and align
the four holes.
12. Using the indenter tool and a
hammer, apply a sharp blow to
counter sink each individual hole
before attempting to install the
mounting rivets.
13. Using only the factory supplied
rivets, apply a good amount of the
Seals-All Sealant around the base of
each rivet before installing into each of
the four holes. Using the rivet gun,
permanently fasten the A1100EVR
collar to the top of the drop tube.
4. Carefully cut the top drop tube to
the required length. Use a hacksaw
equipped with a fine tooth blade to
ensure a straight 90-degree cut.
IMPORTANT: Do not use a power
saw, pipe or tubing cutter as this
may result in damage to the top
drop tube, voiding warranty.
5. Slide the EMCO Drill Fixture p/n
566675 onto the end of the top drop
tube until the edge bottoms out
against the inside ridge.
6. Drill four 13/64 diameter holes
through the top drop tube. Remove
the drill fixture from the top drop
tube. Using a de-burring tool
equipped with a #10 blade, remove
any sharp burrs around the inside
area of the mounting holes.
7. Using a fine blade hand file,
remove all burrs from the inside and
outside edge of the top drop tube.
File the edge of the top drop tube
square. File the inside surface of the
holes. Remove all rough edges.
A1100EVR Collar to Top Drop Tube
8. Using a de-burring tool equipped with a #10 blade, remove the sharp cutting
ring from the inside edge of the top drop tube. Lightly sand the inside area of
the top drop tube and mounting holes using 150-grit size emery cloth. Clean
and remove any sanding debris.
IMPORTANT: Failure to perform this procedure will damage the o-ring seal
during the installation of the A1100EVR collar, voiding warranty.
9. Remove the o-ring (p/n 480049)
from the A1100EVR collar groove.
Lightly sand the outside area using
150-grit emery cloth. Clean and
remove any sanding debris.
Re-install o-ring.
569461
480049

15. Apply pipe thread sealant compound to the male threads of the A1100EVR
base.
16. Manually tighten both
top and bottom drop
tubes to avoid cross
threading.
17. Use two fabric strap wrenches to permanently tighten.
IMPORTANT: Once the Seals-All sealant has cured for a minimum of 24
hours and before installing the A1100EVR overfill prevention valve into the
underground storage tank, a leak tightness integrity test must be performed.
18. Test the A1100EVR overfill prevention valve by sealing both ends with
inflatable plumber’s plugs. Apply a maximum pressure of 2 inches of water
column. Should the leak rate exceed the allowable limit of 0.17 CFH, locate
the leak point by spraying soap solution along the outside of the A1100EVR
overfill prevention valve.
IMPORTANT: Do not exceed the maximum presssure of 2 inches of water
column. This will damage the A1100EVR overfill prevention valve and result
in voiding the warranty.
63
A1100EVR Overfill Prevention Valve to Lower Drop Tube
Place tape
measure here
Measurement C,
cut length
Figure 3
2. Find measurement B from the chart below, the distance from the maximum
fluid level allowed to the inside top of the tank. The calculations are based
on cylindrical tanks with flat ends. For exact dimensions, consult the manu-
facturer’s tank charts. Use the actual capacity of the tank for calculations.
NFPA30 Guidelines limit tank fill to 95%.
95% Shut-off
Tank Diameter B Dimension
Feet Meters Inches mm
6.5’ 1.98 7.5" 190
7.0’ 2.13 8.0" 203
7.6’ 2.29 9.0" 229
8.0’ 2.44 9.5" 241
8.2’ 2.50 9.5" 241
8.5’ 2.59 10.0" 254
9.0’ 2.74 10.5" 267
9.5’ 2.90 11.0" 279
10.0’ 3.05 11.5" 292
12.0’ 3.66 14.0" 336
IMPORTANT: The A1100EVR overfill prevention valve is not recommended
for tanks under 6.5 feet in diameter.
3. Top Tube Cut Location, Measurement C: Add measurements A and B.
Place tape measure at the 95% fill mark on the valve and measure up the
tube as shown. Mark and cut the tube at the C measurement length.
Example: Top drop tube cut length, C = A + B

Place tape measure at the end of the top tube
(riser collar) and measure down to distance E.
Carefully cut the drop tube to the required
length. Use a hacksaw equipped with a fine
tooth blade to ensure a straight 90-degree cut.
An angled cut is permissable, but the 4”-6” dis-
tance from the bottom of the tank must corre-
spond to the top of the cut as shown.
Spill
Containment
Tape Measure
Riser Pipe
Figure 4
ED
20. Remove all metal chips or debris left from cutting or drilling. Shake the
A1100EVR overfill prevention valve in a vertical position. Verify that the
A1100EVR drop tube o-ring is installed properly. Locate the A1100EVR
overfill prevention valve over the tank fill riser opening with the A1100EVR
collar pointing upward. Carefully lower the A1100EVR overfill prevention
valve into the tank until the A1100EVR collar is resting on the riser pipe.
21. Install warning plate on the riser using the hose clamp provided.
A1100EVR Overfill Prevention Valve Top Drop Tube Cut Length
1. Find measurement A, the distance from the inside top of the tank to the top
edge of the riser pipe as shown in Figure 1.
If the tank has a manway (Figure 3), make sure to include the height of the
manway when finding measurement A as shown in Figure 2, A =J+H.
Consult your tank diagram to determine the proper H dimension. If this
dimension cannot be found, use 6” as the H dimension (typical manway
height is 5”-7”).
When installing the A1100EVR overfill prevention valve below the spill
containment drain valve, measurement A is the distance between the inside
top of the tank to the top edge of the A1100EVR overfill prevention valve
seat as shown in Figure 2.
7
Tape Measure
Riser Pipe
Maximum
Fluid Level
Spill
Containment
Containment
Nipple
Figure 1
B
A
A1100EVR Overfill Prevention Valve Installed Above Drain Valve
Conventional, Non-EVR Application
19. Bottom Tube Cut Location, Measurement E:
Find measurement D, the distance between the
top of the riser pipe and the bottom of the tank
as shown in Figure 3.
PEI Recommended Practice suggests 4”-6”.
Cut Length E = D - 5”
A1100EVR Overfill Prevention Valve to Tank Fill Riser
Figure 2
Maximum
Fluid Level
Riser Pipe
B
A
A1100EVR
Seat
A1100EVR Overfill Prevention Valve Installed Below Drain Valve
EVR Application
Top of
angled cut
Bottom of
tank
4”-6”
4”-6”
C
C
IMPORTANT: Do not use a power saw, pipe or tubing cutter as this may
result in damage to the bottom of the lower drop tube, voiding warranty.
2

PREVENTIVE MAINTENANCE
1. Annually, conduct a visual inspection of the flapper valve located inside the
A1100EVR overfill prevention valve. Begin by removing the spill containment
lid and fill adapter cap. Looking down over the tank fill riser opening, verify
that the flapper valve is open and free of any foreign objects that can block
or restrict the flow of gasoline into the underground storage tank during a fuel
delivery.
2. Annually, verify leak tightness integrity of the A1100EVR overfill prevention
valve by performing ARB test procedure TP-201.1D.
3. If the A1100EVR overfill prevention valve fails to pass the leak tightness
integrity test, replace the drop tube o-ring with the EMCO o-ring kit p/n
569461.
PERFORMANCE SPECIFICATIONS
This component was factory tested to, and met, the following specifications.
1. TP-201.1D - Meets or exceeds the allowable maximum leakrate of 0.17 CFH
@ 2.00 inches of water.
IMPORTANT: Leave these installation instructions, product warranty
registration card and the warranty tag with the station owner and/or
operator.
p/n 568415
Rev. Z, 03/17
Emco Wheaton Retail Corp.
2300 Industrial Park Dr. • Wilson, NC 27893
252-243-0150 • 252-243-4759 (fax)
A1100EVR GUARDIAN
OVERFILL PREVENTION VALVE
WITH THREADED BOTTOM
INSTALLATION INSTRUCTIONS
Permanent Identification:
(1) Collar #566679 with: (1) Tube, Seals-All Sealant #566726
(1) O-ring #480049 installed (1) Counter Sink Indenter #564416
(1) Drop Tube O-ring #569461 installed (4) Rivets #564412
(1) Warning Plate #564420 (1) Hose Clamp #564421
Packing List:
Month/Year
of Manufacture
CAUTION:
1. Always barricade to keep pedestrians and vehicles from accessing the
storage tank area during preventive maintenance and/ or compliance testing
of the EMCO phase I EVR system.
2. If the underground storage tank is equipped with a ball float vent valve, make
sure it does not extend below the positive shut-off point of the A1100EVR
overfill prevention valve. If so, the ball float valve must be removed to allow
proper operation of the A1100EVR overfill prevention valve.
3. Never disconnect the delivery elbow from the fill adapter when the
A1100EVR overfill prevention valve has reached the positive shut-off point of
95% total capacity. Note the tank delivery hose is full and must not be dis-
connected until enough fuel has been evacuated from the underground stor-
age tank. This will allow the tank delivery hose to drain, and to safely discon-
nect from the fill adapter. Premature disconnection will result in a hazardous
spill and/or a potential for personal injury and property damage.
4. Once the A1100EVR overfill prevention valve is completely assembled, the
Seals-All Sealant must cure for a minimum of 24 hours before installing
into the underground storage tank.
• 13/64” Drill Bit • Hacksaw w/ fine tooth • Pipe Thread Sealant Compound
• Rivet Gun • Hand file w/ fine blade • 150 Grit Size Emery Cloth
• Power Drill • Marker • De-burring Tool w/ #10 Blade
• Tape Measure • Hammer • Fabric Strap Wrench (2)
• EMCO Drill Fixture p/n 566675
Service Tool Required:
Model #
Table of contents
Other Emco Control Unit manuals
Popular Control Unit manuals by other brands

Bardiani
Bardiani BBZS5 Operating and maintenance instructions

ABB
ABB Relion REC670 Applications manual

Eaton
Eaton XMCSPAN-001 Installation and use manual

Megmeet
Megmeet MC5000 Series User quick reference manual

Tash
Tash SICARE Pilot user manual

Franke
Franke Expansion module I/O Installation and operating instructions