
3005831-2019-04-01.fm
2/64
1. Introduction
1.1 Use ........................................................................................................................6
1.2 Unit configurations.............................................................................................. 6
2. Handling and transport
2.1 Transport and delivery ........................................................................................ 7
2.1.1 Once the VEX has arrived at the assembly site ........................................... 7
2.1.2 Extent of the delivery .................................................................................... 7
2.1.3 Weight .......................................................................................................... 8
2.1.4 Handling the air handling unit ....................................................................... 8
2.2 Storage.................................................................................................................. 9
3. Mechanical assembly
3.1 Setting up and assembling ............................................................................... 10
3.1.1 Installation site requirements ...................................................................... 10
3.1.2 Setting up the base .................................................................................... 11
3.1.3 Positioning and assembly of sections ........................................................ 11
3.2 Fitting roof (outdoor air handling units) .......................................................... 14
3.2.1 Preparation ................................................................................................. 14
3.2.2 Fitting of roof .............................................................................................. 15
3.2.3 Baffel plate .................................................................................................. 17
3.2.4 Air diffuser ................................................................................................... 17
3.3 Fans..................................................................................................................... 18
3.3.1 Transport safety fitting ................................................................................ 18
3.4 Handles on doors............................................................................................... 20
3.5 Duct connections............................................................................................... 20
3.5.1 Flexible connections.................................................................................... 20
3.5.2 ZerAx® fans ................................................................................................ 20
3.6 Filter monitor (optional) .................................................................................... 21
3.6.1 Filling with liquid ......................................................................................... 21
3.7 Damper................................................................................................................ 21
3.8 Rotary heat exchanger ...................................................................................... 22
3.8.1 Check ......................................................................................................... 22
3.9 LonWorks®......................................................................................................... 22
4. Pipe system
4.0.1 Circuit for heating coil ................................................................................. 24
4.0.2 Circuit for cooling coil ................................................................................. 24
4.0.3 Circuit for liquid coupled heat exchanger ................................................... 24
4.1 Condensation outlet .......................................................................................... 25
4.1.1 Establishment of condensation outlet ......................................................... 25
4.1.2 Water trap.................................................................................................... 25
5. Electrical installation
5.1 Dimensioning and electrical installation ......................................................... 26
5.2 Supply voltage ................................................................................................... 26
5.3 Running of cable through panels..................................................................... 27
5.4 Motor connection............................................................................................... 27
5.5 Connections in the control system box (EXcon control system) ................. 27