Flow HyPlex Prime Minor User manual

SB-0258 Rev A Status: PRODUCTION 1 of 9
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
SB-0258
Installing the HyPlex®Prime
Minor Maintenance Kit
Introduction
Use the procedure in this service bulletin when installing the Minor Maintenance Kit on your HyPlex
Prime pump. The complete minor maintenance kit schedule is listed in your Flow service manual.
Tools
You will need the following tools:
Pressure loading tool (049512-1)
Combination wrenches (14–32 mm)
½ in. drive socket set (14–32 mm)
½ in. torque wrench (10–200 ft-lb)
Note: you may need two wrenches
Pry bar set
Screwdriver set
Snap-ring pliers
0–1 in. micrometer or dial calipers
Repair kit
Minor maintenance kit, 050624-1
CAUTION
Failure to follow these step-by-step instructions and the procedures in your
equipment manual could result in premature failure or equipment damage.
Note: All components should be clean and free of debris prior to assembly. A clean work area is
important while working on the equipment.

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 2 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
Parts identification
Disassembly
1. Push in the E-stop.
WARNING
Place the main electrical disconnect OFF and bleed down all high-pressure lines.
Place an "Out of Service" tag on the main electrical disconnect and lock it out.
Failure to do so may result in equipment damage or injury to personnel.
2. Disconnect all high-pressure and low-pressure interface connections to access the tie
rods. Place the manifold and PCV assembly combination aside.
Unload the tie rods with the pressure loading tool
3. Make sure the pressure loading tool plunger is fully retracted. Install the pressure
loading tool onto the tie rods by running the tool studs onto the exposed threads of the
tie rods.
When tightening, alternate between opposite studs to avoid binding. Tighten the tool
studs firmly in order to seat the tool piston fully into the tool body, and against the
end cap as shown below.
Notes:
The plunger of the pressure loading tool must be threaded all the way out in
order to fully seat the piston within the cylinder.
When engaged on the tie rods, there should be no exposure of the piston shoulder.

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 3 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
4. Back out the four tool
studs 1/4 turn. This will
aid in easy removal of
the loading tool after
unloading is complete.
5. Use the 19 mm (3/4 in.)
socket and ratchet to
rotate the tool plunger
counter-clockwise until
a value of 1500 bar
gauge pressure is
reached.
6. Loosen the four primary hex nuts
two full turns. Use the 24 mm
(15/16 in.) combination wrench if
needed.
7. Use the 19 mm socket and ratchet
to rotate the tool plunger counter-
clockwise until the gauge
pressure reads 0 bar. Rotate the
tool plunger until it is fully
retracted.
8. Back out all four of the tool studs
to remove the tool from the tie
rods.
Note: Alternate between opposite studs to avoid binding. Use the 22 mm (7/8 in.)
combination wrench if needed.
9. Repeat steps 3 through 8 for the remaining positions
For each of the three high-pressure cylinders
10. Remove the end cap, high-pressure cylinder, inlet poppet, springs, filler tube, and sleeve. Discard
the inlet poppet and spring. Remove and discard the o-ring from the high-pressure cylinder.
11. If the dynamic seal carrier does not separate from the high-pressure cylinder, clamp the dynamic
seal carrier into a soft-jawed vise and gently work the cylinder from side to side until they separate.
12. Slide the dynamic seal carrier off the plunger if it did not come out with the high-pressure cylinder.
Remove and discard the dynamic seal and rod seal.
CAUTION
Use care when removing the dynamic seal and rod seal.
Do not scratch or nick the seal carrier bores.
13. Remove the subplate adapter. If necessary, use pry bars or screwdrivers to remove the adapter.
Remove the snap ring from the subplate adapter using snap ring pliers. Remove the spacer and seal.
Remove the o-rings on the outer diameter. Discard the seal, o-rings, and snap ring. Keep the spacer
for reuse.

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 4 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
14. Place the end cap vertically on a work bench with the check valve end up.
15. Remove the check valve assembly from the end caps by using two pry bars in the circumferential
groove in the OD of the check valve body. Take care not to damage the body or end cap.
16. Place the check valve body in the rebuild clamp and loosen the outlet cage.
17. Remove the outlet poppet, outlet poppet spring, outlet poppet guide, and outlet poppet seat. Discard
the poppet, seat, guide, and spring.
Lap inlet face of check valve body
18. Use the glass lapping plate from the tool kit and lapping paper from the repair kit.
19. Lightly wet the paper with water. Place the check valve body with the inlet face against the lapping
paper. With a light downward pressure, lap the body in a figure 8 pattern.
CAUTION
Be very careful not to rock the check valve body while
lapping the surface –flatness is very critical.
After 10-12 laps, rotate the check valve body 45° and continue lapping until the surface has a
smooth matte finish free of any deep scratches or signs of deformation from the inlet poppet.
Re-wet the paper as needed.
20. Thoroughly clean the check valve body openings to remove particles from the lapping procedure.

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 5 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
Reassembly
Assemble the check valve
1. Insert the outlet poppet into the outlet poppet guide.
Note: Install poppet into the outlet poppet guide as shown, with the radiused back of the outlet
poppet going in first. The counterbore in the outlet poppet is visible after installation
2. Place the outlet poppet spring around the guide. The spring should be loose on the guide.
3. Place the assembly into the outlet cage along with the outlet poppet seat.
4. Hold the outlet cage assembly upright (threaded end of the outlet cage facing up) so that the
installed components will not fall out. Lightly apply Blue Lubricant to the threads of the outlet
cage.
5. Carefully thread the new check valve body onto the outlet cage assembly.
6. Secure the rebuild clamp in a vise.
7. Secure the check valve body in the rebuild clamp with the inlet face downward. Torque the outlet
cage to 30 ft-lb (41 N-m).
Repeat Steps 1-7 for the remaining check valves.

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 6 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
Assemble the end cap
1. Lightly lubricate the check valve o-ring and end
cap o-ring with o-ring lube. Install them into the
appropriate grooves on the check valve body and
end cap.
2. With the outlet cage facing the end cap, insert the
check valve body into the end cap.
Repeat for the remaining end caps.
Check plunger torque
1. Remove the subplate adapter.
2. Carefully slide the plunger nut tool (provided in the tool kit) over the plunger. With a torque
wrench and plunger nut tool, check plunger nut torque. Torque should be 20 ft-lb (27 N-m).
3. Rotate the sheave to fully extend the next plunger to be checked.
Repeat Steps 1-3 for the other plungers. When finished, wipe off dirt or grease from all three plungers.
Assemble the subplate adapter
1. Ensure the tie rods are firmly seated in the subplate.
Note: Hand tight is sufficient.
2. With the split face down, install the rod seal in the counterbore of the subplate adapter.
3. Place the spacer in the counterbore with the chamfered side down (toward the newly installed seal).
Secure with the snap ring.
4. Lubricate and install the two o-rings onto the adapter, and slide over the plunger until it engages the
counterbore of the subplate.
Repeat steps 1-3 for the remaining subplate adapters

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 7 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
Assemble and install the dynamic seal
carrier
1. Inspect the dynamic seal carrier for
cleanliness and erosion damage. Erosion
damage at the innermost corner will
cause seal life to be reduced. Make sure
the guide bearing is in good condition
(the presence of cracked or loose pieces
is reason for replacement).
Clean the dynamic seal carrier as
necessary. Replace the seal carrier if
necessary.
2. Install the rod seal as shown, with the v-
shape facing up, into the dynamic seal
carrier.
3. Install the dynamic seal into the inner diameter of the rod seal, making sure the dynamic seal is
fully seated against the dynamic seal carrier.
Note: Make sure the plungers are clean and free of any damage or scratches before installing the
dynamic seal carriers. The subplate adapter/seal carrier interface must be clean and free of debris.
4. Slide the dynamic seal carrier onto the plungers until seated against the register of the subplate
adapter.
Install the high-pressure cylinder
1. Lubricate the o-ring with o-ring lube and place it in the groove of the high-pressure cylinder.
2. Slide the high-pressure cylinder over the plunger assembly and seat it against the seal carrier.
Position the cylinders with weep holes facing downward.
Note: A small amount of force will be needed to seat the cylinder against the seal carrier.
Repeat for the remaining high-pressure cylinders.
Assemble the inlet poppet
1. Place the inlet poppet spring over the shouldered side of
the inlet poppet.
2. Apply pressure to the spring and rotate counterclockwise
until it snaps into place. Be sure the spring is firmly
attached.
Repeat for remaining inlet poppets.

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 8 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
Assemble the filler tube
The filler tube sleeve helps align the poppet with the check valve body and prevents pinching of the
poppet between the check valve and the filler tube during assembly.
1. Place the compression spring into the tapered end
of the filler tube.
2. Insert the filler tube, spring end first, into the
high-pressure cylinder, making sure to engage
the spring into the dynamic seal.
Repeat for remaining filler tubes.
3. Insert the inlet poppet assembly into the filler
tube, spring end first.
4. Partially install the filler tube sleeve so that it
surrounds the inlet poppet and spring.
Repeat for remaining filler tubes.
Install the end cap
CAUTION
It is important that you do not let the end cap spring back while
installing. If it does, the inlet poppet can be pinched, causing damage.
The split bearings must be completely seated in the end cap. Incorrect
installation will cause inappropriate loading of the high-pressure position.
1. Make sure all eight of the end cap split bearings
(bushings) are in position.
2. Align the end cap so it will slide over the tie rods, then
carefully slide the end cap back until the check valve
makes contact with the inlet poppet.
3. Continue to slide the end cap back until the high-pressure
cylinder engages the o-ring in the end cap and the check
valve seats against the high-pressure cylinder.
4. Temporarily install one of the hex nuts, hand tight, to
prevent the end cap from springing back.
Follow Steps 1-4 to install the other two end caps, then
continue with Step 5.
5. Apply anti-seize compound to both sides of the washers and to the tie rod threads.
6. Install washers and hex nuts hand tight.
7. Remove the temporarily installed hex nuts. Apply anti-seize to both sides of the washers and
threads, then reinstall the nuts.

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 9 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
Load the tie rods & manifold
1. Install the pressure loading tool onto the tie rods by running down the tool studs onto
the exposed threads of the tie rods.
When tightening, alternate between opposite studs to avoid binding. Tighten the tool
studs firmly in order to seat the tool piston fully into the tool body, and against the end
cap as shown below.
Notes:
The plunger of the
pressure loading tool
must be threaded all the
way out in order to
fully seat the piston
within the cylinder.
When engaged on the tie rods, there
should be no exposure of the piston
shoulder.
2. Use a socket wrench to turn the loading tool
plunger clockwise until the gauge reads
1500 bar.
3. Run the primary nuts of the pump down by hand until firmly seated against the end caps. These
nuts must be fully bottomed-out against the washers/end caps.
Note: Do not use wrenches when threading
the primary nuts down.
4. Use the socket wrench to remove pressure
from the tool. The gauge will read 0 bar
when pressure has been removed.
5. Back out all four of the tool studs to
remove the tool from the tie rods.
Note: When loosening, alternate between
opposite studs to avoid binding.
6. Repeat steps 1–5 for the remaining
positions.
7. Apply Blue Lubricant to each of the threads on the 3/8 in. high-pressure glands.
8. On each end of the tube, slide a gland on and thread a collar (A-2839) on the threaded ends of the
tube.
9. Repeat Steps 33–35 for the remaining two high-pressure tubes.
10. Insert one end of the tube into the high-pressure port on the manifold and loosely thread the glands.
Repeat for the other two high-pressure tubes.
11. Loosely thread the other end of each of the three tubes into the end cap ports.
12. Once in place, tighten all six gland nuts.
13. Reconnect all high-pressure and low-pressure interface connections.

Installing the HyPlex® Prime Minor Maintenance Kit
SB-0258 Rev A Status: PRODUCTION 10 of 10
2011 Flow International Corporation UNCONTROLLED COPY PRINTED 7/29/11
Complete the kit installation
1. Remove the drain plug or oil temperature sensor from the crankcase drain and completely drain the
oil.
2. Re-install the drain plug or oil temperature sensor and fill the crankcase with recommended oil
(refer to Chapter 1 of your service manual).
3. For HyPlex Prime Plus only:
Click on Advanced | FlowSense diagnostic in the menu bar on the Run Machine screen. You must
enter pump hours and kit installation information or the pump will not run.
4. Follow the start-up procedure in your service manual before returning the HyPlex Prime pump to
service.
This manual suits for next models
1
Table of contents
Other Flow Heat Pump Accessories manuals