manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Forest garden
  6. •
  7. Garden House
  8. •
  9. Forest garden OPR86 User manual

Forest garden OPR86 User manual

8’ x 6’ Overlap Reverse Apex
Shed
Fixing Pack (OPA68FP)
This fixing pack is used for several products.
There may be additional fixings.
Not to Scale
Important :
Assembly of this
shed requires a
minimum of two
adults. MUST PRE-DRILL
Issue 0115
FELT
B
OPR6PE
PLAIN END QTY 2
OPR8FP
FRONT PANEL
OPA8BP
PLAIN SIDE
236510708
ROOF BOARD QTY 2 FELT78BL QTY 1
CD E G
F
37282275PT
2275mm BATTEN QTY 4
A
OPR86 PARTS LIST
1
4
BRDFL46 FLOOR
QTY 2
SDRPT
DOOR QTY 1
37282365PT
2365mm BATTEN QTY 2
44161798PT
1798mm CORNER STRIP QTY 4
H J K
L
I
Top View
2A
C
Z’ bracket Qty 8
30mm Screw Qty 19
50mm Screw Qty 26
25mm Screw Qty 27
10mm Felt tacks Qty 100
Ridge Plate
30mm Nail Qty 82
PCWIN1
WINDOW
59121110PAII62PT
1110mm ANGLED BARGE BOARD QTY 4
20121695PT
20 x 1695mm STRIP QTY 1
M
84996
675mm PLASTIC STRIP QTY 4
N
Fix both of the floors together using 2x50mm
screws, screwing through the floor bearers
as shown.
Place the panels on top of the completed floor. Make sure that all the panels are
tight and flush before fixing them to each other using 3x50mm screws.
When the panels are secured to each other, make sure they are square and fix
them to the floor using 3x50mm screws for each panel. Make sure that the screws
are positioned so that they locate into the bearers underneath.
Fix the 20 x 1695mm strip to the side
of the door frame so that it is tight
with the cladding and flush with the
frame. Use 3 x 30mm screws.
3
Flush Hinge
Qty 2
Hasp &
Staple
D
ML
5
Place the corner strips so that they cover the joins between
the panels. Fix each in place using 3x30mm screws.
40mm Screw Qty 12
IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ
CAREFULLY
This building is pressure treated to ensure longevity of all
timber components and to protect against rot. This may leave
a colour difference on some parts that will even out as the
moisture content stabilises. This will not need additional
treatment.
- This product must be built on a solid level base.
- Please keep all plastic bags and small parts away from
children.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
Technical Helpline: 0333 7777 089 8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in anyway (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
25mm Security Screws
Screws Qty 12
REQUIRED TOOLS :
(NOT SUPPLIED)
POZI DRIVE
SCREWDRIVER TAPE MEASURE HAMMER
SHARP KNIFE
FLAT HEAD
SCREWDRIVER
SCISSORS
A
E
M
D
ML
H
Place the hinge against the inside of the door frame and position the large section
of the hinge so that it is flush with the inside of the framing as shown. Fix with
25mm screws.
Open the hinge and fix the smaller section to the door framing. Again make sure
that the hinge is flush and that the holes are positioned so that the 25mm screws
locate correctly into the batten.
FIN20010512PTR
QTY 2
8
9 11
7
Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
Fix the ridge plate from inside the shed so that it bridges the two battens at the
apex together. Fix using 2 x 25mm screws
10
Biocidal Product Regulation (EU 528/2012) Article 58 Information
This article contains timber treated with Celcure AC-500, incorporating biocidal products to give protection against wood destroying insects & wood rotting fungi.
Contains: Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.
Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.
Before fixing the Hasp to the door make sure that it is in line with the framing on the
reverse of the door and closes over the Staple. Fix this in place using 2 x 25mm screws.
Position the Staple opposite, again making sure that it is in line with the framing behind
and fix it in place using 3 x 25mm screws.
Nailing through the roof sheet (G) in to the battens. Position the battens as shown.
1.The 2365mm batten (I) should be flush on all sides.
2.Place a 2275mm batten (J) so that it is offset 45mm on either side and has a 15mm offset on
the long side.
3.Place another 2275mm batten (J) in between, again with a 45mm offset on both sides.
Fix each batten in place using 30mm nails spaced in 300mm intervals.
Lift the roof sections into place, making sure that they are in line with the apex and
the front and back panels of the shed.
Fix the roof in place using 30mm nails spaced in approximately 300mm intervals
(Make sure the nails locate into the framework of the side and end panels)
Unroll the felt and cut it into three equal lengths. Place a section on each eaves so that
there is a 50mm overhang on each edge as shown. Fix this to the roof using felt nails
spaced in 150mm intervals. Cut and fold the corners securing with a single felt nail for
each.
Place the remaining section as shown making sure that the it overlaps the others. Again
secure each sheet in place using felt nails spaced in 150mm intervals.
Place the barge boards against the ends of the building so that they are flush with
the overhang of the roof and in line with the top. Fix each in place using 3x40mm
screws.
Position the finial against each end of the shed so that they cover up the joins
where the barge boards meet. Secure each in place using 2 x 30mm screws.
Staple
Staple
Fix a Z’ bracket to
each end of the
2275mm battens
using a 25mm
screw for each.
B
J15mm Offset
I
G
J
45mm Offset
Maintenance.
Regularly check all fixings are secure and the roofing felt has no holes or tears.
Sand off any rough/sharp edges.
F
pencil line
Attention
Take care when
cutting and
trimming the roof
felt.
Attention
Take care when
cutting and
trimming the roof
felt.
K
H
Place the window from the outside so that the lip sits on the bottom board as shown.
Place the plastic strips around the window so that one side butts up against the cladding.
Fix the strips and the window in place using 2 x security screws for each strip and one for the
top of the window.
6
N
Lip
Board
Attention:
Take care when placing
the screws. These can
not be backed out.
Using scissors
(carefully) cut the
plastic strips to
size.
G

Other Forest garden Garden House manuals

Forest garden BASEMSFP User manual

Forest garden

Forest garden BASEMSFP User manual

Forest garden Overlap Apex Shed 7' x 5' User manual

Forest garden

Forest garden Overlap Apex Shed 7' x 5' User manual

Forest garden ODR64 User manual

Forest garden

Forest garden ODR64 User manual

Forest garden FRA46 User manual

Forest garden

Forest garden FRA46 User manual

Forest garden ODA46 User manual

Forest garden

Forest garden ODA46 User manual

Forest garden OPA77DD User manual

Forest garden

Forest garden OPA77DD User manual

Forest garden Kempsford 8 x 6 Summer User manual

Forest garden

Forest garden Kempsford 8 x 6 Summer User manual

Forest garden OPA68 User manual

Forest garden

Forest garden OPA68 User manual

Forest garden ODA810DD User manual

Forest garden

Forest garden ODA810DD User manual

Forest garden Overlap Apex Shed 6 x 4 User manual

Forest garden

Forest garden Overlap Apex Shed 6 x 4 User manual

Forest garden Oakley Summer House 8 x 6 User manual

Forest garden

Forest garden Oakley Summer House 8 x 6 User manual

Forest garden TPCS88 User manual

Forest garden

Forest garden TPCS88 User manual

Forest garden TPC88 User manual

Forest garden

Forest garden TPC88 User manual

Forest garden Overlap Apex Shed Operator's manual

Forest garden

Forest garden Overlap Apex Shed Operator's manual

Forest garden FGHFV2FP User manual

Forest garden

Forest garden FGHFV2FP User manual

Forest garden SDA68 User manual

Forest garden

Forest garden SDA68 User manual

Forest garden MODULAR PERGOLA User manual

Forest garden

Forest garden MODULAR PERGOLA User manual

Forest garden Burford BFBEPHD User manual

Forest garden

Forest garden Burford BFBEPHD User manual

Forest garden ODA68M User manual

Forest garden

Forest garden ODA68M User manual

Forest garden 8' x 6' Shiplap Apex Shed User manual

Forest garden

Forest garden 8' x 6' Shiplap Apex Shed User manual

Forest garden ODPLOSFP User manual

Forest garden

Forest garden ODPLOSFP User manual

Forest garden TALL GARDEN STORE User manual

Forest garden

Forest garden TALL GARDEN STORE User manual

Forest garden ODA64DDFP User manual

Forest garden

Forest garden ODA64DDFP User manual

Forest garden SUMMERHOUSE User manual

Forest garden

Forest garden SUMMERHOUSE User manual

Popular Garden House manuals by other brands

Durabilt Dura-Breeze installation instructions

Durabilt

Durabilt Dura-Breeze installation instructions

Cedarshed The 12 x 4 Bayside manual

Cedarshed

Cedarshed The 12 x 4 Bayside manual

GARDEN MASTER GM3830 Assembly instructions

GARDEN MASTER

GARDEN MASTER GM3830 Assembly instructions

HAMPTON BAY 5LGZ5677 Use and care guide

HAMPTON BAY

HAMPTON BAY 5LGZ5677 Use and care guide

Simply Log Cabins PA44-3030 installation manual

Simply Log Cabins

Simply Log Cabins PA44-3030 installation manual

telluria ELEGANTO 2724 PHL Assembly instructions

telluria

telluria ELEGANTO 2724 PHL Assembly instructions

Grosfillex ABRI DECO 7.5 Assembly instructions

Grosfillex

Grosfillex ABRI DECO 7.5 Assembly instructions

Palmako FRB28-2929 installation manual

Palmako

Palmako FRB28-2929 installation manual

Mercia Garden Products 04GREEN0606SD-V6 manual

Mercia Garden Products

Mercia Garden Products 04GREEN0606SD-V6 manual

LeisureSeason WPC090733 installation instructions

LeisureSeason

LeisureSeason WPC090733 installation instructions

Sunjoy AUGUSTA WICKER GAZEBO L-GZ1190PST Assembly instruction

Sunjoy

Sunjoy AUGUSTA WICKER GAZEBO L-GZ1190PST Assembly instruction

Palmako Lotta FRB34-2940 Assembly, installation and maintenance manual

Palmako

Palmako Lotta FRB34-2940 Assembly, installation and maintenance manual

Dunster House E10-1525SS-28 installation manual

Dunster House

Dunster House E10-1525SS-28 installation manual

G21 PAH 357 manual

G21

G21 PAH 357 manual

Gazebo penguin W1610 1/2 Assembly instructions

Gazebo penguin

Gazebo penguin W1610 1/2 Assembly instructions

Palmako ELU18-4555-2 instruction manual

Palmako

Palmako ELU18-4555-2 instruction manual

Décor et Jardin Abri Massif Assembly Notice

Décor et Jardin

Décor et Jardin Abri Massif Assembly Notice

Palram Silver line Assembly instructions

Palram

Palram Silver line Assembly instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.