
1 SYSTEM CONNECTION DIAGRAMS
1a TORQUE SETTING
Before powering up the installation check all connections are
TORQUED to 2.5Nm. Loose connections cause fires!
2 FLAG INDICATOR STATUS
•Please ensure the SPD flag indicator status is checked
regularly.
•Should the indicator change to RED the module should
be replaced ASAP to continue to provide surge
protection.
•The SPD is in parallel to the supply so in no way affects
the power to the final circuits if activated (RED).
3 SPD MODULE REPLACEMENT
•Before changing the SPD cartridge switch OFF supply.
•The 36mm module can be removed as shown below.
•Pull cartridge out of the holder firmly.
•When refitting module ensure it is pushed home firmly
and is keyed in the slots on the base.
•Once changed switch power to ON.
4 INSTALLATION IN A CONSUMER UNIT
TAIL CLAMP (ACCF) CANNOT BE USED WHEN SPDCUKITT1 IS
INSTALLED within a FuseBox consumer unit, unless an additional
mounting hole is drilled by the installer for the clamp to be fixed.
5 ENVIRONMENT
WASTE ELECTRICAL PRODUCTS SHOULD NOT BE DISPOSED OF IN
HOUSEHOLD WASTE. CONTACT YOUR RETAILER OR LOCAL
AUTHORITY FOR RECYCLING INFORMATION.
After installation and testing of this product it is essential
that the INSTRUCTION LEAFLET is available for reference.