GE Oil & Gas Masoneilan 73000 Series User manual

GE Data Classification: Public
GE Oil & Gas
73000 Series
Masoneilan* Sweep Angle Control Valves
Models XX-73471
Instruction Manual

2 | GE Oil & Gas © 2015 General Electric Company. All rights reserved.
THESE INSTRUCTIONS PROVIDE THE CUSTOMER/OPERATOR WITH IMPORTANT PROJECT-SPECIFIC
REFERENCE INFORMATION IN ADDITION TO THE CUSTOMER/OPERATOR’S NORMAL OPERATION
AND MAINTENANCE PROCEDURES. SINCE OPERATION AND MAINTENANCE PHILOSOPHIES VARY,
GE (GENERAL ELECTRIC COMPANY AND ITS SUBSIDIARIES AND AFFILIATES) DOES NOT ATTEMPT
TO DICTATE SPECIFIC PROCEDURES, BUT TO PROVIDE BASIC LIMITATIONS AND REQUIREMENTS
CREATED BY THE TYPE OF EQUIPMENT PROVIDED.
THESE INSTRUCTIONS ASSUME THAT OPERATORS ALREADY HAVE A GENERAL UNDERSTANDING
OF THE REQUIREMENTS FOR SAFE OPERATION OF MECHANICAL AND ELECTRICAL EQUIPMENT IN
POTENTIALLY HAZARDOUS ENVIRONMENTS. THEREFORE, THESE INSTRUCTIONS SHOULD BE
INTERPRETED AND APPLIED IN CONJUNCTION WITH THE SAFETY RULES AND REGULATIONS
APPLICABLE AT THE SITE AND THE PARTICULAR REQUIREMENTS FOR OPERATION OF OTHER
EQUIPMENT AT THE SITE.
THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT
NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN CONNECTION WITH
INSTALLATION, OPERATION OR MAINTENANCE. SHOULD FURTHER INFORMATION BE DESIRED OR
SHOULD PARTICULAR PROBLEMS ARISE WHICH ARE NOT COVERED SUFFICIENTLY FOR THE
CUSTOMER/OPERATOR'S PURPOSES THE MATTER SHOULD BE REFERRED TO GE.
THE RIGHTS, OBLIGATIONS AND LIABILITIES OF GE AND THE CUSTOMER/OPERATOR ARE STRICTLY
LIMITED TO THOSE EXPRESSLY PROVIDED IN THE CONTRACT RELATING TO THE SUPPLY OF THE
EQUIPMENT. NO ADDITIONAL REPRESENTATIONS OR WARRANTIES BY GE REGARDING THE
EQUIPMENT OR ITS USE ARE GIVEN OR IMPLIED BY THE ISSUE OF THESE INSTRUCTIONS.
THESE INSTRUCTIONS ARE FURNISHED TO THE CUSTOMER/OPERATOR SOLELY TO ASSIST IN THE
INSTALLATION, TESTING, OPERATION, AND/OR MAINTENANCE OF THE EQUIPMENT DESCRIBED.
THIS DOCUMENT SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN
APPROVAL OF GE.

© 2015 General Electric Company. All rights reserved. Masoneilan 73000 Series control valves Instruction Manual | 3
Table of Contents
About this Manual __________________________________________________ 4
1. Safety Information _______________________________________________ 5
2. Installation _____________________________________________________ 6
3. Maintenance____________________________________________________ 6
3.1. Disassembly ______________________________________________ 6
3.2. Polishing the Valve Seat _____________________________________ 7
3.3. Reassembly_______________________________________________ 7
3.4. Packing Box_______________________________________________ 8
4. Drawing and Parts References _____________________________________ 9

4 | GE Oil & Gas © 2015 General Electric Company. All rights reserved.
About this Manual
•The information contained in this manual is subject to change without prior notice.
•The information contained in this manual, in whole or part, shall not be transcribed or copied without
GE’s written permission.
•Please report any errors or questions about the information in this manual to your local supplier.
•These instructions are written specifically for the Masoneilan 73000 Series control valves, and do not
apply for other valves outside of this product line. As to the construction of the valve body, please refer
to the attached drawing. Regarding the actuator, side hand-wheel, etc, please refer to the respective
instructions.
Useful Life Period
The current estimated useful life period for the Masoneilan 73000 Series control valves is 25+ years. To
maximize the useful life of the product, it is essential to conduct annual inspections, routine maintenance
and ensure proper installation to avoid any unintended stresses on the product. The specific operating
conditions will also impact the useful life of the product. Consult the factory for guidance on specific
applications if required prior to installation.
Warranty
Items sold by General Electric are warranted to be free from defects in materials and workmanship for a
period of one year from the date of shipment provided said items are used according to GE recommended
usages. GE reserves the right to discontinue manufacture of any product or change product materials,
design or specifications without notice.
Note: Prior to installation
•The valve must be installed, put into service and maintained by qualified and competent
professionals who have undergone suitable training.
•All surrounding pipe lines must be thoroughly flushed to ensure all entrained debris has been
removed from the system.
•Under certain operating conditions, the use of damaged equipment could cause a degradation of the
performance of the system which may lead to personal injury or death.
•Changes to specifications, structure, and components used may not lead to the revision of this
manual unless such changes affect the function and performance of the product.

© 2015 General Electric Company. All rights reserved. Masoneilan 73000 Series control valves Instruction Manual | 5
1. Safety Information
Important - Please Read Before Installation
The 73000 Series control valves instructions contain DANGER, WARNING, and CAUTION labels, where
necessary, to alert you to safety related or other important information.Read the instructions carefully
before installing and maintaining your control valve. DANGER and WARNING hazards are related to
personal injury. CAUTION
hazards
involve equipment or property
damage.
Operation of damaged equipment
can, under certain operational conditions, result in degraded process system performance that can lead to
injury or death. Total compliance with all DANGER, WARNING, and CAUTION notices is required for safe
operation.
This is the safety alert symbol. It alerts you to potential personal injury hazards. Obey all safety messages that
follow this symbol to avoid possible injury or death.
Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.
Indicates a potentially hazardous situation which, if not avoided, could result in serious injury.
Indicates a potentially hazardous situation which, if not avoided, could result in minor or moderate injury.
When used without the safety alert, symbol indicates a potentially hazardous situation which, if not
avoided, could result in property damage.
Note: Indicates important facts and conditions.

6 | GE Oil & Gas © 2015 General Electric Company. All rights reserved.
2. Installation
Prior to installing the valve, clean the pipeline of all foreign matter such as dirt, spatters (welding chips), scale,
oil or grease. Install the valve in the pipeline so that the fluid flows in the direction indicated by the flow arrows
attached to the body, or the fluid flows from "IN" toward "OUT" marked at the connection point.
When securing the lower flange to the pipeline, press the seat ring against the body until it touches the flange
surface of the pipeline. The lower flange and the pipeline pinch the seat ring and the pipeline’s gasket which is
prepared in advance, and tighten the pipeline bolts rigidly.
If the valve is installed in a horizontal position, be sure to take the support from the yoke or other part of the
actuator.
In case of the extension type bonnet, do not apply insulation to the extended portion.
Provide the required air tubing for the signal pressure and air supply, and the electrical wiring to the
positioner. Make sure no air leaks from the air pipeline.
3. Maintenance
When the control valve needs to be disassembled for inspection, cleaning or polishing the valve seat, follow
the procedures described below.
It explains the following procedure as an example of the attached drawing (MNS-148001).
3.1. Disassembly
Shut off all air supplies, disconnect the tubing for the air supply and the positioner signal pressure, and
the air tubing from the volume tank.
To disassemble the valve, it must be removed from the piping. Bring a chain block over the valve to
remove it from the piping for disassembly and reinstall it after reassembly.
1) Run a strong rope through the actuator yoke and remove the valve retaining bolts from the piping
while slightly pulling the valve upward.
If the valve is installed in a horizontal position, also run a rope around the body so that no lopsided
force is exerted on the valve, when disconnecting the valve from the pipeline.
2) Seat ring (12) and gasket (11) can be taken apart, after the valve body is removed from the pipeline.
At this time, pay attention not to be damaged with the seat ring.
3) Remove the positioner linkage from the split clamp (18) which connects the piston rod (19) of actuator
and the plug (13) of the body side.
4) Loosen the nut (16) or bolt (26) of the split clamp (18) in order to remove the split clamp (18).
Take the record on the depth of insertion of the stem and the position of the split clamp so that they
can be reassembled to the same dimension.
5) Remove the seat ring (12) first from the bottom of the body. The actuator can also be removed by
loosening the drive nut (5) which connects the body (10) and the yoke (14). However, in case of the
stud and nut type connection that connects the yoke to the body by the stud (23) and nut (24), loosen
the nut (24) to remove the actuator from the body.
Remove the packing flange (3) and the packing follower (4), after loosening and removing the stud nut
(2) which have tightened the packing flange. In the case of keeping connecting the valve body and the
yoke, the packing flange can be passed through the space between the bottom end of the piston rod

© 2015 General Electric Company. All rights reserved. Masoneilan 73000 Series control valves Instruction Manual | 7
and the upper end of plug. If the space is narrow, it can be extended by pushing down the plug or
raising the piston rod by hand-wheel operation.
6) Dismantle the plug (13) from the bottom of the body (10).
Note: The disassembly is completed by dismantling the packings (6), packing spacer (8), lantern ring (9)
and guide bushing (7).
7) Inspect for any damages to each component parts.
Note: As the assembly procedure for packing box may vary with the type of valve, please refer to the
respective assembly drawings.
3.2. Polishing the Valve Seat
When the valve seat needs polishing, install the seat ring (12) and plug (13) from the bottom of the
body (10), attaching them tentatively to the body hand-tight, lightly press the plug (13) against the
seat side from the bottom of the body (10), hold the plug with a wrench applied to the wrench holder,
and polish the seating surface. Do not polish the seating surface too hard, otherwise it may be
damaged. When polishing the seating surface, apply a fine-grain, quality abrasive to it. Thoroughly
clean the seating surface prior to reinstallation.
3.3. Reassembly
Reassemble the valve according to the following procedure after having completed the necessary
maintenance.
Please note that new packings and gaskets should be prepared for re-assembly.
1) Clean all the gasket surfaces of the body and the seat ring.
2) Set the guide bushing (7) toward the packing box bottom of the body (10).
3) Insert the plug (13) from the bottom of the body (10). Set the seat ring without the gasket. Stand up
the body.
4) Install the packings (6), packing spacer (8), and lantern ring (9), leaded by the stem of plug (13) and yet
the amount of packings and the order of packings are specified by each valve. When installing the
packings which have the cut ends, they have to be staggered 120 degrees with respect to each
other.
5) Regarding the installation of the packing follower (4) and of packing flange (3), follow the reverse of
the disassembly procedure. Refer to the section 3-1 – point 5.
6) Mount the actuator on the body. At this time, follow the reverse of the disassembly procedure.
Refer to the section 3-1 - point 5.
7) Move down the piston until it stops whether by applying air pressure in the upper part of the actuator
piston or by hand-wheel operation.
8) Couple the piston rod (19) to the plug (13) with the split clamp (18). When coupling, confirm that the
threads of piston rod and plug are completely engaged with each split clamp. It will be useful that
you were marking before disassembling.
Lightly tighten the nut (16) or bolt (26) of split clamp at the position being completely engaged.
9) Raise the plug whether by applying air pressure to the piston bottom of the actuator or by hand-
wheel operation. At that time, the plug is kept away from the seating surface. And then rotate the
plug at a half turn counterclockwise in order to get completely the seating force. You can use the
record made at the time of disassembly to provide the seating clearance.

8 | GE Oil & Gas © 2015 General Electric Company. All rights reserved.
10) Tighten the nut (16) or bolt (26) of the split clamp.
11) Connect the linkage of positioner to the split clamp (18).
12) Install the body to the pipeline per installation procedures. Do not forget to install gasket between
the seat ring and the body at this time.
13) Reinstall all the air tubing and electric wiring. With the above, re-assembly is completed, but you
must confirm the valve function by checking the valve actuation, valve opening, etc. prior to start-up.
3.4. Packing box
Maintenance of the packing box is a routine work.
The sealing performance of packing is kept by compression of packing. Compression is obtained by
evenly tightening the packing flange stud nut (2) for the packing flange (3), but pay attention to that it
may disturb smooth actuation of valve when tightened too much. New packings are necessary when leak
does not stop even if complete compression made.

© 2015 General Electric Company. All rights reserved. Masoneilan 73000 Series control valves Instruction Manual | 9
4. Drawing and Parts References

10 | GE Oil & Gas © 2015 General Electric Company. All rights reserved.
Notes

11 | GE Oil & Gas © 2015 General Electric Company. All rights reserved.
Notes

DIRECT SALES OFFICE LOCATIONS
AUSTRALIA
Brisbane
Phone: +61-7-3001-4319
Fax: +61-7-3001-4399
Perth
Phone: +61-8-6595-7018
Fax: +61-8-6595-7299
Melbourne
Phone: +61-3-8807-6002
Fax: +61-3-8807-6577
BELGIUM
Phone: +32-2-344-0970
Fax: +32-2-344-1123
BRAZIL
Phone: +55-11-2146-3600
Fax: +55-11-2146-3610
CHINA
Phone: +86-10-5689-3600
Fax: +86-10-5689-3800
FRANCE
Courbevoie
Phone: +33-1-4904-9000
Fax: +33-1-4904-9010
GERMANY
Ratingen
Phone: +49-2102-108-0
Fax: +49-2102-108-111
INDIA
Mumbai
Phone: +91-22-8354790
Fax: +91-22-8354791
New Delhi
Phone: +91-11-2-6164175
Fax: +91-11-5-1659635
ITALY
Phone: +39-081-7892-111
Fax: +39-081-7892-208
JAPAN
Tokyo
Phone: +81-03-6871-9008
Fax: +81-03-6890-4620
KOREA
Phone: +82-2-2274-0748
Fax: +82-2-2274-0794
MALAYSIA
Phone: +60-3-2161-03228
Fax: +60-3-2163-6312
MEXICO
Phone: +52-55-3640-5060
THE NETHERLANDS
Phone: +31-15-3808666
Fax: +31-18-1641438
RUSSIA
Veliky Novgorod
Phone: +7-8162-55-7898
Fax: +7-8162-55-7921
Moscow
Phone: +7 495-585-1276
Fax: +7 495-585-1279
SAUDI ARABIA
Phone: +966-3-341-0278
Fax: +966-3-341-7624
SINGAPORE
Phone: +65-6861-6100
Fax: +65-6861-7172
SOUTH AFRICA
Phone: +27-11-452-1550
Fax: +27-11-452-6542
SOUTH & CENTRAL AMERICA
AND THE CARIBBEAN
Phone: +55-12-2134-1201
Fax: +55-12-2134-1238
SPAIN
Phone: +34-93-652-6430
Fax: +34-93-652-6444
UNITED ARAB EMIRATES
Phone: +971-4-8991-777
Fax: +971-4-8991-778
UNITED KINGDOM
Bracknell
Phone: +44-1344-460-500
Fax: +44-1344-460-537
Skelmersdale
Phone: +44-1695-526-00
Fax: +44-1695-526-01
UNITED STATES
Avon, Massachusetts
Phone: +1-508-586-4600
Fax: +1-508-427-8971
Corpus Christi, Texas
Phone: +1-361-881-8182
Fax: +1-361-881-8246
Deer Park, Texas
Phone: +1-281-884-1000
Fax: +1-281-884-1010
Houston, Texas
Phone: +1-281-671-1640
Fax: +1-281-671-1735
Visit us on line:
www.geoilandgas.com/valves
*Denotes a registered trademark of the General Electric Company.
Other company names
and
pr
oduct
names
used
in this
document
are the register
ed
trademarks or trademarks of their respective owners.
© 2015 General Electric Company. All rights reserved.
GEA32034 08/2015
(formerly JEH1455E)
This manual suits for next models
1
Table of contents
Other GE Oil & Gas Control Unit manuals
Popular Control Unit manuals by other brands

Teleco
Teleco TVPLA868CC2 manual

M-system
M-system R3Y-SV8 instruction manual

Huawei
Huawei MU509 Series AT Command Interface Specification

Keysight Technologies
Keysight Technologies E8257DS Series user guide

Inficon
Inficon BM1000 Series operating instructions

Syntron Material Handling
Syntron Material Handling Conductor 420 Service instructions