Page 3 / 4
Interface Module:
Installation instructions:
1. Fixed equipment: fix the side ears on both sides of the front end of the equipment on the
equipment rack.
2. Use with the host: connect the host to the equipment with soft jumper (SMA-j interface),
which can supply power directly from BBU, with priority to 1 ~ 8 ports.
3. Connect the antenna directly: connect the antenna directly to two input ports and connect
more than two BBUs to ensure power supply to the antenna.
4. Detect the output port signal: use the signal detector to detect the signal state of each output
port.
5. Connect equipment and BBU equipment: connect the equipment output port with BBU
equipment with soft jumper (SMA-j interface), and tighten the connector. The idle interface of
the equipment does not need to connect the load, and it can be dustproof with a dust cap.
6. Debugging the equipment: first connect the output port of the host to the input port of the
slave, and then connect the BBU to the output port of the slave. The indicator light on the port
is on, which means that the equipment has started to work normally.
7. When the equipment interface is modified, the equipment will generate dry contact alarm.
Press the reset key to restore the equipment to normal working state; If any input port fails,
press the reset key to eliminate the alarm. Only when all input ports fail, the dry contact alarm
will not be eliminated. At this time, the alarm can be eliminated as long as any input port is
normal.
8 output ports and
BBU indicators
Dual input port for
connecting host or
antenna