
4 / 12GIOVENZANA INTERNATIONAL B.V. - MT-GSL-EN / 21.05.2021 - Rev. 3
INSTALLATION
Preliminary operations
• Measure the installation and mark the anchor points.
We recommend 1.5 metres between anchor points
for vertical sections and 0.5 metres for horizontal
sections.
• The area must be free of dust and dirt for adequate
adhesion. Clean only with a dry or slightly damp cloth.
DO NOT use any acid or alkaline liquids, cleaning
agents, or solvents.
• Select all the accessories and components needed to
complete the installation.
• Cut the strips using a sharp tool only on the areas
indicated.
General considerations Strips connection
Power connections
• DO NOT MODIFY, deform or cut the strips or any of
the components provided by Giovenzana. Giovenzana
AC strips are designed to work directly plugged into
an AC source. No power supply unit is needed. To
avoid any malfunctions of the system, and to protect
against electrical shock, fire, or physical injury, please
observe the following: This system has been designed
to work at 240VAC. Connection to a line voltage other
than that may create a safety and fire hazard and may
damage the system. If you are unsure of the type of
power supply, consult your local power company or a
qualified service technician.
• TO AVOID ELECTRICAL SHOCK and/or damage to
the system, do not handle the components with
wet hands. Always make sure the LED Cable strip is
disconnected from the power source before cutting,
connecting, mounting, or modifying in any way.
• DO NOT OPERATE with the LED strip tightly coiled.
Do not puncture, cut, shorten, or splice the LED cable
strip (except where marked). For outdoor use, make
sure that all connections and the end cap in the last
segment are tightly secured to preclude the entry of
water.
• DO NOT LOOK directly into the LEDs when lit. They are
powerful and could damage your vision.
• ONLY AUTHORIZED PERSONNEL must handle and
install the strips. Follow national electric codes and
regulations during installation.
ATTENTION
For safety reasons, switch off mains power before
connecting the strip to the power source.
1
2
3
4
5
1Insert the end of the
strip inside the chosen
connector as indicated
below. The copper paths
must be positioned below
the screw holes.
2Screw the connector to
the strip.
3Apply sealant on top of
the screw heads and
insert the screw cap,
applying pressure.
4For safety reasons, the
end of the strip must be
covered with the silicone
end cap. Apply sealant
and insert the strip in the
cap.
5The power connector
must be screwed on as
previously indicated.
Apply sealant and insert
the silicone end cap
covering the connector
and the strip as shown
below.