GLASDON MANCHESTER BOLLARD INSTALLATION INSTRUCTIONS
Ensure that personnel carrying out this installation have the relevant qualifications/certificates.
Ensure that all relevant personnel read the points listed within this leaflet and that a copy is given to
staff involved with the installation and maintenance of this product.
Please refer to ‘The Manual Handling Operations Regulations 1992’.
Glasdon recommends that a full Health and Safety analysis is carried out prior to installation.
!
1
MANCHESTER BOLLARD-
EXTENDED BASE MODEL
KIT CONTENTS
EQUIPMENT REQUIRED
1- Bollard x1
2- Lock Cover Cap x1
3- Key x1
4- Anchor Pin x1
-Spade
-Tape Measure
-Spirit Level
-Concrete Mix (we suggest using a quick setting
concrete i.e. QC10 for all installations)
-Safety Equipment (hard hat, mask, goggles,
reective clothing, etc)
1
Please note that diagrams are not to scale
MANCHESTER BOLLARD C/W
LOCKFAST SOCKET
KIT CONTENTS
1- Bollard x1
2- Lock Cover Cap x1
3- Key x1
4- Anchor Pin x1
5- Lockfast Socket x1
OPTIONAL INSTALLATION/
BLANKING PLATE
3
2
4
5
See Page 3 for
Instructions
TM
2
MINIMUM HOLE DIMENSIONS
425mm
370mm
425mm
Diagram A Diagram B Diagram C
Diagram D Diagram E Diagram F
Diagram G Diagram H Diagram I
Installation Instructions for Glasdon Manchester™ Bollard & Lockfast™ Socket
Note: Take care to avoid buried
services when excavating the hole.
Excavate the hole to the above
dimensions and lay gravel or sand for
drainage. [If using an installation Lid
insert into socket now. See instructions
on page 3.]
Use a spirit level to ensure top of
socket is level and ush with ground.
Add/remove gravel as required.
To remove the Lock Cover Cap from
the bollard insert one end of the key
into the Cap as shown.
Using the other end of the key insert
into the key track and twist bollard
anticlockwise to remove from the
socket. Place bollard to one side.
Fill the hole with concrete. Ensure
concrete is ush with the top of the
socket.
Smooth the surface and allow concrete
to dry for at least 24 hours. (If not using
the installation lid ensure hazard is
marked.)
[If using an installation Lid remove from
socket now.] Insert the bollard into the
socket and twist 90 degrees clockwise to
lock. (The bollard should not be able to
turn without unlocking using the key.)
Replace Lock Cover Cap using the key
by screwing clockwise.
Unscew the Lock Cover Cap by turning
the key anticlockwise.
Position the socket into the hole.
-ensure the bollard will be orientated
correctly with regard to the
Retro-reective banding and the site
requirements (i.e. red reector faces
oncoming trac on the near-side and
white reector faces oncoming trac
on the o-side).
Logos to
show
direction of
traffic
Key Key
3
Installation Instructions for Extended Base Bollard
Check for buried services before starting
installation.
Prepare a hole 425mm x 425mm x 320mm
deep.
Place a small amount of gravel or sand in the
base of the prepared hole and position
bollard into the hole. Add/remove gravel as
required to help position the bollard at the
correct height.
-ensure the top of the bollard stem is level
with the ground.
-ensure the bollard is vertically level with the
use of a spirit level.
-ensure the bollard is orientated correctly
with regard to the Retro-reective banding
and the site requirements.(i.e. red reector
faces oncoming trac on the near-side and
white reector faces oncoming trac on the
o-side).
Once the bollard is positioned correctly pour
concrete into the prepared hole to ground
level.
Should block paving be required reduce the
height of concrete accordingly to allow the
paving to be sited at ground level.
Ensure the bollard remains vertical during the
concrete setting period.
1.
2.
3.
4.
5.
6.
Ground
Level
Layer of
Gravel
or Sand
Spirit
Level
425mm
425mm
320mm
Diagram L
Position the
plate onto
the socket as
shown.
Use the magnet
on the key to lift
and remove the
plate.
Insert and Remove Optional Blanking/Installation Plates
We recommend using the Temporary Plate during
installation to prevent concrete entering the socket or for a
short duration
We recommend using the Locking Plate at all times when the
bollard is not in the socket so as not to create a safety hazard.
Diagram J
Diagram K
Ensure recess
is free from
debris before
use
Position the
plate into
the socket as
shown.
Insert key into
recess in plate.
Turn key 45
degrees and lift
to remove plate
Diagram L
Diagram M
4
, GLASDON MANCHESTER BOLLARD AND LOCKFAST SOCKET ARE TRADEMARKS OR REGISTERED
TRADEMARKS OF GLASDON GROUP OR ITS SUBSIDIARIES IN THE U.K AND OTHER COUNTRIES
• A planned maintenance schedule or regular inspection is recommended, replacing
components as necessary.
• Replacement components are available direct from GLASDON.
• GLASDON cannot be held responsible for claims arising from incorrect installation,
unauthorised modifications or misuse of the product.
Issue 1 March 2011 Stock no. C000/0378
© Copyright 2011
Glasdon UK Ltd reserve the right to alter specifications without prior notice.
Glasdon U.K Limited
Preston New Road
BLACKPOOL
Lancashire FY4 4UL
Tel: 01253 600410
Fax: 01253 792558
email: [email protected]
web: www.glasdon.com
IMPORTANT NOTE: PLEASE ENSURE THAT ALL RELEVANT PERSONNEL READ THE POINTS LISTED WITHIN THIS LEAFLET AND
THAT A COPY IS GIVEN TO STAFF INVOLVED WITH THE INSTALLATION AND MAINTENANCE OF THIS PRODUCT.
SAFETY NOTE: PLEASE REFER TO ‘THE MANUAL HANDLING OPERATIONS REGULATIONS 1992’ DURING HANDLING.
-To Remove Bollard from Socket
Diagram M Diagram N Diagram O
Insert one end of the key into the
Lock Cover Cap as shown.
Using the other end of the key insert
into the key track and twist bollard
anticlockwise then lift out of socket.
Replace the Lock Cover Cap using the
key and screw clockwise until secure.
Unscew by turning the key
anticlockwise.
KeyKey
-To Insert Bollard into Socket
Operators Instructions for Lockfast Socketed Bollard
Lower the bollard into the socket with
the lock facing away from the road (see
Diagram P).
Twist the bollard 90 degrees clockwise to
lock into socket.
-ensure the bollard is orientated
correctly with regard to the
Retro-reective banding and the site
requirements (i.e. red reector faces
oncoming trac on the near-side and
white reector faces oncoming trac on
the o-side).
The bollard should now not be able to
turn without unlocking using the key.
Ensure Lock Cover Cap is in place (if not
screw into place using the key as shown
in Diagrams A and B).
1.
2.
3.
Diagram P Diagram Q
TM

Popular Control System manuals by other brands

ZCS CONNEXT user manual

ZCS

ZCS CONNEXT user manual

Seav LRX 2035 Compact manual

Seav

Seav LRX 2035 Compact manual

Ruida Technology RDC6432G user manual

Ruida Technology

Ruida Technology RDC6432G user manual

Carlin 48245 manual

Carlin

Carlin 48245 manual

Pentair Hypro ProStop-E Quad 4216N-3404VPSQ Installation and operation manual

Pentair

Pentair Hypro ProStop-E Quad 4216N-3404VPSQ Installation and operation manual

Bosch Rexroth NYCe 4000 instruction manual

Bosch

Bosch Rexroth NYCe 4000 instruction manual

VRinsight ProPit user manual

VRinsight

VRinsight ProPit user manual

HEIDENHAIN POSITIP 880 installation instructions

HEIDENHAIN

HEIDENHAIN POSITIP 880 installation instructions

Siemens SIMATIC PCS 7 BOX manual

Siemens

Siemens SIMATIC PCS 7 BOX manual

SOMFY SITUO RTS installation guide

SOMFY

SOMFY SITUO RTS installation guide

Emerson PACSystems RSTi-EP user manual

Emerson

Emerson PACSystems RSTi-EP user manual

Danfoss m2 instructions

Danfoss

Danfoss m2 instructions

Chamberlain CAPXL installation manual

Chamberlain

Chamberlain CAPXL installation manual

Wilo SiFresh Installation and operating instructions

Wilo

Wilo SiFresh Installation and operating instructions

Altronic DE-4000 Installation and operation manual

Altronic

Altronic DE-4000 Installation and operation manual

Certified Cirus Control Systems Single Channel Motor Control Operation manual

Certified Cirus Control Systems

Certified Cirus Control Systems Single Channel Motor Control Operation manual

Badger Meter MDS 2000 user manual

Badger Meter

Badger Meter MDS 2000 user manual

Bosch Rexroth IndraMotion MTX micro Commissioning manual

Bosch

Bosch Rexroth IndraMotion MTX micro Commissioning manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.