
Caterpillar Tunnel Kit
16’ x 48’ Assembly Instructions
Step #1
• Assemble swaged arch to non-swaged arch
• Have two tech screws ready, to tie the arches together
• Measure the arch length to 16”
• Drill the tech screws into the swaged connection.
*While it’s not essential, drilling a pilot hole will help the
tech screw go in straight. This pre-drilling will ensure
easier entry and the thread isn’t damaged.
Step #2
• Layout the 16’x 48’ area to place your tunnel
• Ground posts should be in a row 4’ apart
• Each row of posts should be 16’apart to connect hoops
• Drive the ground posts to ground-level mark
(keep the crossbar slightly above ground for later rope installation)
(continue on next page)
Tech Screw
Ground Level
Swaged
Arch
Swaged
Arch
Ground Post