GSi PNEG-1057 Installation and operating instructions

PNEG-1057
8" and 10" Commercial Vertical
Bin Unload Auger
Assembly and Operation Manual
PNEG-1057
Version: 3.1
Date: 07-20-16

2 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
Personnel operating or working around this equipment should read this manual. This manual
must be delivered with equipment to its owner. Failure to read this manual and its safety
instructions is a misuse of the equipment. Any misuse of the equipment may void the warranty.

Table of Contents
PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 3
Contents
Chapter 1 Introduction ..........................................................................................................................................4
General Information .............................................................................................................................. 4
Capacity ................................................................................................................................................ 4
Chapter 2 Safety .....................................................................................................................................................5
Safety Guidelines .................................................................................................................................. 5
Cautionary Symbols Definitions ............................................................................................................ 6
Safety Cautions ..................................................................................................................................... 7
Safety Sign-Off Sheet ......................................................................................................................... 10
Chapter 3 Safety Decals ......................................................................................................................................11
Chapter 4 8" Vertical Assembly Instructions ....................................................................................................14
Motor Mount Rod to Head Plate Assembly ......................................................................................... 14
Tube Assembly ................................................................................................................................... 14
Attaching Vertical Section to Bin ......................................................................................................... 16
Attaching Motor Mount to Horizontal Section ...................................................................................... 18
Chapter 5 10" Vertical Assembly Instructions ..................................................................................................20
Motor Mount Rod to Head Plate Assembly ......................................................................................... 20
Tube Assembly ................................................................................................................................... 20
Attaching Vertical Section to Bin ......................................................................................................... 22
Attaching Horizontal Motor Mount (Direct Belt Drive) ......................................................................... 24
Chapter 6 Start-Up ...............................................................................................................................................26
Start-Up and Break-In ......................................................................................................................... 26
Chapter 7 Operation and Maintenance ..............................................................................................................27
8" Vertical Commercial Bin Unloading Auger Operating Instructions .................................................. 27
10" Vertical Commercial Bin Unloading Auger Operating Instructions ................................................ 28
Power Source ...................................................................................................................................... 29
Maintenance ........................................................................................................................................ 29
Chapter 8 Shut Down ...........................................................................................................................................30
Normal Shut Down .............................................................................................................................. 30
Emergency Shut Down ....................................................................................................................... 30
Lock Out .............................................................................................................................................. 30
Storage Preparation ............................................................................................................................ 30
Chapter 9 Troubleshooting .................................................................................................................................31
Chapter 10 Parts List ...........................................................................................................................................33
8" Commercial Vertical Bin Unload Auger Parts ................................................................................ 34
10" Commercial Vertical Bin Unload Auger Parts .............................................................................. 36
Chapter 11 Warranty ............................................................................................................................................38

4 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
1. Introduction
General Information
1. We reserve the right to improve our product whenever possible and practical to do so. We reserve
the right to change, improve and modify products at any time without obligation to make changes,
improvements and modifications on equipment sold previously.
2. The 8" and 10" Commercial Vertical Bin Unload Augers have been designed and manufactured to
give years of dependable service. The care and maintenance of this machine will affect the
satisfaction and service obtained. By observing the instructions and suggestions we have
recommended, the owner shouldreceive competent service for many years.If additional information
or assistance should be required, please contact the factory or the local dealer.
3. When receiving merchandise, it is important to check both the quantity of parts and their descriptions
with the packing list enclosed within each package. All claims for freight damage or shortage must
be made by the consignee within ten (10) days from the date of the occurrence of freight damage.
The consignee should accept the shipment after noting the damage or loss.
Capacity
1. The capacities may vary greatly under varying conditions. The following factors play a role in the
performance of the auger:
2. For example, a twenty-five percent (25%) moisture could cut capacity by as much as 40% under
some conditions.
• Speed • Amounts of foreign matter
• Angle of operation • Different materials
• Moisture content • Methods of feeding

PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 5
2. Safety
Safety Guidelines
Safety guidelines are general-to-specific safety rules that must be followed at all times. This manual is
written to help you understand safe operating procedures and problems that can be encountered by the
operator and other personnel when using this equipment. Save these safety guidelines for future
reference.
As owner or operator, you are responsible for understanding the requirements, hazards, and precautions
that exist and to inform others as required. Unqualified persons must stay out of the work area at all times.
Alterations must not be made to the equipment. Alterations can produce dangerous situations resulting in
SERIOUS INJURY or DEATH.
This equipment must be installed in accordance with the current installation codes and applicable
regulations,whichmust be carefullyfollowedinall cases.Authoritieshaving jurisdiction mustbeconsulted
before installations are made.
When necessary, you must consider the installation location relative to electrical, fuel and water utilities.
Personnel operating or working around equipment must read this manual. This manual must be delivered
with equipment to its owner. Failure to read this manual and its safety instructions is a misuse of the
equipment.
ST-0001-3

2. Safety
6 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
Cautionary Symbols Definitions
Cautionary symbols appear in this manual and on product decals. The symbols alert the user of potential
safety hazards, prohibited activities and mandatory actions. To help you recognize this information, we
use the symbols that are defined below.
NOTICE
DANGER
WARNING
CAUTION
This symbol indicates an imminently hazardous situation
which, if not avoided, will result in serious injury or death.
This symbol indicates a potentially hazardous situation
which, if not avoided, can result in serious injury or death.
This symbol indicates a potentially hazardous situation which,
if not avoided, can result in minor or moderate injury.
This symbol is used to address practices not related to
personal injury.
This symbol indicates a general hazard.
This symbol indicates a prohibited activity.
This symbol indicates a mandatory action.
ST-0005-2

2. Safety
PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 7
Safety Cautions
Use Personal Protective Equipment
Eye
Protection
Hearing
Protection
Hand
Protection
Head
Protection
Respiratory
Protection Foot
Protection
Fall
Protection
• Use appropriate personal protective equipment:
• Wear clothing appropriate to the job.
• Remove all jewelry.
• Tie long hair up and back.
ST-0004-1
Follow Safety Instructions
• Carefully read all safety messages in this manual and
safety signs on your machine. Keep signs in good
condition. Replace missing or damaged safety signs.
Be sure new equipment components and repair parts
include the current safety signs. Replacement safety
signs are available from the manufacturer.
• Learn how to operate the machine and how to use
controls properly. Do not let anyone operate without
instruction.
• If you do not understand any part of this manual or
need assistance, contact your dealer.
ST-0002-1

2. Safety
8 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
Maintain Equipment and Work Area
• Understand service procedures before doing work. Keep area
clean and dry.
• Never service equipment while it is operating. Keep hands, feet,
and clothing away from moving parts
• Keep your equipment in proper working condition. Replace worn
or broken parts immediately.
ST-0003-1
Operate Motor Properly
• All electrical connections must be made in accordance with
applicable local codes (National Electrical Code for the US,
Canadian Electric Code, or EN60204 along with applicable
European Directives for Europe). Make sure equipment and
bins are properly grounded.
• Lock-out power before resetting motor overloads.
• Do not repetitively stop and start the drive in order to free a plugged
condition. Jogging the drive in this manner can damage the
equipment and drive components.
ST-0009-3
Rotating Auger Hazard
• Keep clear of rotating augers and moving parts.
• Do not remove or modify guards or covers.
• Lock-out power source before making
adjustments, cleaning, or maintaining equipment.
• Failure to follow these precautions will result in
serious injury or death.
ST-0037-1
Stay Clear of Hoisted Equipment
• Always use proper lifting or hoisting equipment when assembling
or disassembling equipment.
• Do not walk or stand under hoisted equipment.
• Always use sturdy and stable supports when needed for
installation. Not following these safety precautions creates the
risk of falling equipment, which can crush personnel and cause
serious injury or death.
ST-0047-1

2. Safety
PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 9
Stay Clear of Rotating Parts
• Do not enter the bin while the equipment
is in operation.
• Entanglement in rotating augers will
cause serious injury or death.
• Keep all guards and covers in place at
all times.
• Lock-out power source before making
adjustments, cleaning, or maintaining
equipment.
ST-0008-2
Use Unload Equipment Properly
• Do not operate this equipment alone. Make sure someone nearby
is aware of the proper shut down sequence in the event of an
emergency.
• Do not allow any person intoxicated or under the influence of
drugs to operate this equipment. All operators must be adequately
rested and prepared to perform all functions of operating the
equipment.
• Do not start equipment until all persons are clear of the work area
and safety guards are in place.
• Do not allow anyone inside a bin, truck, or wagon which is being
unloaded by an auger. Flowing grain can trap and suffocate in
seconds.
• Use ample overhead lighting after sunset to light the work area.
• Always use caution to not hit the auger when positioning the load.
• Do not leave equipment operating while unattended.
• Be aware of pinch points, which can trap or catch objects and
cause injury.
• Be sure all equipment is locked in position before operating.
• Always lock out all power sources to the equipment when
unloading is finished.
ST-0051-1

2. Safety
10 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
Safety Sign-Off Sheet
Below is a sign-off sheet thatcan be used to verify that all personnel have read and understood the safety
instructions. This sign-off sheet is provided for your convenience and personal record keeping.
Date Employee Name Supervisor Name
ST-0007

PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 11
3. Safety Decals
Thefigure
below
showsthelocationofthedecals andsafetysigns whichshouldappear on theCommercial
Vertical Bin Unload Auger. Samples and explanations of these decals are shown
on Pages 12
and 13
.
NOTE: Please remember safety signs provide important safety information for people working near
bin unloading equipment that is in operation. Any safety signs that are worn, missing, illegible
or painted over should be replaced immediately. Obtain FREE replacements by contacting
your dealer.

3. Safety Decals
12 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
The safety decals Chart below lists all the safety decals that should be included with the auger. Inspect all
decals and replace any that are illegible, worn or missing. Contact the dealer or the manufacturer to order
replacement decals.
Ref # Part # Description Size Qty
1DC-1381 Danger - Shear Point (Auger) 4-1/2" x 2" 1
2 DC-995 Warning - Shear Point (Belt) 4-1/2" x 2" 1
3DC-1234 Caution 2-1/4" x 2-3/4" 1
4 DC-1379 Notice 5-1/8" x 7-3/8" 1
SHEAR POINT
Keep clear of rotating auger and
moving parts.
Do not remove or modify guards.
Disconnect and lock out power
before servicing.
Failure to do so will result in
serious INJURY or DEATH.
DC-1381
GSI Group 217-226-4421
DANGER
DANGER
WARNING
SHEAR POINT
Keep hands clear of moving
parts. Do not operate with
guard removed. Disconnect
and lockout power before
servicing.
DC-995GSI Group Inc. 217-226-4421
NOTICENOTICE
DC-1379GSI Group Inc. 217-226-4421
1. Read and understand the operator’s manual and all
safety instructions.
2. Do not operate while under the influence of drugs
or alcohol.
3. Do not operate unless all safety equipment,
switches, guards, and shields are securely in place
and operational.
4. Allow only trained authorized personnel in the
operating area.
5. Any electrical wiring or service work must be per-
formed by a qualified electrician. It must meet all state
and local electrical codes.
6. Do not allow children in the area of operation.
7. Keep hands, feet, & clothing away from moving parts.
8. Disconnect and lockout power before making any
adjustments or performing any service work.
9. Disconnect power prior to resetting any motor overload.
10. Make certain all electric motors are grounded.
11. Replace all worn or damaged labels immediately.
1
2
3
4
GSI Group 217-226-4421
DC-1234
FAILURE TO PROPERLY SELECT,
INSTALL OR MAINTAIN AN AUGER, ITS
DRIVE OR OTHER COMPONENTS CAN
RESULT IN DANGEROUS OPERATION.
THIS EQUIPMENT IF IMPROPERLY
SELECTED, INSTALLED OR MAIN-
TAINED MAY FAIL AND COULD RESULT
IN SERIOUS INJURY OR PROPERTY
DAMAGE.
CHECK PRODUCT LITERATURE
AND EQUIPMENT MANUFACTURER’S
LITERATURE OR CALL THE FACTORY
FOR FURTHER INFORMATION.
NOTICENOTICE

3. Safety Decals
PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 13
A. DANGER Sign No. DC-1395 was supplied with the bin unloading equipment. This safetysign should
be applied to the side of the bin near the bin opening, so it will be viewed by people
entering into the bin storage building. Do not cover any safety signs or any other signs that are
already there.
B. If the safety sign location suggested is not in full view because of equipment modifications, other
equipment in the area or any reason, then locate the safety sign in a more suitable location.
C. Be certain the surface is clean, dry and free of dirt and oil. Peel paper backing from decals and stick
into place. The adhesive backing will bond on contact.
NOTE: Please remember, safety signs provide important safety information for people working near bin
unloading equipment that is in operation.
NOTE: If the Safety Sign cannot be easily read for any reason or has been painted over, replace it
immediately. Additional Safety Signs may be obtained free of charge from your dealer, distributor
or ordered from the factory.
Order SAFETY SIGN NO. DC-1395
DANGER
DANGER
ROTATING FLIGHTING
FAILURE TO DO SO WILL RESULT IN
SERIOUS INJURY OR DEATH.
This bin is equipped with grain augers
which can kill or dismember.
Keep clear of all augers and never enter
this bin unless all power is
disconnected and locked out.
DC-1395GSI Group Inc. 217-226-4421

14 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
4. 8" Vertical Assembly Instructions
Motor Mount Rod to Head Plate Assembly
1. Screw one 3/4" hex head nut to the top of each motor mount rod (G).
2. Slide the motor mount rods (G) through the head plate assembly (H).
3. Line up slot on the plate end of the motor mount rods (G) with the slot on the head plate assembly
(H). Fasten them together using 5/16" carriage bolt, a flat washer and a nut.
4. Attach a 3/4" hex head nut onto the bottom of each motor mount rod. Tighten until nut rests against
the head plate assembly (H).
5. Adjust top 3/4" hex head nuts down until they rests against the top of the head plate assembly (H).
Tube Assembly
1. Connect the 2 hole flange bearing (I) to head plate assembly (H) using two (2) 7/16" x 1-1/4" bolts
with lock nuts.
2. Loosen the top and bottom nuts on the head plate assembly (H) to allow the belt guard mounting
angles (M) to slide onto the motor mount rods (G). Once the angles are in place tighten nuts to keep
rods in position.
3. Connect head drive shaft (J) to flight using two (2) 7/16" x 2-1/4" (grade 5) bolts with lock nuts.
4. Slide head plate assembly (H) over discharge end of tube and tighten the half band clamps (C) using
four (4) 5/16" x 1-1/2" bolts with nuts. Slip bearing lock collar (not shown) over head drive stub.
5. Fasten belt guard (K) to top mounting angle (M) using two (2) 5/16" x 3/4" carriage bolts with
flat washers, lock washers and nuts.
NOTE: Leave carriage bolts loose until later.
6. Place head drive shaft (J) through head bearing with enough extended to mount pulley (L) with
key (N). Tighten lock collar on bearing and tighten set screws in pulley
7. Install motor and pulley onto motor mount. (Motor and pulley are not included.) Install belts (A) and
tighten by adjusting motor height by using the four (4) 3/4" nuts on the rods.
8. Close door on belt guard and latch.
9. Secure 45° discharge spout (D) over the discharge opening using the head plate assembly and
eight (8) 5/16" x 1-1/2" long bolts with nuts.

4. 8" Vertical Assembly Instructions
PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 15
Tube Assembly (Continued)
Figure 4A 8" Vertical Tube Assembly
Ref # Description Ref # Description
ABelt (57") HHead Plate Assembly
B Half Band I Flange Bearing
CHalf Band Clamp JHead Drive Shaft
D 45° Discharge Spout K Belt Guard
EMotor Mount Top Strap LMount Pulley
F Motor Mount Bottom Strap M Mounting Angle
GMotor Mount Rod NKey
Lock out all power sources while installing or maintaining equipment.
Keep all safety devices and shields in place at all times until power source is
locked out.

4. 8" Vertical Assembly Instructions
16 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
Attaching Vertical Section to Bin
1. Slide bin unloading flight into bin well and unloading tube (which should already be installed in bin.)
The unloading flight for larger bin sizes may need to be bolted together. Use bolts provided in
connecting stubs located at the end of the tail flights. See Chart below to determine the flight length
for the bin size.
2. Bolt unloading flight to short horizontal flight (Ref #B, on Page 19) using four (4) 7/16" x 2-3/4" long
(grade 5) bolts and lock nuts.
3. Bolt flange on horizontal tube of vertical unloader to the flange of the bin unloader tube with vertical
auger in vertical position. Use eight (8) 5/16" x 1" long bolts, lock washers and nuts.
8" Flight Chart
Product # Bin Diameter Part # Description
GFC82400 24' GK1799 14'-6" x 7" O.D. Flight
GFC82700 27' GK1800 16'-0" x 7" O.D. Flight
GFC83000 30' GK1801 17'-6" x 7" O.D. Flight
GFC83300 33'-34' GK1802 19'-6" x 7" O.D. Flight
GFC83600 36' GK1803 20'-6" x 7" O.D. Flight
GFC83800 37'-39' GK1804 22'-6" x 7" O.D. Flight
GFC84000 40' GK1805 23'-0" x 7" O.D. Flight
GFC84200 42' GK1806 24'-0" x 7" O.D. Flight
GFC84800 48'-49' GK1808
GK1807 20'-0" x 7" O.D. Flight (Head)
7'-0" x 7" O.D. Flight (Tail)
GFC85400 54'-55' GK1808
GK1809 20'-0" x 7" O.D. Flight (Head)
10'-0" x 7" O.D. Flight (Tail)
GFC86000 60' GK1808
GK1810 20'-0" x 7" O.D. Flight (Head)
13'-0" x 7" O.D. Flight (Tail)
GFC86300 63' GK1808
GK1811 20'-0" x 7" O.D. Flight (Head)
14'-6" x 7" O.D. Flight (Tail)
GFC86800 68'-69' GK1808
GK1812 20'-0" x 7" O.D. Flight (Head)
17'-0" x 7" O.D. Flight (Tail)
GFC87200 72' GK1808
GK1813 20'-0" x 7" O.D. Flight (Head)
19'-0" x 7" O.D. Flight (Tail)
GFC87500 75' GK1808
GK1814 20'-0" x 7" O.D. Flight (Head)
20'-6" x 7" O.D. Flight (Tail)
GFC87800 78' GK1808
GK1815 20'-0" x 7" O.D. Flight (Head)
22'-6" x 7" O.D. Flight (Tail)
GFC88000 80' GK1808
GK1130
GK1821
20'-0" x 7" O.D. Flight (Head)
20'-0" x 7" O.D. Flight (Middle)
4'-6" x 7" O.D. Flight (Tail)
GFC88200 82' GK1808
GK1130
GK1823
20'-0" x 7" O.D. Flight (Head)
20'-0" x 7" O.D. Flight (Middle)
5'-6" x 7" O.D. Flight (Tail)
GFC89000 90' GK1808
GK1130
GK1824
20'-0" x 7" O.D. Flight (Head)
20'-0" x 7" O.D. Flight (Middle)
9'-6" x 7" O.D. Flight (Tail)
GFC89200 92' GK1808
GK1130
GK1825
20'-0" x 7" O.D. Flight (Head)
20'-0" x 7" O.D. Flight (Middle)
10'-6" x 7" O.D. Flight (Tail)

4. 8" Vertical Assembly Instructions
PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 17
Attaching Vertical Section to Bin (Continued)
4. Adjust stand (Ref #Q, on Page 19) so it holds the weight of the vertical auger.
5. Attach the support brackets and half bands to the top half of the vertical tube by inserting the
5/16" U-bolt (D) through the support brackets (E) and half bands (F) and fasten together using
four (4) 5/16" nylon lock nuts.
6. Attach lower telescoping tube sections (C) to the ears on the support brackets (E) using two (2)
3/8" x 3/4" bolts with lock nuts.
7. Slide the upper telescoping tube sections (A) into the lower tube sections (C). Attach upper tubes to
the bin wall.
8. Secure the upper telescoping tubes to the lower telescoping tubes by tightening the square
head set screw (B).
Figure 4B
Ref # Description
AUpper Telescoping Tube
B Square Head Set Screw
CLower Tube
DU-Bolt
ESupport Bracket
F Half Band
GBin Wall

4. 8" Vertical Assembly Instructions
18 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
Attaching Motor Mount to Horizontal Section
1. First, connect the head stub shaft (D) to the short flight (B) using two (2) 7/16" x 2-3/4" (grade 5) bolts
with lock nuts.
2. Connect the 4-hole flange bearing with lock collar (C) and the head plate (O) together using four (4)
7/16" x 1-1/4" bolts with lock nuts.
3. Attach the head plate (O) to the tube flange using eight (8) 5/16" x 1" bolts with flat washers,
lock washers and nuts.
4. Connect side plates (I and J) to head plate (O) using four (4) 1/2" x 1" bolts with lock washers and
nuts. Also, at the same time attach the top and bottom belt guard brackets (N) using the same bolts.
5.Spina3/4" nut on thethreaded rods ofeachstrapandrodassembly(K). Insert threaded rodsthrough
holes in side plates (I and J) and add four (4) more 3/4" nuts. Leave only finger tight until later.
6. Place rods (M) in strap and rodassemblies (K) and secure with top straps (L) using 3/8" x 1-1/2" bolts
with two (2) flat washers and one nut on each bolt.
7. Position motor mount straps (F) and clips (E) and secure to rod (M) using four (4) 3/8" x 3" long
carriage bolts with nuts. Leave only finger tight until motor is installed and adjusted.
8. Attach belt guard (G) to belt guard mounting angles (N) using four (4) 5/16" x 3/4" carriage bolts with
flat washers and nuts.
9. Slide bearing lock collar (C) over head stub shaft (D). Leave enough stub exposed to mount
pulley (H) on stub with drive key (P). Tighten bearing lock collar next to bearing and tighten
set screws in pulley.
10. Install pulley on head stub shaft and mount motor on strap (F). (Motor and pulley not furnished.)
Install belts (A) and align pulleys. Tighten motor to straps (F). Adjust motors along the tube and
tighten with 3/8" x 3" carriage bolts.
11. After everything has been adjusted correctly, go back and tighten all nuts and bolts.

4. 8" Vertical Assembly Instructions
PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger 19
Attaching Motor Mount to Horizontal Section (Continued)
Figure 4C
Ref # Description Ref # Description
ABelt (71") I and J Side Plates
B Short Flight K Rod Assembly
CLock Collar LTop Straps
D Head Stub Shaft M Rod
EClips NBelt Guard Mounting Angle
F Motor Mount Straps O Head Plate
GBelt Guard PDrive Key
H Mount Pulley Q Stand

20 PNEG-1057 8" and 10" Commercial Vertical Bin Unload Auger
5. 10" Vertical Assembly Instructions
Motor Mount Rod to Head Plate Assembly
1. Screw one 7/8" hex head nut to the top of each motor mount rod (E).
2. Slide the motor mount rods through the head plate assembly.
3. Line up slot on the plate end of the motor mount rods (E) with the slot on the head plate assembly
(C). Fasten them together using 3/8" carriage bolt, a split flat washer and a nut.
4. Attach a 7/8" hex head nut onto the bottom of each motor mount rod. Tighten until nut rests against
the head plate assembly (C).
5. Adjust top 7/8" hex head nuts down until they rests against the top of the head plate assembly (C).
Tube Assembly
1. Connect the 4-hole flange bearing (H) to head plate assembly (C) using four (4) 1/2" x 1-1/2" bolts
with lock nuts.
2. Loosen the top and bottom nuts on the head plate assembly (C) to allow the belt guard mounting
angles (I) to slide onto the motor mount rods (E). Once the angles are in place tighten nuts to keep
rods in position.
3. Connect head drive stub shaft (J) to flight using two (2) 1/2" x 3-1/2" (grade 5) bolts with lock nuts.
4. Slide head plate assembly (C) over discharge end of tube and tighten the half band clamps (D) using
four (4) 5/16" x 1-3/4" bolts with nuts. Slip bearing lock collar (not shown) over head drive stub.
5. Fasten belt guard (L) to top mounting angle (I) using two (2) 5/16" x 3/4" carriage bolts with
flat washers, lock washers and nuts.
NOTE: Leave carriage bolts loose until later.
6. Place head drive stub shaft (J) through head bearing with enough extended to mount pulley (K) with
key (B). Tighten bearing with lock collar and tighten set screws in pulley.
7. Install motor and pulley onto motor mount. (Motor andpulley are not included.) Install belts (A) and
tighten by adjusting motor height by using the four (4) 3/4" nuts on the rods.
8. Close door on belt guard and latch.
9. Secure 45° discharge spout (M) Over the discharge opening using the head plate assembly and
eight (8) 5/16" x 1-1/2" long bolts with nuts.
10. After everything has been adjusted, go back and tighten all nuts and bolts.
Table of contents
Other GSi Tools manuals
Popular Tools manuals by other brands

Engineering and Research Corporation
Engineering and Research Corporation Ercoupe 415-C Pilot operating handbook

Macnaught
Macnaught Retracta R3 owner's manual

ABB
ABB H-CK 240 operating instructions

Sealey
Sealey VS0042 quick start guide

MSW Motor Technics
MSW Motor Technics MSW-DA-20 user manual

BGS technic
BGS technic 8457 instruction manual