Hitachi RET670 Quick start guide

Relion® 670 SERIES
Transformer protection RET670
Version 2.2 IEC
Commissioning manual


Document ID: 1MRK 504 165-UEN
Issued: July 2022
Revision: K
Product version: 2.2
© 2017 - 2022 Hitachi Energy. All rights reserved

Copyright
This document and parts thereof must not be reproduced or copied without written permission from
Hitachi Energy, and the contents thereof must not be imparted to a third party, nor used for any
unauthorized purpose.
The software and hardware described in this document is furnished under a license and may be used
or disclosed only in accordance with the terms of such license.
This product includes software developed by the OpenSSL Project for use in the OpenSSL Toolkit.
(https://www.openssl.org/) This product includes cryptographic software written/developed by: Eric
Young ([email protected]) and Tim Hudson ([email protected]).
Trademarks
ABB is a registered trademark of ABB Asea Brown Boveri Ltd. Manufactured by/for a Hitachi Energy
company. All other brand or product names mentioned in this document may be trademarks or
registered trademarks of their respective holders.
Warranty
Please inquire about the terms of warranty from your nearest Hitachi Energy representative.

Disclaimer
The data, examples and diagrams in this manual are included solely for the concept or product
description and are not to be deemed as a statement of guaranteed properties. All persons
responsible for applying the equipment addressed in this manual must satisfy themselves that each
intended application is suitable and acceptable, including that any applicable safety or other
operational requirements are complied with. In particular, any risks in applications where a system
failure and/or product failure would create a risk for harm to property or persons (including but not
limited to personal injuries or death) shall be the sole responsibility of the person or entity applying
the equipment, and those so responsible are hereby requested to ensure that all measures are taken
to exclude or mitigate such risks.
This document has been carefully checked by Hitachi Energy but deviations cannot be completely
ruled out. In case any errors are detected, the reader is kindly requested to notify the manufacturer.
Other than under explicit contractual commitments, in no event shall Hitachi Energy be responsible
or liable for any loss or damage resulting from the use of this manual or the application of the
equipment.

Conformity
This product complies with the directive of the Council of the European Communities on the
approximation of the laws of the Member States relating to electromagnetic compatibility (EMC
Directive 2004/108/EC) and concerning electrical equipment for use within specified voltage limits
(Low-voltage directive 2006/95/EC). This conformity is the result of tests conducted by Hitachi
Energy in accordance with the product standard EN 60255-26 for the EMC directive, and with the
product standards EN 60255-1 and EN 60255-27 for the low voltage directive. The product is
designed in accordance with the international standards of the IEC 60255 series.

Table of contents
Section 1 Introduction..................................................................................................13
1.1 This manual.........................................................................................................................13
1.2 Intended audience...............................................................................................................13
1.3 Product documentation....................................................................................................... 14
1.3.1 Product documentation set................................................................................................14
1.3.2 Document revision history.................................................................................................15
1.3.3 Related documents........................................................................................................... 16
1.4 Document symbols and conventions...................................................................................16
1.4.1 Symbols.............................................................................................................................16
1.4.2 Document conventions......................................................................................................17
1.5 IEC 61850 edition 1 / edition 2 mapping............................................................................. 17
Section 2 Safety information....................................................................................... 23
2.1 Symbols on the product.......................................................................................................23
2.2 Warnings............................................................................................................................. 23
2.3 Caution signs.......................................................................................................................24
2.4 Note signs........................................................................................................................... 25
Section 3 Available functions......................................................................................27
3.1 Main protection functions.................................................................................................... 27
3.2 Back-up protection functions...............................................................................................29
3.3 Control and monitoring functions.........................................................................................31
3.4 Communication................................................................................................................... 38
3.5 Basic IED functions............................................................................................................. 42
Section 4 Starting up....................................................................................................45
4.1 Factory and site acceptance testing....................................................................................45
4.2 Commissioning checklist.....................................................................................................45
4.3 Checking the power supply................................................................................................. 45
4.4 Energizing the IED.............................................................................................................. 46
4.4.1 Checking the IED operation.............................................................................................. 46
4.4.2 IED start-up sequence ......................................................................................................46
4.5 Setting up communication between PCM600 and the IED................................................. 47
4.5.1 When IED has blank front panel........................................................................................47
4.5.2 When IED has front port with RJ-45..................................................................................47
4.6 Writing an application configuration to the IED................................................................... 51
4.7 Checking CT circuits........................................................................................................... 51
4.8 Checking VT circuits............................................................................................................52
4.9 Using the RTXP test switch ................................................................................................52
4.10 Checking the binary input/output circuits.............................................................................53
4.10.1 Binary input circuits........................................................................................................... 53
4.10.2 Binary output circuits.........................................................................................................53
4.11 Checking optical connections..............................................................................................53
1MRK 504 165-UEN Rev. K Table of contents
Transformer protection RET670 1
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

Section 5 Configuring the IED and changing settings..............................................55
5.1 Overview............................................................................................................................. 55
5.2 Configuring analog CT inputs..............................................................................................55
5.3 Supervision of input/output modules................................................................................... 56
Section 6 Establishing connection and verifying the SPA/IEC communication.....57
6.1 Entering settings..................................................................................................................57
6.1.1 Entering SPA settings........................................................................................................57
6.1.2 Entering IEC settings.........................................................................................................57
6.2 Verifying the communication............................................................................................... 57
6.2.1 Verifying SPA communication........................................................................................... 58
6.2.2 Verifying IEC communication............................................................................................ 58
6.3 Fiber optic loop....................................................................................................................58
6.4 Optical budget calculation for serial communication with SPA/IEC ....................................59
Section 7 Establishing connection and verifying the LON communication........... 61
7.1 Communication via the rear ports ...................................................................................... 61
7.1.1 LON communication..........................................................................................................61
7.1.2 The LON Protocol..............................................................................................................62
7.1.3 Hardware and software modules.......................................................................................62
7.2 Optical budget calculation for serial communication with LON .......................................... 63
Section 8 Establishing connection and verifying the IEC 61850 communication..65
8.1 Overview............................................................................................................................. 65
8.2 Setting the station communication...................................................................................... 65
8.3 Verifying the communication .............................................................................................. 65
Section 9 Establishing connection and verifying the IEEE C37.118/1344
communication............................................................................................ 67
9.1 Overview............................................................................................................................. 67
9.2 Setting the PMU station communication (PMU Report)...................................................... 67
9.3 Setting the PMU station communication (PMU configuration)............................................ 67
9.4 Setting the TCP/UDP client communication........................................................................68
9.5 Verifying the communication............................................................................................... 71
9.5.1 Verifying the IEEE C37.118/1344 TCP communication.....................................................71
9.5.2 Verifying the IEEE C37.118/1344 UDP communication.................................................... 77
9.6 Optical budget calculation for PMU - PDC communication.................................................78
Section 10 Testing IED operation..................................................................................79
10.1 Preparing for test.................................................................................................................79
10.1.1 Requirements....................................................................................................................79
10.1.2 Preparing the IED to verify settings...................................................................................80
10.2 Activating the test mode......................................................................................................81
10.3 Preparing the connection to the test equipment..................................................................81
10.4 Connecting the test equipment to the IED...........................................................................82
10.5 Releasing the function to be tested.....................................................................................82
10.6 Verifying analog primary and secondary measurement...................................................... 83
Table of contents 1MRK 504 165-UEN Rev. K
2Transformer protection RET670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

10.7 Testing the protection functionality...................................................................................... 84
10.8 Forcing of binary input/output signals for testing.................................................................84
10.8.1 Forcing concept.................................................................................................................84
10.8.2 How to enable forcing........................................................................................................85
10.8.2.1 Enable forcing by using LHMI...................................................................................... 85
10.8.2.2 Enable forcing using TESTMODE function block.........................................................85
10.8.3 How to change binary input/output signals using forcing.................................................. 85
10.8.3.1 Forcing by using LHMI................................................................................................. 85
10.8.3.2 Forcing by using PCM600............................................................................................87
10.8.4 How to undo forcing changes and return the IED to normal operation............................. 88
10.8.4.1 Undo forcing by using TESTMODE component...........................................................89
10.8.4.2 Undo forcing by using LHMI.........................................................................................89
10.8.4.3 Undo forcing by using PCM600................................................................................... 89
Section 11 Testing functionality by secondary injection............................................91
11.1 Testing disturbance report...................................................................................................91
11.1.1 Introduction........................................................................................................................91
11.1.2 Disturbance report settings............................................................................................... 91
11.1.3 Disturbance recorder (DR)................................................................................................ 91
11.1.4 Event recorder (ER) and Event list (EL)............................................................................92
11.2 Identifying the function to test in the technical reference manual .......................................92
11.3 Differential protection.......................................................................................................... 92
11.3.1 Transformer differential protection T2WPDIF and T3WPDIF............................................92
11.3.1.1 Verifying the settings.................................................................................................... 92
11.3.1.2 Completing the test...................................................................................................... 93
11.3.2 High impedance differential protection HZPDIF ...............................................................93
11.3.2.1 Verifying the settings.................................................................................................... 93
11.3.2.2 Completing the test...................................................................................................... 94
11.3.3 Restricted earth fault protection, low impedance REFPDIF .............................................94
11.3.3.1 Function revision history.............................................................................................. 94
11.3.3.2 Verifying the settings.................................................................................................... 94
11.3.3.3 Completing the test...................................................................................................... 95
11.3.4 Additional security logic for differential protection LDRGFC ............................................ 95
11.3.4.1 Verifying the settings.................................................................................................... 95
11.3.4.2 Completing the test...................................................................................................... 96
11.3.5 Self-adaptive differential protection for two-winding power transformers PSTPDIF..........96
11.3.5.1 Preparing the function for testing................................................................................. 96
11.3.5.2 Verifying the zero-sequence current reduction from the winding one side...................97
11.3.5.3 Verifying the three-phase pickup from winding one side..............................................98
11.3.5.4 Verifying the single-phase pickup from winding one side.............................................98
11.3.5.5 Verifying the zero-sequence current reduction from winding two side......................... 99
11.3.5.6 Verifying the three-phase pickup from winding two side.............................................. 99
11.3.5.7 Verifying the single-phase pickup from winding two side........................................... 100
11.3.5.8 Verifying the operate characteristic............................................................................ 101
11.3.5.9 Completing the test.................................................................................................... 102
11.4 Impedance protection........................................................................................................102
1MRK 504 165-UEN Rev. K Table of contents
Transformer protection RET670 3
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

11.4.1 Distance protection zones, quadrilateral characteristic ZMQPDIS .................................102
11.4.1.1 Measuring the operating limit of set values................................................................105
11.4.1.2 Measuring the operating time of distance protection zones.......................................105
11.4.1.3 Completing the test.................................................................................................... 106
11.4.2 Phase selection, quad, fixed angle, load encroachment FDPSPDIS .............................106
11.4.2.1 Measuring the operating limit of set values................................................................108
11.4.2.2 Completing the test.................................................................................................... 108
11.4.3 Full scheme distance protection, mho characteristic ZMHPDIS .................................... 108
11.4.3.1 Phase-to-phase faults................................................................................................ 109
11.4.3.2 Phase-to-earth faults ................................................................................................. 110
11.4.4 Faulty phase identification with load encroachment FMPSPDIS ....................................110
11.4.5 Distance protection zones, quadrilateral characteristic, separate settings ZMRPDIS.....110
11.4.5.1 Measuring the operating limit of set values ............................................................... 113
11.4.5.2 Measuring the operating time of distance protection zones ...................................... 114
11.4.6 Phase selection, quadrilateral characteristic with settable angle FRPSPDIS................. 114
11.4.6.1 Measuring the operating limit of set values................................................................ 116
11.4.6.2 Completing the test.................................................................................................... 117
11.4.7 High speed distance protection zones, quadrilateral and mho characteristic
ZMFPDIS ........................................................................................................................117
11.4.7.1 Function revision history.............................................................................................117
11.4.7.2 Verifying the settings.................................................................................................. 118
11.4.7.3 Measuring the operating limit of set values ...............................................................120
11.4.7.4 Measuring the operating time of distance protection zones.......................................121
11.4.7.5 Completing the test.................................................................................................... 121
11.4.8 High Speed distance for series compensated line zones, quadrilateral and mho
characteristic ZMFCPDIS ...............................................................................................121
11.4.8.1 Function revision history............................................................................................ 121
11.4.8.2 Verifying the settings.................................................................................................. 122
11.4.8.3 Measuring the operating limit of set values ...............................................................125
11.4.8.4 Measuring the operating time of distance protection zones.......................................125
11.4.8.5 Transient directional element..................................................................................... 125
11.4.8.6 Completing the test.................................................................................................... 126
11.4.9 Power swing detection, blocking and unblocking ZMBURPSB.......................................126
11.4.9.1 Function revision history............................................................................................ 126
11.4.9.2 Verifying the signal and settings.................................................................................126
11.4.9.3 Completing the test.................................................................................................... 132
11.4.10 Power swing logic PSLPSCH..........................................................................................132
11.4.10.1 Function revision history............................................................................................ 132
11.4.10.2 Testing the carrier send and trip signals.....................................................................133
11.4.10.3 Testing the influence of the residual overcurrent protection.......................................133
11.4.10.4 Checking the underreaching zone............................................................................. 134
11.4.10.5 Completing the test.................................................................................................... 134
11.4.11 Pole slip protection PSPPPAM........................................................................................134
11.4.11.1 Verifying the settings.................................................................................................. 134
11.4.11.2 Completing the test.................................................................................................... 137
11.4.12 Out-of-step protection OOSPPAM ..................................................................................137
Table of contents 1MRK 504 165-UEN Rev. K
4Transformer protection RET670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

11.4.12.1 Verifying the settings.................................................................................................. 138
11.4.12.2 Test of point RE (RFwdR, XFwdX)................................................................................. 141
11.4.12.3 Test of the boundary between zone 1 and zone 2, which is defined by the
parameter ReachZ1................................................................................................... 145
11.4.12.4 Test of the point SE (RRvsR, XRvsX).............................................................................148
11.4.13 Automatic switch onto fault logic ZCVPSOF................................................................... 152
11.4.13.1 Function revision history............................................................................................ 152
11.4.13.2 Activating ZCVPSOF externally ................................................................................ 153
11.4.13.3 Initiating ZCVPSOF automatically and setting mode to impedance ..........................153
11.4.13.4 Initiating ZCVPSOF automatically and setting mode to UILevel ...............................153
11.4.13.5 Completing the test.................................................................................................... 153
11.4.14 Phase preference logic PPLPHIZ ...................................................................................153
11.4.14.1 Function revision history............................................................................................ 153
11.4.14.2 Verifying the signals and settings...............................................................................154
11.4.14.3 Completing the test.................................................................................................... 154
11.4.15 Phase preference logic PPL2PHIZ..................................................................................155
11.4.15.1 Function revision history............................................................................................ 155
11.4.15.2 Verifying the signals and settings...............................................................................155
11.4.15.3 Completing the test.................................................................................................... 156
11.4.16 Under impedance protection for Generator ZGVPDIS....................................................156
11.4.16.1 Verifying the settings.................................................................................................. 156
11.4.16.2 Completing the test.................................................................................................... 158
11.5 Current protection..............................................................................................................159
11.5.1 Instantaneous phase overcurrent protection 3-phase output PHPIOC .......................... 159
11.5.1.1 Measuring the operate limit of set values...................................................................159
11.5.1.2 Completing the test.................................................................................................... 159
11.5.2 Directional phase overcurrent protection, four steps OC4PTOC ................................... 159
11.5.2.1 Function revision history............................................................................................ 160
11.5.2.2 Verifying the settings.................................................................................................. 160
11.5.2.3 Completing the test.................................................................................................... 161
11.5.3 Instantaneous residual overcurrent protection EFPIOC .................................................161
11.5.3.1 Measuring the operate limit of set values...................................................................161
11.5.3.2 Completing the test.................................................................................................... 162
11.5.4 Four step residual overcurrent protection, (Zero sequence or negative sequence
directionality) EF4PTOC .................................................................................................162
11.5.4.1 Function revision history............................................................................................ 162
11.5.4.2 Four step directional earth fault protection ................................................................162
11.5.4.3 Four step non-directional earth fault protection .........................................................163
11.5.4.4 Completing the test.................................................................................................... 163
11.5.5 Four step negative sequence overcurrent protection NS4PTOC ...................................163
11.5.5.1 Function revision history............................................................................................ 163
11.5.5.2 Completing the test.................................................................................................... 164
11.5.6 Sensitive directional residual overcurrent and power protection SDEPSDE ..................164
11.5.6.1 Measuring the operate and time limit for set values...................................................165
11.5.6.2 Completing the test.................................................................................................... 169
11.5.7 Thermal overload protection, one time constant, Celsius/Fahrenheit LCPTTR/LFPTTR169
1MRK 504 165-UEN Rev. K Table of contents
Transformer protection RET670 5
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

11.5.7.1 Measuring the operate and time limit of set values....................................................169
11.5.7.2 Completing the test.................................................................................................... 170
11.5.8 Thermal overload protection, two time constants TRPTTR ............................................170
11.5.8.1 Checking operate and reset values............................................................................170
11.5.8.2 Completing the test.................................................................................................... 171
11.5.9 Breaker failure protection, phase segregated activation and output CCRBRF .............. 171
11.5.9.1 Function revision history............................................................................................ 171
11.5.9.2 Checking the phase current operate value, IP> ........................................................171
11.5.9.3 Checking the residual (earth fault) current operate value IN> set below IP> ............172
11.5.9.4 Checking the re-trip and back-up times..................................................................... 172
11.5.9.5 Verifying the re-trip mode........................................................................................... 172
11.5.9.6 Verifying the back-up trip mode .................................................................................173
11.5.9.7 Verifying instantaneous back-up trip at CB faulty condition....................................... 173
11.5.9.8 Verifying the case FunctionMode = CB Pos...............................................................173
11.5.9.9 Verifying the case RetripMode = Contact...................................................................174
11.5.9.10 Verifying the caseFunctionMode = Current or CB Pos...............................................174
11.5.9.11 Verifying the external start signal has timed out.........................................................175
11.5.9.12 Verifying that backup signal is released when STALARM is reset............................. 175
11.5.9.13 Test of FollowStart&Mode behaviour......................................................................... 175
11.5.9.14 Test of FollowStart behaviour.....................................................................................175
11.5.9.15 Completing the test.................................................................................................... 175
11.5.10 Stub protection STBPTOC.............................................................................................. 176
11.5.10.1 Function revision history............................................................................................ 176
11.5.10.2 Measuring the operate limit of set values...................................................................176
11.5.10.3 Completing the test.................................................................................................... 176
11.5.11 Overcurrent protection with binary release BRPTOC......................................................177
11.5.11.1 Function revision history............................................................................................ 177
11.5.11.2 Measuring the operate limit of set values...................................................................177
11.5.11.3 Completing the test.................................................................................................... 178
11.5.12 Pole discordance protection CCPDSC............................................................................178
11.5.12.1 Verifying the settings.................................................................................................. 178
11.5.12.2 Completing the test.................................................................................................... 178
11.5.13 Directional underpower protection GUPPDUP ...............................................................179
11.5.13.1 Verifying the settings.................................................................................................. 179
11.5.13.2 Completing the test.................................................................................................... 180
11.5.14 Directional overpower protection GOPPDOP .................................................................180
11.5.14.1 Verifying the settings.................................................................................................. 180
11.5.14.2 Completing the test.................................................................................................... 181
11.5.15 Broken conductor check BRCPTOC .............................................................................. 181
11.5.15.1 Function revision history............................................................................................ 181
11.5.15.2 Measuring the operate and time limit of set values....................................................181
11.5.15.3 Completing the test.................................................................................................... 182
11.5.16 Capacitor bank protection CBPGAPC.............................................................................182
11.5.16.1 Verifying the settings and operation of the function................................................... 182
11.5.16.2 Completing the test.................................................................................................... 185
11.5.17 Negative-sequence time overcurrent protection for machines NS2PTOC .....................185
Table of contents 1MRK 504 165-UEN Rev. K
6Transformer protection RET670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

11.5.17.1 Verifying settings by secondary injection................................................................... 185
11.5.17.2 Completing the test.................................................................................................... 187
11.5.18 Voltage-restrained time overcurrent protection VRPVOC............................................... 187
11.5.18.1 Function revision history............................................................................................ 187
11.5.18.2 Verifying the settings.................................................................................................. 187
11.5.18.3 Completing the test.................................................................................................... 190
11.5.19 Average Power Transient Earth Fault Protection, APPTEF............................................ 190
11.5.19.1 Verifying the signals and settings...............................................................................190
11.5.19.2 Completing the test.................................................................................................... 193
11.6 Voltage protection..............................................................................................................194
11.6.1 Two step undervoltage protection UV2PTUV .................................................................194
11.6.1.1 Verifying the settings.................................................................................................. 194
11.6.1.2 Completing the test.................................................................................................... 195
11.6.2 Two step overvoltage protection OV2PTOV ...................................................................195
11.6.2.1 Verifying the settings.................................................................................................. 195
11.6.2.2 Extended testing........................................................................................................ 195
11.6.2.3 Completing the test.................................................................................................... 196
11.6.3 Two step residual overvoltage protection ROV2PTOV .................................................. 196
11.6.3.1 Function revision history............................................................................................ 196
11.6.3.2 Verifying the settings.................................................................................................. 196
11.6.3.3 Completing the test.................................................................................................... 197
11.6.4 Overexcitation protection OEXPVPH ............................................................................. 197
11.6.4.1 Verifying the settings.................................................................................................. 197
11.6.4.2 Completing the test.................................................................................................... 197
11.6.5 Voltage differential protection VDCPTOV .......................................................................197
11.6.5.1 Function revision history............................................................................................ 198
11.6.5.2 Check of undervoltage levels.....................................................................................198
11.6.5.3 Check of voltage differential trip and alarm levels......................................................200
11.6.5.4 Check of trip and trip reset timers.............................................................................. 201
11.6.5.5 Final adjustment of compensation for VT ratio differences .......................................202
11.6.5.6 Completing the test.................................................................................................... 202
11.6.6 Loss of voltage check LOVPTUV ...................................................................................202
11.6.6.1 Measuring the operate limit of set values...................................................................202
11.6.6.2 Completing the test.................................................................................................... 203
11.7 Unbalance protection........................................................................................................ 203
11.7.1 Shunt capacitor cascading failure protection SCCFPVOC .............................................203
11.7.1.1 Function revision history............................................................................................ 203
11.7.1.2 Verifying the signals and settings...............................................................................203
11.7.1.3 Completing the test.................................................................................................... 205
11.7.2 Current unbalance protection of SCB, SCUCPTOC....................................................... 205
11.7.2.1 Verifying the signals and settings...............................................................................205
11.7.2.2 Completing the test.................................................................................................... 209
11.7.3 Phase voltage differential based capacitor bank unbalanced protection, SCPDPTOV...209
11.7.3.1 Verifying the signals and settings...............................................................................209
11.7.3.2 Completing the test.................................................................................................... 215
11.7.4 Voltage unbalance protection of shunt capacitor bank, SCUVPTOV..............................215
1MRK 504 165-UEN Rev. K Table of contents
Transformer protection RET670 7
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

11.7.4.1 Verifying the signals and settings...............................................................................215
11.7.4.2 Completing the test.................................................................................................... 217
11.8 Frequency protection.........................................................................................................217
11.8.1 Underfrequency protection SAPTUF ..............................................................................217
11.8.1.1 Verifying the settings.................................................................................................. 217
11.8.1.2 Completing the test.................................................................................................... 218
11.8.2 Overfrequency protection SAPTOF ................................................................................218
11.8.2.1 Verifying the settings.................................................................................................. 218
11.8.2.2 Completing the test.................................................................................................... 219
11.8.3 Rate-of-change frequency protection SAPFRC ............................................................. 219
11.8.3.1 Verifying the settings.................................................................................................. 219
11.8.3.2 Completing the test.................................................................................................... 219
11.9 Multipurpose protection.....................................................................................................220
11.9.1 Function revision history..................................................................................................220
11.9.2 General current and voltage protection CVGAPC...........................................................220
11.9.2.1 Built-in overcurrent feature (non-directional)..............................................................220
11.9.2.2 Overcurrent feature with current restraint.................................................................. 221
11.9.2.3 Overcurrent feature with voltage restraint..................................................................221
11.9.2.4 Overcurrent feature with directionality........................................................................221
11.9.2.5 Over/Undervoltage feature.........................................................................................222
11.9.2.6 Completing the test.................................................................................................... 222
11.10 Secondary system supervision..........................................................................................222
11.10.1 Current circuit supervision CCSSPVC ........................................................................... 222
11.10.1.1 Verifying the settings.................................................................................................. 222
11.10.1.2 Completing the test.................................................................................................... 223
11.10.2 Fuse failure supervision FUFSPVC.................................................................................223
11.10.2.1 Checking that the binary inputs and outputs operate as expected ........................... 223
11.10.2.2 Measuring the operate value for the negative sequence function .............................223
11.10.2.3 Measuring the operate value for the zero-sequence function ...................................224
11.10.2.4 Measuring the operate value for the dead line detection function..............................225
11.10.2.5 Checking the operation of the du/dt and di/dt based function ...................................225
11.10.2.6 Completing the test.................................................................................................... 226
11.10.3 Fuse failure supervision VDSPVC...................................................................................226
11.10.3.1 Completing the test.................................................................................................... 226
11.10.4 Voltage based delta supervision DELVSPVC..................................................................227
11.10.4.1 Verifying the signals and settings...............................................................................227
11.10.4.2 Completing the test.................................................................................................... 227
11.10.5 Current based delta supervision DELISPVC...................................................................227
11.10.5.1 Verifying the signals and settings...............................................................................228
11.10.5.2 Completing the test.................................................................................................... 228
11.10.6 Delta supervision of real input DELSPVC....................................................................... 228
11.10.6.1 Verifying the signals and settings...............................................................................228
11.10.6.2 Completing the test.................................................................................................... 229
11.11 Control...............................................................................................................................229
11.11.1 Synchrocheck, energizing check, and synchronizing SESRSYN....................................229
11.11.1.1 Testing the synchronizing function............................................................................. 230
Table of contents 1MRK 504 165-UEN Rev. K
8Transformer protection RET670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

11.11.1.2 Testing the synchrocheck functionality.......................................................................231
11.11.1.3 Testing the energizing check......................................................................................233
11.11.1.4 Testing the voltage selection......................................................................................234
11.11.1.5 Completing the test.................................................................................................... 236
11.11.2 Autorecloser for 1/2/3-phase operation SMBRREC .......................................................236
11.11.2.1 Preparation of the verification ................................................................................... 238
11.11.2.2 Switching the auto recloser to On and Off On and Off ..............................................238
11.11.2.3 Verifying the auto recloser .........................................................................................239
11.11.2.4 Checking the auto reclosing conditions......................................................................239
11.11.2.5 Completing the test.................................................................................................... 241
11.11.3 Apparatus control APC....................................................................................................241
11.11.4 Function revision history..................................................................................................241
11.11.5 Voltage control TR1ATCC, TR8ATCC, TCMYLTC, TCLYLTC ........................................241
11.11.5.1 Secondary test........................................................................................................... 243
11.11.5.2 Check the activation of the voltage control operation................................................ 243
11.11.5.3 Check the normal voltage regulation function............................................................243
11.11.5.4 Check the undervoltage block function...................................................................... 244
11.11.5.5 Check the upper and lower busbar voltage limit........................................................ 244
11.11.5.6 Check the overcurrent block function.........................................................................244
11.11.5.7 Single transformer......................................................................................................245
11.11.5.8 Parallel voltage regulation..........................................................................................246
11.11.5.9 Completing the test.................................................................................................... 249
11.11.6 Single command, 16 signals SINGLECMD.....................................................................249
11.11.7 Interlocking......................................................................................................................249
11.12 Scheme communication....................................................................................................249
11.12.1 Scheme communication logic for distance or overcurrent protection ZCPSCH .............249
11.12.1.1 Function revision history............................................................................................ 250
11.12.1.2 Testing permissive underreaching..............................................................................250
11.12.1.3 Testing permissive overreaching................................................................................250
11.12.1.4 Testing blocking scheme............................................................................................251
11.12.1.5 Testing delta blocking scheme................................................................................... 251
11.12.1.6 Checking of unblocking logic......................................................................................251
11.12.1.7 Completing the test.................................................................................................... 251
11.12.2 Phase segregated scheme communication logic for distance or overcurrent
protection ZPCPSCH ..................................................................................................... 252
11.12.2.1 Function revision history............................................................................................ 252
11.12.2.2 Testing permissive underreaching..............................................................................252
11.12.2.3 Testing permissive overreaching................................................................................252
11.12.2.4 Testing blocking scheme............................................................................................253
11.12.2.5 Completing the test.................................................................................................... 253
11.12.3 Current reversal and Weak-end infeed logic for distance protection 3-phase
ZCRWPSCH ...................................................................................................................253
11.12.3.1 Function revision history............................................................................................ 254
11.12.3.2 Current reversal logic.................................................................................................254
11.12.3.3 Weak end infeed logic................................................................................................254
11.12.3.4 Completing the test.................................................................................................... 255
1MRK 504 165-UEN Rev. K Table of contents
Transformer protection RET670 9
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

11.12.4 Scheme communication logic for residual overcurrent protection ECPSCH ..................255
11.12.4.1 Function revision history............................................................................................ 256
11.12.4.2 Testing the directional comparison logic function.......................................................256
11.12.4.3 Completing the test.................................................................................................... 257
11.12.5 Current reversal and weak-end infeed logic for residual overcurrent protection
ECRWPSCH .................................................................................................................. 257
11.12.5.1 Testing the current reversal logic............................................................................... 257
11.12.5.2 Testing the weak-end infeed logic..............................................................................258
11.12.5.3 Completing the test.................................................................................................... 259
11.13 Logic..................................................................................................................................259
11.13.1 Tripping logic, common 3-phase output SMPPTRC .......................................................259
11.13.1.1 Function revision history............................................................................................ 259
11.13.1.2 3 phase operating mode............................................................................................ 259
11.13.1.3 1ph/3ph operating mode ........................................................................................... 260
11.13.1.4 1ph/2ph/3ph operating mode .................................................................................... 260
11.13.1.5 Circuit breaker lockout............................................................................................... 261
11.13.1.6 Completing the test.................................................................................................... 262
11.14 Monitoring..........................................................................................................................262
11.14.1 Gas medium supervision SSIMG.................................................................................... 262
11.14.1.1 Function revision history............................................................................................ 262
11.14.1.2 Testing the gas medium supervision for pressure alarm and pressure lockout
conditions ..................................................................................................................263
11.14.1.3 Testing the gas medium supervision for temperature alarm and temperature
lockout conditions ......................................................................................................263
11.14.1.4 Completing the test.................................................................................................... 263
11.14.2 Liquid medium supervision SSIML..................................................................................263
11.14.2.1 Function revision history............................................................................................ 264
11.14.2.2 Testing the liquid medium supervision for level alarm and level lockout conditions...264
11.14.2.3 Testing the gas medium supervision for temperature alarm and temperature
lockout conditions.......................................................................................................264
11.14.2.4 Completing the test.................................................................................................... 265
11.14.3 Breaker monitoring SSCBR.............................................................................................265
11.14.3.1 Verifying the settings.................................................................................................. 265
11.14.3.2 Completing the test.................................................................................................... 266
11.14.4 Event function EVENT.....................................................................................................266
11.14.5 Limit counter L4UFCNT...................................................................................................266
11.14.5.1 Completing the test.................................................................................................... 267
11.14.6 Estimation of transformer insulation life LOLSPTR ........................................................267
11.14.6.1 Verifying the signals and settings...............................................................................267
11.14.6.2 Completing the test.................................................................................................... 268
11.14.7 Through fault monitoring PTRSTHR .............................................................................. 268
11.14.7.1 Verifying the signals and settings...............................................................................268
11.14.7.2 Completing the test.................................................................................................... 269
11.14.8 Function revision history..................................................................................................269
11.14.9 Current harmonic monitoring CHMMHAI.........................................................................269
11.14.9.1 Verifying the signals and settings...............................................................................269
11.14.9.2 Completing the test.................................................................................................... 270
Table of contents 1MRK 504 165-UEN Rev. K
10 Transformer protection RET670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

11.14.10 Function revision history..................................................................................................270
11.14.11 Voltage harmonic monitoring VHMMHAI.........................................................................271
11.14.11.1 Verifying the signals and settings...............................................................................271
11.14.11.2 Completing the test.................................................................................................... 271
11.14.12 Function revision history..................................................................................................271
11.14.13 Fault current and voltage monitoring function FLTMMXU ..............................................272
11.14.13.1 Verifying the settings.................................................................................................. 272
11.14.13.2 Completing the test.................................................................................................... 272
11.14.14 Fault locator LMBRFLO...................................................................................................272
11.14.14.1 Function revision history............................................................................................ 272
11.14.14.2 Verifying the signals and settings...............................................................................273
11.14.14.3 Measuring the operate limit........................................................................................273
11.14.14.4 Completing the test.................................................................................................... 274
11.15 Metering............................................................................................................................ 274
11.15.1 Pulse-counter logic PCFCNT.......................................................................................... 274
11.15.2 Function for energy calculation and demand handling ETPMMTR.................................274
11.15.2.1 Verifying the settings.................................................................................................. 274
11.15.2.2 Completing the test.................................................................................................... 275
11.16 Station communication......................................................................................................275
11.16.1 Multiple command and transmit MULTICMDRCV / MULTICMDSND..............................275
11.17 Remote communication.....................................................................................................276
11.17.1 Binary signal transfer.......................................................................................................276
11.18 Basic IED functions........................................................................................................... 277
11.18.1 Parameter setting group handling SETGRPS.................................................................277
11.18.1.1 Verifying the settings.................................................................................................. 277
11.18.1.2 Completing the test.................................................................................................... 277
11.19 Exit test mode....................................................................................................................278
Section 12 Primary injection testing...........................................................................279
12.1 Transformer Voltage Control ATCC...................................................................................279
12.1.1 Load drop compensation function, LDC..........................................................................279
12.1.2 Voltage control of Parallel Transformers......................................................................... 280
12.1.3 Minimum Circulating Current (MCC) method.................................................................. 281
12.1.4 Master Follower (MF) method......................................................................................... 282
12.1.5 Completing the test......................................................................................................... 283
Section 13 Checking the directionality.......................................................................285
13.1 Overview........................................................................................................................... 285
13.2 Testing the directionality of the distance protection...........................................................285
Section 14 Commissioning and maintenance of the fault clearing system............287
14.1 Commissioning tests......................................................................................................... 287
14.2 Periodic maintenance tests............................................................................................... 287
14.2.1 Visual inspection............................................................................................................. 288
14.2.2 Maintenance tests........................................................................................................... 288
14.2.2.1 Preparation.................................................................................................................288
14.2.2.2 Recording...................................................................................................................288
1MRK 504 165-UEN Rev. K Table of contents
Transformer protection RET670 11
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

14.2.2.3 Secondary injection....................................................................................................288
14.2.2.4 Alarm test...................................................................................................................288
14.2.2.5 Self supervision check............................................................................................... 289
14.2.2.6 Trip circuit check........................................................................................................ 289
14.2.2.7 Measurement of service currents...............................................................................289
14.2.2.8 Restoring....................................................................................................................290
Section 15 Troubleshooting.........................................................................................291
15.1 Checking the self supervision signals............................................................................... 291
15.1.1 Checking the self supervision function............................................................................291
15.1.1.1 Determine the cause of an internal failure................................................................. 291
15.1.2 Self supervision HMI data............................................................................................... 291
15.1.2.1 General IED status.....................................................................................................291
15.2 Fault tracing.......................................................................................................................292
15.2.1 Internal fault indications...................................................................................................292
15.2.2 Using front-connected PC............................................................................................... 293
15.2.3 Diagnosing the IED status via the LHMI hint menu.........................................................294
15.2.4 Hardware re-configuration...............................................................................................297
15.3 Repair instruction.............................................................................................................. 298
15.4 Repair support...................................................................................................................299
15.5 Maintenance......................................................................................................................299
Section 16 Glossary..................................................................................................... 301
Table of contents 1MRK 504 165-UEN Rev. K
12 Transformer protection RET670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

Section 1 Introduction
1.1 This manual GUID-AB423A30-13C2-46AF-B7FE-A73BB425EB5F v20
The commissioning manual contains instructions on how to commission the IED. The manual can
also be used by system engineers and maintenance personnel for assistance during the testing
phase. The manual provides procedures for the checking of external circuitry and energizing the IED,
parameter setting and configuration as well as verifying settings by secondary injection. The manual
describes the process of testing an IED in a substation which is not in service. The chapters are
organized in the chronological order in which the IED should be commissioned. The relevant
procedures may be followed also during the service and maintenance activities.
1.2 Intended audience GUID-C9B8127F-5748-4BEA-9E4F-CC762FE28A3A v11
This manual addresses the personnel responsible for commissioning, maintenance and taking the
IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic equipment. The
commissioning and maintenance personnel must be well experienced in using protection equipment,
test equipment, protection functions and the configured functional logics in the IED.
1MRK 504 165-UEN Rev. K Section 1
Introduction
Transformer protection RET670 13
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved

1.3 Product documentation
1.3.1 Product documentation set GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v16
IEC07000220-4-en.vsd
Planning & purchase
Engineering
Installing
Commissioning
Operation
Maintenance
Decommissioning
Deinstalling & disposal
Application manual
Operation manual
Installation manual
Engineering manual
Communication
protocol manual
Cyber security
deployment guideline
Technical manual
Commissioning manual
IEC07000220 V4 EN-US
Figure 1: The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using the various tools
available within the PCM600 software. The manual provides instructions on how to set up a PCM600
project and insert IEDs to the project structure. The manual also recommends a sequence for the
engineering of protection and control functions, as well as communication engineering for IEC 61850.
The installation manual contains instructions on how to install the IED. The manual provides
procedures for mechanical and electrical installation. The chapters are organized in the chronological
order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The manual can
also be used by system engineers and maintenance personnel for assistance during the testing
phase. The manual provides procedures for the checking of external circuitry and energizing the IED,
parameter setting and configuration as well as verifying settings by secondary injection. The manual
describes the process of testing an IED in a substation which is not in service. The chapters are
organized in the chronological order in which the IED should be commissioned. The relevant
procedures may be followed also during the service and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and setting of the
IED. The manual also describes how to identify disturbances and how to view calculated and
measured power grid data to determine the cause of a fault.
Section 1 1MRK 504 165-UEN Rev. K
Introduction
14 Transformer protection RET670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
This manual suits for next models
1
Table of contents
Other Hitachi Control System manuals