
Figures
1Floorspacerequirements........................ 14
2Powersupplycord .......................... 15
3Walloutlet(NEMAL6-20Rrated250VAC20amps)............ 16
4Minimumfloorspacerequirements-unpackingsite ............ 20
5Removingthesteelbands ....................... 21
6Removingtheboxtopcover ...................... 22
7Removingthecardboardbox...................... 23
8Removingthefrontpalletrail...................... 24
9Attachingthepalletramp ....................... 25
10Removingtherestrainingbolt ..................... 26
11Raisingthelevelingfeet ....................... 27
12Rollingthelibrarydowntheramp ................... 28
13 Removing the shipping foam from the library perimeter . . . . . . . . . . 29
14Openingthelaptoptray ....................... 30
15Removingtheshippingfoam ..................... 31
16Removetheinternallibraryframerestraint................ 32
17 Removing the vertical axis and robot shipping restraints . . . . . . . . . . 33
18Storingtheverticalaxisandrobotshippingrestraints........... 34
19Removingthecounterweightshippingrestraint.............. 35
20Storingthecounterweightshippingrestraint............... 36
21 Disengaging the load port latching mechanism (shown from inside the library for
clarity) ................................ 37
22 Removing the panel shipping restraints (panels shown outside of library for clarity) 38
23Storingthepanelshippingrestraints .................. 39
24AttachingSCSIterminatorstotheUltrium460orSDLTdrive ........ 43
25Preparingthecablerestraintbracket .................. 44
26Matchingdrivesandinterfacecontrollerports .............. 45
27ManagingdriveSCSIcables ..................... 47
28AttachingSCSIcables ........................ 48
29Attachingthetiewraps........................ 49
30Routingcablesthroughtheclustercableclamp.............. 51
31ConnectingFCcables ........................ 52
32ConnectingthecabinetcontrollerLANcable............... 53
33Poweringonthelibrary........................ 54
34AttachinganUltriumbarcodelabel .................. 56
35ProperUltriumbarcodelabelplacement ................ 57
36InsertinganSDLTbarcodelabel.................... 58
37Write-protectingUltriumtapecartridges................. 60
38Write-protectingSDLTtapecartridges.................. 61
39Releasingtheslotpanellatchonamiddleloadport ........... 62
40 Releasing the slot panel latch on an upper or lower load port . . . . . . . 63
HP StorageWorks ESL E-Series Tape Library unpacking and installation guide 5