
i
Contents
Preparing for installation ··································································· 1
Safety recommendations ·········································································································· 1
Examining the installation site···································································································· 2
Temperature/humidity········································································································ 2
Cleanliness····················································································································· 2
EMI······························································································································· 3
Laser safety···················································································································· 3
Installation tools······················································································································ 3
Installation accessories ············································································································ 4
Installing the switch·········································································· 6
Installing the switch in a 19-inch rack··························································································· 6
Mounting brackets and mounting positions ············································································· 7
Attaching the mounting brackets to the switch chassis······························································· 7
Rack-mounting the switch··································································································· 9
Mounting the switch on a workbench ··························································································11
Grounding the switch ··············································································································11
Grounding the switch with a grounding strip···········································································11
Grounding the switch with a grounding conductor buried in the earth ground ·································13
Grounding the switch by using the AC power cord···································································14
Connecting the power cord·······································································································15
Connecting the AC power cord ···························································································15
Connecting the switch to a –52 to –55 VDC output RPS ···························································15
Verifying the installation···········································································································16
Accessing the switch for the first time ·················································17
Setting up the configuration environment ·····················································································17
Connecting the console cable ···································································································17
Console cable·················································································································17
Connecting the console cable·····························································································17
Setting terminal parameters······································································································18
Powering on the switch············································································································18
Setting up an IRF fabric···································································19
IRF fabric setup flowchart ········································································································19
Planning IRF fabric setup·········································································································20
Planning IRF fabric size and the installation site······································································20
Identifying the master switch and planning IRF member IDs ······················································20
Planning IRF topology and connections ················································································21
Identifying physical IRF ports on the member switches·····························································22
Planning the cabling scheme······························································································22
Configuring basic IRF settings···································································································23
Connecting the physical IRF ports······························································································23
Accessing the IRF fabric to verify the configuration ········································································23
Maintenance and troubleshooting ······················································24
Power supply failure ···············································································································24
Configuration terminal problems ································································································25
Appendix A Chassis views and technical specifications ··························26
Chassis views ·······················································································································26
5120 16G SI···················································································································26
5120 24G SI···················································································································26
5120 48G SI···················································································································27
5120 8G PoE+ (65W) SI ···································································································27
5120 8G PoE+ (180W) SI··································································································28
5120 24G PoE+ (370W) SI ································································································29