
INSTALLATION INSTALLATION
1. Refer to assembly drawing before you
start installation.
2. Position recessed kits and bar
hangers between joists. Make
sure bar hangers are extended
be hanged in the correct position.
Position recessed kits temporarily by
hammering nail tabs on bar hangers,
then secure permanently with screws.
Bar hangers should be level with
bottom of joists.
3. Adjust height of recessed kits
vertically using adjusting slots
and then tightening all screws on
adjusting slots and bars hanger
bracket to back-box screws
5. Connect battery connector.
6. Connect test switch and LED Indicator
cables
via connectors.
7. Secure trim plate by using provided
screws.
4. Make proper electrical connections at
J-Box in the metal box or at junction
box in the ceiling of building. If using
120VAC, connect black and white
leads to the building utility. If using
277VAC, connect orange and white
leads to the building utility. Cap
o unused wire. In all cases, use
standard wire nuts in connection
to leads. You may use holding wire
during wiring.
NOTE: FIRST TURN OF ELECTRICITY
RECESSED CEILING MOUNTING
RECESSED WALL MOUNTING
1. Reference 1-10 step in recessed
ceiling mounting above for recessed
wall mounting.
2. Recessed ceiling mounting rotate 90°
become recessed wall mounting.
DETERMINE DIRECTIONS
1. If indicator chevron is required,
maintain chevron and remove locator
template.
2. If indicator chevron is not required,
remove both the chevron and locator
template.
ASSEMBLY DRAWING