IBM 3453-C2E User manual

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 1
IBM Cloud Pak for Data system
Customer Install Guide
Chassis
3453-C2E
Version 1.9
Note
Before using this information and the product it supports, read the information in
“Safety notices” on page 5, “Notices” on page 37, the IBM Systems Safety Notices
manual, G229-9054, and the IBM Environmental Notices and User Guide.

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 2
This edition applies to IBM Cloud Pak for Data System Components.
Revised November 2021
© Copyright IBM Corporation 2019, 2020, 2021.
US Government Users Restricted Rights –Use, duplication or disclosure restricted by
GSA ADP Schedule Contract with IBM Corp.

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 3
Contents
Safety..............................................................................................................................4
Safety Notices.................................................................................................................5
Publications...................................................................................................................14
Cloud Pak for Data System 2U chassis description ......................................................15
Cloud Pak for Data System 2U chassis hardware specifications..................................16
3453-C2E, Cloud Pak for Data System (2U server chassis)......................................16
Operating Environment .................................................................................................17
Rack Requirements.......................................................................................................18
Rack Space................................................................................................................18
Location in the Rack......................................................................................................19
Package Contents.........................................................................................................22
Chassis Installation Procedure......................................................................................23
Rack rail parts inventory ............................................................................................23
Install slide rails into the rack.....................................................................................24
Install the enclosure on the slide rails........................................................................26
Slide the enclosure into the rack................................................................................27
Install the cable management arm.............................................................................28
Electronic Emissions Notices........................................................................................31
Regulatory and Compliance..........................................................................................36
Notices..........................................................................................................................37
Copyright License:.........................................................................................................40
Trademarks...................................................................................................................41
Readers’ Comments......................................................................................................42

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 4
Safety
Before installing this product, read the Safety Information.
Antes de instalar este produto, leia as Informações de Segurança.
Læs sikkerhedsforskrifterne, før du installerer dette produkt.
Lees voordat u dit product installeert eerst de veiligheidsvoorschriften.
Ennen kuin asennat tämän tuotteen, lue turvaohjeet kohdasta Safety Information.
Avant d'installer ce produit, lisez les consignes de sécurité.
Vor der Installation dieses Produkts die Sicherheitshinweise lesen.
Prima di installare questo prodotto, leggere le Informazioni sulla Sicurezza.

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 5
Les sikkerhetsinformasjonen (Safety Information) før du installerer dette produktet.
Antes de instalar este produto, leia as Informações sobre Segurança.
Antes de instalar este producto, lea la información de seguridad.
Läs säkerhetsinformationen innan du installerar den här produkten
Safety Notices
These statements provide the caution and danger information used in this
documentation.
Important:
Each caution and danger statement in this documentation is labeled with a number.
This number is used to cross reference an English-language caution or danger
statement with translated versions of the caution or danger statement in the Safety
Notices Translation document (PN G229-9054).
For example, if a caution statement is labeled "D005," translations for that caution
statement are in the Safety Notices Translation document under "D005."
Be sure to read all caution and danger statements in this documentation before you
perform the procedures. Read any additional safety information that comes with your
system or optional device before you install the device.
D005
DANGER: When working on or around the system, observe the following precautions:

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 6
Electrical voltage and current from power, telephone, and communication cables are
hazardous. To avoid a shock hazard:
If IBM supplied the power cord(s), connect power to this unit only with the IBM provided
power cord. Do not use the IBM provided power cord for any other product.
Do not open or service any power supply assembly.
Do not connect or disconnect any cables or perform installation, maintenance, or
reconfiguration of this product during an electrical storm.
The product might be equipped with multiple power cords. To remove all hazardous
voltages, disconnect all power cords.
For AC power, disconnect all power cords from their AC power source.
For racks with a DC power distribution panel (PDP), disconnect the customer’s DC
power source to the PDP.
When connecting power to the product ensure all power cables are properly connected.
For racks with AC power, connect all power cords to a properly wired and grounded
electrical outlet. Ensure that the outlet supplies proper voltage and phase rotation
according to the system rating plate.
For racks with a DC power distribution panel (PDP), connect the customer’s DC power
source to the PDP. Ensure that the proper polarity is used when attaching the DC power
and DC power return wiring.
Connect any equipment that will be attached to this product to properly wired outlets.
When possible, use one hand only to connect or disconnect signal cables.
Never turn on any equipment when there is evidence of fire, water, or structural
damage.
Do not attempt to switch on power to the machine until all possible unsafe conditions
are corrected.
Assume that an electrical safety hazard is present. Perform all continuity, grounding,
and power checks specified during the subsystem installation procedures to ensure that
the machine meets safety requirements.
Do not continue with the inspection if any unsafe conditions are present.
Before you open the device covers, unless instructed otherwise in the installation and
configuration procedures: Disconnect the attached AC power cords, turn off the
applicable circuit breakers located in the rack power distribution panel (PDP), and
disconnect any telecommunications systems, networks, and modems.

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 7
DANGER:
Connect and disconnect cables as described in the following procedures when
installing, moving, or opening covers on this product or attached devices.
To Disconnect:
Turn off everything (unless instructed otherwise).
For AC power, remove the power cords from the outlets.
For racks with a DC power distribution panel (PDP), turn off the circuit breakers located
in the PDP and remove the power from the Customer's DC power source.
Remove the signal cables from the connectors.
Remove all cables from the devices.
To connect:
Turn off everything (unless instructed otherwise).
Attach all cables to the devices.
Attach the signal cables to the connectors.
For AC power, attach the power cords to the outlets.
For racks with a DC power distribution panel (PDP), restore the power from the
Customer's DC power source and turn on the circuit breakers located in the PDP.
Turn on the devices.
Sharp edges, corners and joints may be present in and around the system. Use care
when handling equipment to avoid cuts, scrapes and pinching. (D005)
C002
CAUTION: Only trained service personnel may replace this battery. The battery
contains lithium. To avoid possible explosion, do not burn or charge the battery.

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 8
Do not:
•Throw or immerse into water
•Heat to more than 100°C (212°F)
•Repair or disassemble
Exchange only with the approved part. Recycle or discard the battery as instructed by
local regulations. (C002)
C026
CAUTION: This product might contain one or more of the following
devices: CD-ROM drive, DVDROM drive, DVD-RAM drive, or laser module,
which are Class 1 laser products. Note the following information:
•Do not remove the covers. Removing the covers of the laser product
could result in exposure to hazardous laser radiation. There are no
serviceable parts inside the device.
•Use of the controls or adjustments or performance of procedures
other than those specified herein might result in hazardous radiation
exposure.
(C026)
IBM® servers can use I/O cards or features that are fiber-optic based and that utilize
lasers or LEDs.
Laser compliance
IBM servers may be installed inside or outside of an IT equipment rack.
All lasers are certified in the U.S. to conform to the requirements of DHHS 21 CFR
Subchapter J for class 1 laser products. Outside the U.S., they are certified to be in
compliance with IEC 60825 as a class 1 laser product. Consult the label on each part
for laser certification numbers and approval information.

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 9
CAUTION:
Data processing environments can contain equipment transmitting on system links with
laser modules that operate at greater than Class 1 power levels. For this reason, never
look into the end of an optical fiber cable or open receptacle. Although shining light into
one end and looking into the other end of a disconnected optical fiber to verify the
continuity of optic fibers many not injure the eye, this procedure is potentially
dangerous. Therefore, verifying the continuity of optical fibers by shining light into one
end and looking at the other end is not recommended. To verify continuity of a fiber
optic cable, use an optical light source and power meter. (C027)
CAUTION:
This product contains a Class 1M laser. Do not view directly with optical instruments.
(C028)
CAUTION:
Some laser products contain an embedded Class 3A or Class 3B laser diode. Note the
following information: laser radiation when open. Do not stare into the beam, do not
view directly with optical instruments, and avoid direct exposure to the beam. (C030)
CAUTION: To reduce the risk of electric shock or energy hazards:
This equipment must be installed by trained service personnel in a restricted-access
location, as defined by the NEC, IEC 60950 and IEC 62368, The Standard for Safety of
Information Technology Equipment.
(R001 part 1)
DANGER: Observe the following precautions when working on or around your IT rack
system:

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 10
•Heavy equipment–personal injury or equipment damage might result
if mishandled.
•Always lower the leveling pads on the rack cabinet.
•Always install stabilizer brackets on the rack cabinet unless the
earthquake option is to be installed.
•To avoid hazardous conditions due to uneven mechanical loading,
always install the heaviest devices in the bottom of the rack cabinet.
Always install servers and optional devices starting from the bottom
of the rack cabinet.
•Rack-mounted devices are not to be used as shelves or work spaces.
Do not place objects on top of rack-mounted devices. In addition, do
not lean on rack mounted devices and do not use them to stabilize
your body position (for example, when working from a ladder).
•Each rack cabinet might have more than one power cord.
oFor AC powered racks, be sure to disconnect all power cords in
the rack cabinet when directed to disconnect power during
servicing.
oFor racks with a DC power distribution panel (PDP), turn off the
circuit breaker that controls the power to the system unit(s), or
disconnect the customer’s DC power source, when directed to
disconnect power during servicing.
•Connect all devices installed in a rack cabinet to power devices
installed in the same rack cabinet. Do not plug a power cord from a
device installed in one rack cabinet into a power device installed in a
different rack cabinet.
•An electrical outlet that is not correctly wired could place hazardous
voltage on the metal parts of the system or the devices that attach to
the system. It is the responsibility of the customer to ensure that the
outlet is correctly wired and grounded to prevent an electrical
shock. (R001 part 1)
R007

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 11
CAUTION: Use safe practices when lifting.
L001
DANGER: Hazardous voltage, current, or energy levels are present inside any
component that has this label attached. Do not open any cover or barrier that contains
this label. (L001)
L002

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 12
DANGER: Rack-mounted devices are not to be used as shelves or work spaces. Do not
place objects on top of rack-mounted devices. In addition, do not lean on rack-mounted
devices and do not use them to stabilize your body position (for example, when working
from a ladder). (L002)
C010
(L003)
or or

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 13
or or
DANGER: Multiple power cords. The product might be equipped with multiple AC power
cords or multiple DC power cables. To remove all hazardous voltages, disconnect all
power cords and power cables. (L003)
Product Safety Notifications, Japan
(English translation: If this product comes with power cords, such cords should
be used exclusively for the applicable product, but not for other devices.)
(English translation: After providing the main product, if additional power cord is
required, the cord is handled for repair/maintenance/mending purpose.)

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 14
Publications
The following IBM documentation is available on the Safety and Regulatory CD included
with your Cloud Pak for Data System rack & components:
**** General Information Guides ****
•Rack Safety Information
•IBM Enterprise Slim Rack Safety Instructions
•IBM Safety Labels
•Unpacking Instructions
•Acoustical Caution Statement
•Environmental Notices and User Guide
•Important Notices
•IBM Systems Safety Notices translations Pub
**** Rack Install Guides ****
•Customer Install Guide, Rack and System 3458, 3459 (Appliance Racks)
•Customer Install Guide, Rack and System 3454-GEF, 3454-GEH, 3457-GEH
(Component Racks)
**** Component Specific Install Guides ****
•Customer Install Guide, 100G Switch 3454-CAC
•Customer Install Guide, 2U Chassis 3453-C2E (this document)
•Customer Install Guide, 1G Switch 3454-A3C
•Customer Install Guide, 25G Switch 3454-B8C 3454-C8C
•Customer Install Guide, Power Distribution Unit (PDU) 3454-FCE, FCG
•Customer Install Guide, 1U Chassis 3455-D3E
•Customer Install Guide, Connector Node 3453-F7E
**** Wiring Diagrams ****
•3454-GEF,GEH_3457-GEH Recommended Component Rack Power
Connections
•3458-3459 Appliance Rack Power Connections (Appliance racks ONLY)
These documents contain important safety and environmental information along with
specific installation instructions and specifications for the Cloud Pak for Data System
building blocks.
Specific part numbers for these documents are in the readme.txt file on the
included Safety and Regulatory CD.

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 15
Cloud Pak for Data System 2U chassis
description
The IBM Cloud Pak for Data Systems, 2U chassis is a Lenovo based, four-server
platform with integrated storage, processing and I/O. The chassis comes as a
pretested building block loaded with software. The base system utilizes two chassis,
but expansion chassis can be included with the initial deployment or at a later date.
The chassis is can be installed in an IBM Cloud Pak rack or a customer supplied rack
meeting the guidelines in the Customer Install Guide, Rack and System document
included on the Safety and Regulatory CD shipped with your Cloud Pak for Data
System components. Additional details can be found in the Site Prep Guide at the IBM
Cloud Pak for Data System site.
The chassis includes multiple cold air inlets used to draw in cold air from the front of the
rack. DO NOT BLOCK ANY INLET OR EXHAUST DUCTS, VENTS OR PORTS.
Blocked cooling access will adversely affect the performance of your Cloud Pak
for Data System and may void your warranty.
Power can be supplied by the available IBM Cloud Pak for Data System PDUs and line
cords or by customer supplied PDUs meeting the power requirements of the Cloud Pak
for Data System components.
If this is a customer install, IBM installation services will wire and power the system
once all racks, power and components are in place.
The front panel of the chassis provides the following components:
•LEDs that display the status of the chassis and storage
•Access to four, hot swappable blade-based nodes that contain processing and
hot swappable storage.
The rear panel of the chassis provides the following components:
•Two redundant hot-swap power supplies (1x IEC 320 C14 connector on each
power supply)
•Fabric and management ports.
•Hot swappable, fabric connected I/O cards

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 16
Cloud Pak for Data System 2U chassis
hardware specifications
Hardware specifications below provide information for the Cloud Pak for Data System
2U chassis, including dimensions, electrical power and cooling. .
All component installation documents are available on the Safety and Regulatory CD
that comes with your Cloud Pak for Data System components.
3453-C2E, Cloud Pak for Data System (2U server chassis) [see Notes 1, 2]
Table 1
Width
Depth
Height
EIA
units
Weight
Amperage
(Max)
Power
(Max)
Cooling
(Max)
488 mm
(19.3 in)
891.5 mm
(35.1 in)
87 mm
(3.5 in)
2
55 kg
(121.2 lb)
10 amps
2000
watts
6800
BTU/Hr
Notes:
[1] The power supplies automatically accept any voltage within the 200-240 V AC,
50/60 Hz rated-voltage range. If dual power supplies are installed and operating, the
power supplies draw approximately equal current from the utility (electrical supply) and
provide approximately equal current to the load.
[2] Power draw and heat load vary greatly by configuration and workload. When you
plan for an electrical system, it is important to use the maximum values but actual power
and cooling will be less.

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 17
Operating Environment
Cloud Pak for Data System components are designed to work together as a system in
an ASHRAE A2 environment. .
Table 2: Operating Environment
Environment
Recommended
operating
Allowable
operating
Nonoperating
ASHRAE
A2
Airflow Direction
Front-to-back
Temperature
18C –27C (61F -
80F)
10C –35C (50F-
95F) [1, 5]
5C –45C (41F –
113F)
Humidity
25% - 60%
noncondensing [2,
4]
20% - 80%
noncondensing [2,
4]
8% - 85% [4]
Maximum
Operating Altitude
3050m (10,000 ft)
[1]
Shipping
Temperature
-40C –60C (-40F –
140F) [3, 4]
Shipping relative
humidity
8% - 90% [4]
[1] Derate maximum allowable dry-bulb temperature by 1C (1.8F) per 300m (984 ft)
increase in altitude above 950m (2,953 ft)
[2] Maximum dewpoint 21°C (70°F)
[3] Short term temperature only for servers with SSDs
[4] Unit must acclimate to data center environment before unboxing to prevent
condensation.
[5] PDUs do not have fresh air cooling and can function in 60C (140F) environments

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 18
Rack Requirements
This section provides information on the space requirements for the rack which will
house the Cloud Pak for Data System Components.
Rack Space
Ensure that the rack in which you plan to install the system meets the space
requirements outlined in the following figure:
Figure 1: Top down view of installed chassis with 4-point horizontal mounting

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 19
Location in the Rack
The base IBM Cloud Pak for Data System consists of four main components (1G
switch, 25G switch, two compute chassis) that are designed to be integrated in the
same rack with PDUs. The recommended component placement is shown in Figure 2
below. Other configurations can be used if IBM Safety Notices translations Pub # G229-
9054 rules are followed, and the lengths of the supplied cables are not exceeded. The
Cloud Pak for Data System requires all IBM supplied and serviceable components
to be installed below the 42U height. Components on slides, such as server
chassis and connector nodes, must be located at or below U26.
Figure 2. Front view of installed base Cloud Pak component locations.
42
4U Blank Panel
41
40
39
38
2U Blank Panel
37
36
2U Blank Panel
35
34
PDU # 2 Right Power
33
Left Power PDU # 1
32
2U Blank Panel
31
30
1U Blank Panel
29
1U Blank Panel
28
1G Switch
27
1U Blank Panel
26
1U Blank Panel
25
25G Switch
24
1U Blank Panel
23
1U Blank Panel
22
1U Blank Panel
21
1U Blank Panel
12
1U Blank Panel
11
1U Blank Panel
10
1U Blank Panel
9
1U Blank Panel
8
1U Blank Panel
7
1U Blank Panel
6
Chassis 2
5
4
1U Blank Panel
3
Chassis 1
2
1
1U Blank Panel
Labeled “MGT1A”
Labeled “FAB1A”
Labeled “2”
Labeled “1”

© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 20
•Chassis #1 - Install this 2U server (marked #1) one rack unit (1U) above the
bottom of the rack.
•Chassis #2 - Install this 2U server (marked #2) 1U above Chassis #1.
•25G Switch - The 25G switch (marked # 3) should be installed above the top-
most server. You may install the 25G switch in any convenient location. (see
Figure 2 for recommended switch location, U25)
•1G Switch - The 1G switch (marked # 4) should be installed above the 25G
switch. You may install the 1G switch in any convenient location. (see Figure 2
for recommended switch location, U28)
•PDUs –Install horizontally at U33/U34 for easy cable routing and service access.
Additional PDUs should be installed above the PDUs at locations U35/U36.
•Other components should be installed per the specific install guide included with
those components.
Installation Notes:
•Server nodes are preconfigured for their specific slots (1, 2, 3 & 4) in the
chassis and they must not be removed from the chassis during the chassis
installation process.
Figure 3: Node locations in chassis and chassis marking
•If you intend to expand your system, you may want to leave enough space
to install additional expansion chassis and switches at a later date. Expansion
chassis and switches are ordered separately. Expansion chassis and switches
can be racked in any order, but the preferred locations are shown in Figure 3.
•Expansion chassis are marked “EXPANSION”.
•The base system 25G switch is marked #3 and the base system 1G switch is
marked #4. Expansion switches are marked “EXPANSION”.
Table of contents
Other IBM Chassis manuals
Popular Chassis manuals by other brands

Cisco
Cisco Firepower 4100/9300 quick start guide

Aaeon
Aaeon UP2 EP-CHUPSMTVAUPS quick start guide

National Instruments
National Instruments PXIe-1092 installation guide

F5
F5 ARX 6000 Hardware installation guide

National Instruments
National Instruments PXI Express Series user manual

Viglen
Viglen IX2000 user guide