Mounting Internal Rack Components ...............53
Determine Your Next Step ...................54
Attach the Rack to a Concrete (Non-Raised) Floor ............55
Attaching the Rack to a Short or Long Raised Floor ...........59
Appendix E. Installing Multiple pSeries 690s To One Hardware Management
Console .........................65
Installing the 8-Port ASYNC Adapter.................65
Connect the Serial Cables from the pSeries 690 to the 8-Port ASYNC Adapters 66
Installing the 128-Port ASYNC Adapter ................67
128-Port ASYNC Adapter Line Connectors .............67
Setting a RAN Node Number ..................68
Configuring the 128-Port ASYNC Adapter ..............69
Updating the Device Driver...................71
Connect the Serial Cables from the pSeries 690 to the 128-Port ASYNC Adapters 71
Verify Installation is Complete by Using the HMC Interface .........72
Appendix F. System Records ..................75
Record the Identification Numbers .................75
Record System - CPU, Memory, and I/O Configuration ..........77
Verify that All Hardware is Present .................81
Appendix G. Subsystem Positioning and Cabling ...........83
Operator Panel Cable and Diskette Drive Cable to the Media Subsystem (rear view) 83
I/O Subsystem Positions, Fully Populated Primary and Secondary Rack
(rear view without IBF) ....................84
I/O Subsystem Positions, Fully Populated Primary and Secondary Rack (rear view
with IBFs).........................85
Placement of Subsystem 4 in a Two-Rack Configuration
(rear view with IBF) .....................86
I/O Subsystems (1 Through 4 Without IBFs) RIO Cabling to I/O Books .....87
I/O Subsystems (5 and 6) RIO Cabling to the Secondary I/O Book ......88
I/O Subsystems (7 and 8) RIO Cabling to the Third I/O Book ........89
I/O Subsystem (1 through 3 with IBFs) RIO Cabling to I/O Books .......90
RIO Cable to I/O Subsystem (4 through 6) with IBFs Installed ........91
I/O Subsystems (7 and 8) RIO Cabling to the Third I/O Book ........92
Power and SCSI Cables to the Media Subsystem ............93
Hardware Management Console for pSeries (HMC) to the Primary I/O Book . . . 94
Appendix H. Cabling Information .................95
Power Cabling ........................95
RIO Cables and I/O Power Cables .................97
Appendix I. Service Processor Setup and Test ............101
Service Processor Setup Checklist .................101
Testing the Setup ......................102
Testing Call-In ......................102
Testing Call-Out ......................103
Serial Port Configuration ...................103
Contents v
|
||||||||||||||||||||
||