
6
2
V
RU MU
RP MP RC
AF
AC
INSTALLATORE
USERMAINTENANCE TECHNICIAN
TECHNICAL DATA
1.4 HYDRAULIC CONNECTION.
Before making the connections, all of the system piping must be
washed thoroughly to remove any residues that could compro-
mise the proper operation of the storage tank. Water connections
must be made in a rational way using the couplings on the stor-
age tank template. e storage tank safety valve outlet must be
connected to a draining funnel. If this is not the case, the storage
tank manufacturer declines any liability in the event of ooding
if the drain valve cuts in.
1.5 ELECTRICAL CONNECTION.
e storage tank has an IPX0D protection rating for the entire
appliance. Electrical safety of the appliance is reached only when
it is correctly connected to an ecient earthing system as specied
by current safety standards.
Attention: Immergas S.p.A. declines any responsibility for damage
or physical injury caused by failure to connect the storage tank to
an ecient earth system or failure to comply with the reference
standards.
Also ensure that the electrical installation corresponds to maxi-
mum absorbed power specications as shown on the storage tank
data-plate. e storage tank unit is supplied complete with an “X”
type power cable without plug.
Solar manifold probe connection.
Connect the solar manifold probe to pins 45 and 46 on the termi-
nal board (Fig. 15 part. 17) present inside the storage tank unit,
paying attention to eliminate the resistance R15 as indicated in
the wiring diagram.
Storage tank connection to the boiler.
Connect the storage tank to the boiler as indicated in the wiring
diagram, using a cable (not present) to connect clamps 36 and 37
to the boiler and to the storage tank.
Storage tank unit electric connection.
e power supply cable must be connected to a 230V ±10% / 50Hz
mains supply respecting L-N polarity and earth connection; ,
this network must also have a multi-pole circuit breaker with class
III over-voltage category. When replacing the power supply cable,
contact a qualied rm (e.g. the Authorised Aer-Sales Technical
Assistance Service).
Key:
V - Electrical connection
AC - 3/4” Domestic hot water outlet
RU - 3/4” return from storage tank
MU- 3/4” ow to storage tank
AF - 3/4” domestic cold water inlet
RP - 3/4” return to solar panels
MP - 3/4” ow from solar panels
RC - 1/2” recirculation (optional)
For the main power supply to the appliance, never use adapters,
multiple sockets or extension leads.
Solar collector return probe connection (optional).
Connect the solar collector return probe to pins 8 and 7 on the
terminal board present inside the storage tank unit.
Attention: aer the connections have bee made, the new system
layout must be set on the solar control unit as follows:
- press the “i” key for about 10 seconds;
- use the scrolling keys to nd parameter 27 (system congura-
tion);
- press the “i” key for about 2 seconds.
- upon accessing parameter 27, you will nd that conguration 1
is set; use the scrolling keys to select conguration 2.
- press the “i” key to conrm the selected conguration.
1.6 FILLING THE SYSTEM.
Once the storage tank has been connected, ll the system via the
boiler lling valve. Filling is performed at low speed to ensure
release of air bubbles in the water via the boiler and central heat-
ing system vents.
Close the lling valve when the boiler manometer pointer indicates
approx. 1.2 bar (see boiler instruction book).
1.7 DOMESTIC HOT WATER STORAGE TANK UNIT.
e storage tank unit must be connected to a boiler. It contains
large coiled stainless steel heat exchanger pipes, which allow to
notably reduce hot water production times. is storage tank unit,
manufactured with stainless steel casing and bottoms, guarantees
long duration through time.
e assembly concepts and welding (T.I.G.) are implemented to
the minimum detail to ensure maximum reliability.
e upper inspection ange ensures practical control of the stor-
age tank unit and the coil heat exchanger pipe and easy internal
cleaning.
e DHW couplings are positioned on the lid of the ange (cold
inlet and hot outlet). e Magnesium Anode holder cap including
the same, supplied as per standard for the internal protection of
the storage tank from possible corrosion, is found on the side of
the storage tank.
1.3 CONNECTION UNIT.