Instant Upright Span 500 User manual

Span 500, 500B, 500X
Advance Guard Rail System
Instruction Manual
DESIGNATION
SPAN 500 AGR Double Width
EN 1004 – 3 — 8/12 — XXXD
SPAN 500 AGR Single Width
EN 1004 — 3 — 8/8 — XXXD
CEN designation of this instruction manual
EN 1298 — IM — en
Rev-01

01
ASSEMBLY PROCESS
1. Preparation
• Locate the tower level adjusters on each leg at 10cm
(4 inches) from the bottom of the leg.
• Unlock the interlock clips on all frames.
• When installed, always move the interlock clip to the
“locked” position.
• Sort the braces into horizontal and diagonal braces -
the diagonals are slightly longer.
• Unlock the brace locks.
2. Base
Step 1: Install castor into adjustable leg.
Step 2: Ensure interlock clips are released from the base
frames (bottom frames)..
Step 3: Install castor / leg assembly to frame by pushing
the leg into the frame tube. This should be done
with manual force only, no tools.
Step 4: Lock castors before ascending any part of
the tower.
3. Locking down the platform (Windlock)
A windlock clip is installed on the platform at the hook.
This is locked as shown here.
SAFE WORKING LOADS AND WORKING HEIGHTS
The safe working load at each level of platform is 275kg evenly distributed, regardless of whether one or two
platforms are installed. Therefore, even if two platforms are installed side by side, total cumulative load shall not
exceed 275kg distributed.
The total loading on the tower structure should not exceed 720kg. Normal maximum platform height for indoor
use is 12m for Double Width, and 8m for Single Width. For outdoor use, the maximum height is 8m for Single and
Double Widths.
WARNING
NEVER STAND ON AN
UNGUARDED PLATFORM
Note the locking and unlocking position
for the castors as shown here.
Unlocked Locked
Unlocked Locked
Unlocked
Locked
Unlocked
Locked
10cm

02
USAGE ADVICE
• We recommend a minimum of two people to assemble, dismantle and move the platform tower.
• Check that all components are on site and in good working order.
• Ensure that the assembly location is checked to prevent hazards during assembly, dismantling or moving
and while working on the tower. Particular attention should be given to the ground condition, whether level
or sloping, obstructions and wind conditions. The ground condition must be capable of supporting the tower
structure.
• Towers must always be climbed from the inside of the assembly using the ladder.
• Adjustable legs must only be used to level the tower.
• If the adjustable legs are to be extended by more than 150 mm; a risk assessment needs rst to be undertaken
by a competent person.
• Lifting of components must be done inside the effective base area of the tower; components are normally
hoisted using a rope.
• Moving the tower must only be done by manual effect from the base of the tower.
• When moving tower be aware of overhead hazards (e.g. electric cables).
• No personnel or material to be on the platform whilst the tower is being moved.
• Beware of horizontal loads which can lead to instability of the tower. The maximum side force is 20kg.
• When tying-in the tower, attach a tie to each upright at 4m height intervals. Ensure that couplers are suitable for
50mm diameter aluminum tube.
• Do not use boxes or steps to gain additional height. If extra height required, contact your distributor to get extra
components.
• Do not lift or suspend an assembled mobile tower.
• Damaged components or components from other tower systems must never be used.
• Stabilisers should always be tted when specied. Use the stabiliser shown on the component list according to
the tower height.
• When wind exceeds Beaufort force 4, cease using the tower.
• If wind is expected to reach Beaufort force 6, tie tower to a rigid structure.
• If winds of Force 8 are forecast, dismantle the tower or remove to shelter.
CARE AND MAINTENANCE
• Keep all equipment clean, especially spigots and sockets where frames join. Spigots should t easily into
sockets. Lubricate with light oil.
• Remove dirt or paint from adjustable legs with a light brush, lightly oil the leg locks.
• Do not strike or hammer components. Do not throw or drop onto hard surfaces.
• Lightly oil spring mechanism of the hooks.
• For transport and storage, components are best stored vertically.
• Damaged parts must be repaired or replaced; refer to the Instant Upright website for further advice or contact
your equipment supplier for advice.
Wind speeds
Force Peak mph Peak km/h Peak m/s Guidance
4 18 29 8.1 Moderate breeze - raises dust & loose paper
631 50 13.9 Strong breeze - difcult to use umbrella
848 74 20.8 Gale force - walking is difcult

03
MOVING AGR TOWERS
To Move the tower to a new position, first prepare the tower.
ADVANCE GUARD RAIL (AGR) FITTING
AGR-1
AGR-3
AGR-2
AGR-4
• Check that the wind speed does not exceed 29km/h (8.1m/s).
• Ensure the tower is empty (material and personnel).
• Check for overhead obstructions including electrical cables.
• Raise the stabiliser feet (only enough to clear obstructions).
• Taking care to ensure tower stability is maintained, insert any extended adjustable legs completely into
the frame.
• Release the castor brakes.
• Carefully move the tower by manually applying force at the base. Do not use mechanical means to move
the tower.
• Once positioned prepare the tower for use.
• Check and adjust as necessary to ensure all castors and stabilisers are in rm contact with the ground.
• Check that the tower is vertical using a spirit level.
• Reapply the castor brakes.

04
STABILISERS
Stabilisers are to be used, when specified, to guarantee the structural stability of the tower.
ALWAYS ENSURE STABILISER SIZE IS CORRECT AND ABLE TO
SUPPORT TOWER
Lightly tighten the upper clamps above the sixth rung on each corner post. Position the lower clamp
above the bottom rung. Ensure the lower arm is as horizontal as possible. Position the stabilisers so that the
footpads are approximately equidistant from each other, as shown in Fig.2. Adjust the stabiliser and reposition the
clamps as required to make firm contact with the ground. Ensure the clips with locking pin are in place. When in the
correct position, tighten the clamps firmly.
To position the tower against a wall, do not remove the stabiliser; move parallel with the wall. (Fig.3)
To position the tower in a corner, remove the inside stabiliser and place the outside two parallel with the wall. (Fig.4)
Fig 2 Fig 3 Fig 4

05
SPECIFIC PRODUCT INFORMATION
Table of parts and quantities
Span 500 AGR Double Width Towers - 2m, 2.5m and 3m lengths to EN1004 and WAHR
Platform Height (m) 2m 4m 6m 8m 10m 12m
Work Height (m) 4m 6m 8m 10m 12m 14m
Tower Height (m) 3m 5m 7m 9m 11m 13m
Tower Weight in kg (2m length) 132 198 264 336 403 469
Tower Weight in kg (2.5m length) 145 220 296 378 454 529
Tower Weight in kg (3m length) 156 239 321 411 494 577
Note: Quoted platform heights included 150mm leg adjustment for levelling that can be increased or reduced
Description Weight (kg)
4 Rung Ladder Frame 12.1 123456
4 Rung Frame 8.822 3 456
Trapdoor Platform (2m, 2.5m, 3m) 14 18 20 1 2 3 4 5 6
Fixed Platform (2m, 2.5m, 3m) 14 17 20 1 2 3 4 5 6
Horizontal Brace (2m, 2.5m, 3m) 1.7 2 2.4
Diagonal Brace (2m, 2.5m, 3m) 1.8 2.2 2.5 2
Advance Guardrail (2m, 2.5m, 3m) 7 8 9 2 4 6 8 10 12
Telescopic Stabiliser 5.2 4 4 4
Large Stabiliser 6.8 4 4 4
Adjustable Legs 1.1 4 4 4 4 4 4
Castor / Baseplate 2.8 444444
Toe-board set (2m, 2.5m, 3m) 8.7 11.5 14.4 1 1 1 1 1 1
22222
222222
2 Rung Ladder Frame 9.3 111111
2 Rung Frame 7.6 111111

06
DOUBLE-WIDTH TOWER 6m
1
3
5
2
4
6
78

07
9
11
10
12
DOUBLE-WIDTH TOWER 6m
13 14
15

08
SPECIFIC PRODUCT INFORMATION
Table of parts and quantities
Span 500 AGR Single Width Towers - 2m, 2.5m and 3m lengths to EN1004 and WAHR
Platform Height (m) 2m 4m 6m 8m
Work Height (m) 4m 6m 8m 10m
Tower Height (m) 3m 5m 7m 9m
Tower Weight in kg (2m length) 105 152 199 252
Tower Weight in kg (2.5m length) 114 167 220 280
Tower Weight in kg (3m length) 120 178 235 299
Note: Quoted platform heights included 150mm leg adjustment for levelling that can be increased or reduced
Description Weight (kg)
10.5 1234
7.2 1 2 3 4
Trapdoor Platform (2m, 2.5m, 3m) 14 18 20 1 2 3 4
Horizontal Brace (2m, 2.5m, 3m) 1.7 2 2.4 1 1 1 1
Diagonal Brace (2m, 2.5m, 3m) 1.8 2.2 2.5
Advance Guardrail (2m, 2.5m, 3m) 7 8 9 2 4 6 8
Telescopic Stabiliser 5.2 4 4 4
Large Stabiliser 6.8 4
Adjustable Legs 1.1 4 4 4 4
Castor / Baseplate 2.8 4 4 4 4
Toe-board set (2m, 2.5m, 3m) 6.8 8.4 9.8 1 1 1 1
1111
4 Rung Ladder Frame
4 Rung Frame
2 Rung Ladder Frame
2 Rung Frame
1
1
1
1
1
1
1
1
3.8
2.1

09
SINGLE-WIDTH TOWER 6m
1
3
5
2
4
6
78

10
9
11
10
12
SINGLE-WIDTH TOWER 6m
13 14
15
This manual suits for next models
2
Table of contents
Other Instant Upright Ladder manuals
Popular Ladder manuals by other brands

Confer Plastics
Confer Plastics 7000 Assembly instructions

Fontanot
Fontanot Zen 2 Tube Assembly instructions

Fiamma
Fiamma DELUXE SPRINTER Installation and usage instructions

GORILLA LADDERS
GORILLA LADDERS GLMPXA-14 Operating/safety instructions

POP UP
POP UP X PRO instructions

Safelincs
Safelincs EvacSill user manual

Stockmaster
Stockmaster Navigator User instructions

GÜNZBURGER STEIGTECHNIK
GÜNZBURGER STEIGTECHNIK 40630 operating instructions

Stromberg Carlson Products
Stromberg Carlson Products LA-401 quick start guide

GIERRE
GIERRE Scalamia ALU125 manual

PVI
PVI XP3 manual

Rivers Edge
Rivers Edge RE659 Operator's manual