3.4 Connect the cable of IQAio at the back. Then hang the IQAio directly on fixed bracket from top to bottom.
3.5 Connect the mother cable on the back of green board with the extended cable of IQAio and then hang the green
board on the fixed bracket.
3.6 Adjust the gap between IQAio and green board and keep in the same horizontal.
3.7 After confirming the proper position, fix four fixed brackets with four M4*16 round head screws with gasket. The installation is
complete.
3.8 If want to adjust the position again, put four M4*16 round head screws into the four mounting brackets (without fixed). Then
use M6*10 round head screw to adjust the position and fix the four M4*16 round head screws later. The installation is
complete.