
Page 7 of 12
Assembly Instructions
Tools Required
Adjustable wrench or pliers.
Electric drill.
3/8 in. or 3/16 drill bits
Step 1: Assembly (Factory Assembled for Right Handle use)
1. Mount the crank handle (3) on the crank column (1) using the washers shown (2). Fasten in
place with nut (6). Make sure that the crank handle has been tightened securely. (Figure 1.)
2. Install the leader hose (12) to the brass connector (15). Ensure the rubber washer (13) is in
position inside the connector. Tighten. (Figure 2)
Step 2: Mounting
The hose reel can be mounted on brick/masonry or a wood-stud wall.
To mount on a brick/masonry wall:
1. Place the mounting bar of the reel frame (11) on the wall and mark the location of the bracket
holes.
2. Drill holes 3/8 inch (9.5 mm) in diameter and 2 inches (50 mm) deep.
3. Insert the masonry wall anchors (8) in the drilled holes until the steel sleeve is completely in the
wall. (Figure 3.)
4. Place the hose reel onto the masonry wall anchors.
5. Place a washer, spring washer, and nut (9) over each masonry wall anchor and tighten.
To mount on a wood wall:
1. Place the mounting bar of the reel frame (11) on the wall making sure that the bracket holes are
located on studs.
2. Drill holes 3/16 inch (4.7 mm) in diameter and 2-1/4 inches (57 mm) deep.
3. Align the bracket holes with the pilot holes and secure with 3/16 inch diameter lag screws (not
included).
Wall
Spring
washer
Washer
Nut
Anchor
Figure 3
Figure 2Figure 1