
3
REPEAT THIS FOR THE REMAINING 4 FIBERGLASS ROOF POLES.
ENSURE CARE IS TAKEN DURING THIS PROCEDURE, NOT TO ALLOW THE ENDS OF THE
SHOCKCORDED POLES TO DAMAGE SLEEVES OR FLYSHEET MATERIAL.
TAKE ONE OF THE ASSEMBLED METAL MAIN POLE UPRIGHTS AND CHOOSING ONE
SIDE OF THE ROOF POLE ENGAGE THE FERRELLED END INTO THE OPEN END OF THE
METAL ANGLE BRACKET ON THAT SIDE.
THE BASE OF THE UPRIGHT POLE THEN ENGAGES ONTO THE RING AND PIN FIXTURE.
THIS WILL BE LOCATED AT THE BASE OF THE FLYSHEET,NEAR TO THE SEAM
RUNNING DOWN FROM THE SLEEVE IN WHICH THE POLE IS LOCATED. EACH POLE
RETAINING FIXTURE WILL HAVE A METAL RING WITH ONE OR MORE RETAINING PINS
ATTACHED TO IT ( DEPENDANT UPON MODEL ). THE RETAINING PIN IS DESIGNED TO
SLIDE UP INSIDE THE PLASTIC POLE END BUNG THUS SECURING THE POLE INTO
PLACE.
PLEASE ENSURE THAT THE ROOF SLEEVE IS NOT TRAPPED OR CAUGHT OVER THE
UPPER END OF THE METAL ANGLED POLE. THE UPPER END OF THE METAL ANGLED
POLE SHOULD BE INSERTED FULLY INTO THE ROOF POLE SLEEVE BEFORE
ATTEMPTING TO LOCATE THE LOWER END ONTO THE RING AND PIN.
PLEASE NOTE THAT THE ADJUSTABLE WEBBING STRAPS ATTACHED TO THE RING AND PIN
SHOULD BE SLACKENED OFF BEFORE INSERTING THE PIN INTO THE POLE. AFTER
LOCATING THE PIN, ADJUST THE STRAP WITHOUT OVER TIGHTENING. AGAIN ENSURE THE
ROOF POLE SLEEVE IS NOT CAUGHT OVER THE METAL POLE END BEFORE TIGHTENING
THE ADJUSTABLE STRAP..
USING A FURTHER METAL MAIN POLE UPRIGHT REPEAT FOR THE OPPOSITE SIDE.
RUNNING DOWN THE SEAM, FROM THE SLEEVE, ON EACH SIDE OF THE TENT YOU
WILL NOTICE THREE FLYSHEET TO MAIN POLE WEBBING CLIPS. ALL THESE, SHOULD
SIMPLY BE CLIPPED TO THE METAL MAIN POLES ALLOWING THE FLYSHEET TO TAKE
FULL SHAPE. PLEASE NOTE THAT THESE ARE NOT INTENDED AS GUY POINT FIXINGS.
THEN LAY THE ASSEMBLED POLE SECTIONS AND FLYSHEET DOWN ON THE GROUND.
THE FLYSHEET TO MAIN POLE WEBBING CLIPS ARE NOT PRESENT ON THE SMALL
DOOR PORCH OF YOUR TENT.
5: TAKING THE REMAINING METAL MAIN POLE UPRIGHTS AND THE SECOND, THIRD
FORTH AND FIFTH ROOF POLES SEPARATELY REPEAT POINT 4. IT IS BEST TO START
AT ONE END OF THE FLYSHEET AND WORK TOWARDS THE OPPOSITE END OF THE
TENT.
DURING BOTH POINTS 4 & 5 ENSURE THAT THE POLE JOINING FERRULES AND METAL
POLE ENDS DO NOT CATCH ON THE INSIDE OR EDGE OF THE MATERIAL SLEEVES.
SHOULD THIS HAPPEN CAREFULLY FREE THE SLEEVE BEFORE CONTINUING. FAILURE TO
FREE THE SLEEVE MAY CAUSE THE MATERIAL TO TEAR AND OR STITCHED SEAMS TO
BURST.
6: THE FLYSHEET SHOULD NOW BE READY FOR PEGGING. POSITION THE FLYSHEET ON
THE GROUND SO THAT ONE OF THE ENDS WITH THE GUY OUT VENT PANELS IS
FACING INTO THE PREVAILING WIND. IT CAN BE USEFUL AT THIS POINT TO
TEMPORARILY PEG THE GUY ROPES ON THIS END OF THE TENT TO THE GROUND
BEARING IN MIND THAT THEY MAY NEED TO BE REPOSITIONED LATER. PLEASE
ENSURE THAT IF THESE GUY ROPES ARE PEGGED THERE IS SUFFICIENT LENGTH IN
THE GUY ROPE TO ALLOW THE MAIN POLES TO BE POSITIONED UPRIGHT.
OPEN BOTH DOOR ZIPS ON THE FLYSHEET AND USING THE PEGS PROVIDED PEG THE
MAIN TWO CORNERS OF THE END THAT’S FACING INTO THE WIND, TO THE GROUND.
TAKE THE TWO MAIN PEGGING POINTS ON THE OPPOSITE END AND PULL THE