
2 2P05-PCR-LE
Handling Precautions
Handling of the U and V phase Boards
• Ground yourself by touching a grounded metal object before
touching the board.
• Avoid handling the interface board in an environment subject to
strong static electricity.
• For storage, provide electrostatic protection measures such as
the anti-static bag accompanying the interface board.
• Do not drop a board or subject it to other impact.
• Do not install or uninstall the interface board with the power ON
of the PCR-LE Series.
Handling of the connecting and drive-sync cable
• Do not damage the cable.
• Do not pull, bend, or apply any other stress to the cable.
Precautions When Moving the PCR-LE
Disconnect the cable(s) when moving the PCR-LE series to the
installation location or when transporting the PCR-LE. Moving a
PCR-LE series with a cable connected to the phase board may
result in breakage of the cable or connector.
Installing the board on the PCR-LE
The 2P05-PCR-LE can be installed by inserting the U and V phase
boards into SLOT1 of the two PCR-LE series, respectively.
1
Check that the POWER switch of PCR-LE is o.
2
Touch a grounded metal object (for example, the
metal parts of the PCR-LE rear panel) to discharge
any static electricity from your body.
3
Remove the screws that are holding the SLOT 1
cover in place on the rear panel, and remove the
cover from the panel.
4
Hold the panel parts of the board so that the printed
circuit board side is facing up.
5
Insert the board into the slot so that the printed cir-
cuit board's connector is inserted into the connec-
tor at the back of the slot.
6
Insert the board all the way into the slot.
7
Use the screws that you removed in step 3 to x the
board in place in the panel.
8
Follow the same procedure to install the other
board.
This completes installation of the phase board.
When a 2P05-PCR-LE has been inserted into the slot1 of a PCR-
LE series, that power supply can be used only in a single-phase,
three-wire system. To use the power supply in a single-phase sys-
tem, the phase board must be removed from the slot1.
Connecting the Boards
Use the connecting cable to connect the U phase board and the
V phase board.
J1 connector
1PHASE
-
3WIRE DRIVER 2P05
-
PCR
-
LE
J1
1
Check that the POWER switch of PCR-LE is o.
2
Place the two PCR-LE as close to each other as pos-
sible.
Arrange them so that no stress is applied to the connecting
cable.
A PCR-LE power supply with the U-phase board installed
plays the role of the master unit that controls another power
supply. It is recommended that the PCR-LE with the installed U
phase board be placed where it is easily accessible for opera-
tions.
3
Connect the J1 conectors of U-phase unit and the V-
phase unit rmly with the connecting cable using a
screwdriver.
Do not remove the attached core from the cable. If you do,
reattach it (be sure to wrap the cable around the core once (2
turns)).
This completes connection of the boards.
Operation Check
Check the operation of the PCR-LE series before you perform
single-phase, three-wire operation.
Check the following items with no load connected. For detail of
settings, see the PCR-LE series operation manual.
POWER switch ON
Voltage setting
OUTPUT ON/OFF
Voltage-range switching
If a trouble is occurring on even one unit, you will not be able to
perform single-phase, three-wire operation.