・Always connectto anoutlet withgrounding electrodein
orderto preventelectrostatic chargingofthe wholeunit
andtomakeuseoffullperformanceoftheIonizer.
・Whenusinganoutletwithoutgroundingelectrode
unavoidably,alwaysuseF.G.screw(M3)locatedbeside
theducttoconnectforgrounding.Checktoensurethat
theleadwireforgroundingisnotdamaged.
4-1. Precautions on Installation of the ION WIPER
・ UsetheION WIPERindoors. Forinstallationofthe unit,care shouldbetakentothe
contaminationbyoilorwater,hightemperatureandhighhumidity.
・Especially,avoidaplacesubjecttodewcondensation.
・Installtheunitonasolidandflatsurfacesuchasaworkingbench.Avoidunstableplaces.
・PreventtheinstalledmetalcapoftheIonizerfromcontactingitsmetalframe,etc.
4-2. Exhaust Duct Takecarewithfan.
-14 -
4. Installation, Wiring and Tubing
4-3. Power Supply
・Apply100VAC(50/60Hz)forpowersupplyoftheunit.
4-4. Wiring for Grounding
φ76.3
Note:WhenusedwithdefectivegroundingoftheION
WIPER,static charge elimination anddust removal
performancewilldegrade.
F.G.(M3)
4-5. Air Tubing
・Useurethaneornylontubewithouterdiameterofφ8for
airtubingtotheIONWIPER.
・TheIONWIPERisdesignedtoremovedustaccumulated
onthe workpiece (chargedobject). Supplyclean air that
passesthroughadryerorfilter.
ConnectionPort
forAirtubing
(φ8quickfitting)
・ Outerdiameteroftheexhaustductisφ76.3.Caution
shouldbeexercisedforexhaustresistancewhen
connectingsuchasexhausthoses.(Recommended
nominaldiameteroftheexhausthose:φ75)
DTY-WCM-□ hasa blowerfaninside the duct. Be
carefulnottobeinjuredbythefanordamageofthe
fan.
4-6. Installation of Expanded Metal
・Installtheexpandedmetalfromthefrontsideofthemain
bodyasshowninthepicture.Aligncutoutportionofthe
expandedmetal(oneplaceforA4,twoplacesforA3)with
thetopofthe
photoelectric
switch.
Handletheexpandedmetalcarefullyasthecutsection
isverysharp. Expandedmetal