Stairlift ALPHA Installation Manual Edition March 2014
ALPHA stairlift page 2 of 14
Observe the following points before installation!
Installation teams must have a general knowledge in:
working on electric controls
basic mechanical engineering and providing adequate fixation of the rails and pillars
reading and understanding circuit diagrams and wiring schematics
The following points are necessary for the installation:
Have a complete tool kit on hand for mechanical and electrical works
Check beforehand what fixing materials (screws, anchor bolts, adhesives) are
required for the proper fixing of the rails to the wall or the pillars to the floor. These
materials are not included in the delivery! The installation company is responsible
for the fixing of the rail to the wall or the pillars to the floor/steps!
Check the packages for shipping damage and missing parts before bringing the lift
to the site. Take pictures of damaged parts as soon as these are discovered to
provide proof for warranty claims.
A team of 1 qualified technician and an assisting technician is necessary to install
the lift.
Beginning the Installation
Bring the platform to the upper landing before fixing the rails in order to prevent damage to
the rail and platform during transport on the staircase! The platform can only be engaged
from the upper end of the rail.
The following tools will be required to finish the installation successfully:
A complete toolset for
mechanical and electrical works
Voltmeter
Drilling machines
Drills, thread cutter
Fixing material based on on-site
requirements
Spirit lever with angle indication