LSC POWERPOINT User manual

POWERPOINT
Power Distribution System
i
INSTALLATION and OPERATION MANUAL
Version V 1.02
Sept 2017
Document number: PWP-T01U-A2
LSC Lighting Systems (Aust) Pty. Ltd.
ABN 21 090 801 675
65-67 Discovery Road
Dandenong South, Victoria 3175, Australia
Tel: +61 3 9702 8000 Fax:+61 3 9768 2631
email: info@lsclighting.com
web: www.lsclighting.com

PowerPoint
Installation and Operation Manual
Page 2
1DISCLAIMER
LSC Lighting Systems (Aust) Pty. Ltd. has a corporate policy of continuous improvement, covering
areas such as product design and documentation. In light of this policy, some detail contained in
this manual may not match the exact operation of your product. Information contained in this
manual is subject to change without notice.
In any event, LSC Lighting Systems (Aust) Pty. Ltd. cannot be held liable for any direct, indirect,
special, incidental, or consequential damages or loss whatsoever (including, without limitation,
damages for loss of profits, business interruption or other pecuniary loss) arising out the use or
the inability to use this product for its intended purpose as expressed by the manufacturer and
in conjunction with this operating manual.
Servicing of this product is recommended to be carried out by LSC Lighting Systems (Aust) Pty.
Ltd. or its authorised service agents. No liability will be accepted whatsoever for any loss or
damage caused by service, maintenance or repair by unauthorised personnel.
In addition, servicing by unauthorised personnel may void your warranty.
LSC Lighting Systems’ products must only be used for the purpose for which they were
intended.
2Contents
1DISCLAIMER 2
2Contents 2
3Copyright Notices 2
4Product Description 2
4.1 About this Manual _________________ 2
4.2 Introduction______________________ 3
4.3 Features ________________________ 3
4.4 Front Panel ______________________ 3
5Setting Up and Connecting 3
5.1 Safety __________________________ 3
5.2 Unpacking _______________________ 3
5.3 Connections_______________________3
5.3.1 Input Power Supply _________________ 3
5.3.2 Power Outputs _____________________ 4
Troubleshooting 5
5.4 Maintenance ______________________5
5.5 Tripped Breakers___________________5
6Compliance Statements 6
6.1 RCM Compliance ___________________6
6.2 CE Compliance Statement____________6
6.3 C Tick Compliance Statement _________6
7Specifications 6
3Copyright Notices
PowerPoint units are developed by LSC Lighting Systems (Aust) Pty. Ltd.
www.lsclighting.com
Copyright © 2016 LSC Lighting Systems (Aust) Pty. Ltd.
All rights reserved.
Contents of this manual, Copyright © 2016
4Product Description
4.1 ABOUT THIS MANUAL
This manual describes the installation and operation of the PowerPoint power distribution unit
manufactured by LSC Lighting Systems.

PowerPoint
Installation and Operation Manual
Page 3
4.2 INTRODUCTION
PowerPoint is a simple-to-use power distribution unit with a 3-phase mains input (single-
phase input available) and either 6 or 12 single-phase outputs depending on the model.
Designed for applications wherever fixed or mobile power distribution is required, the
PowerPoint distribution rack offers a 4-pole mains input isolator switch with Neutral
Disconnect as standard and individual RCBO (RCD+MCB) per output channel. There are also
3 neon phase indicators to show power input to the rack.
Output circuit rating can be specified as either 10A, 16A or 25A and back-panel options
include either Australian GPO, Socapex, powerCON, Schuko, Wieland or terminal outputs.
4.3 FEATURES
•Twelve 10A, 16A or six 25A output circuits
•Individual RCD (30mA) protection for each output circuit –protection for users
•Individual circuit breaker for each output circuit
•Master isolator switch that also disconnects Neutral from output circuits
•Three neon indicators show state of input phase power
•Three-phase operation
•Single-phase operation possible
4.4 FRONT PANEL
12-Channel PowerPoint
5Setting Up and Connecting
5.1 SAFETY
All electrical work must be carried out by suitably qualified persons.
5.2 UNPACKING
Your PowerPoint is fully tested and inspected before leaving the factory. Upon delivery, inspect
the PowerPoint for signs of damage or mishandling. In the event of any damage, contact your
LSC agent.
5.3 CONNECTIONS
5.3.1 Input Power Supply
Always ensure that the Input Isolator is in the OFF position before connecting or
disconnecting the input power.
PowerPoint must be fed from a suitable external circuit breaker. The nominal input voltage is
110-240V, 3-phase Star (380-415V), 50-60Hz. Single-phase operation is possible but input
current must be limited to 63A in total.
Output Load RCBOs
Input Isolator
Input Phase
Presence Indicators
Input Phase Labels

PowerPoint
Installation and Operation Manual
Page 4
5.3.2 Power Outputs
Always ensure the Output Load RCBOs are in the OFF position before connecting or
disconnecting any loads.
The individual outputs are fed from the following input power phases. This input phase
numbering is also shown on the front panel below each output circuit breaker.
Input Phase
Output
Input Phase
Output
1
1
1
7
2
2
2
8
3
3
3
9
1
4
1
10
2
5
2
11
3
6
3
12
The following output connections are available (12-channel PowerPoint shown):
Australian Outputs
Schuko Outputs
Installation Screw Terminals
Socapex Outputs
Connector #1
Function
Connector #2
Function
Pin 1
Chan 1 Active
Pin 1
Chan 7 Active
Pin 2
Chan 1 Neutral
Pin 2
Chan 7 Neutral
Pin 3
Chan 2 Active
Pin 3
Chan 8 Active
Pin 4
Chan 2 Neutral
Pin 4
Chan 8 Neutral
Pin 5
Chan 3 Active
Pin 5
Chan 9 Active
Pin 6
Chan 3 Neutral
Pin 6
Chan 9 Neutral
Pin 7
Chan 4 Active
Pin 7
Chan 10 Active
Pin 8
Chan 4 Neutral
Pin 8
Chan 10 Neutral
Pin 9
Chan 5 Active
Pin 9
Chan 11 Active
Pin 10
Chan 5 Neutral
Pin 10
Chan 11 Neutral
Pin 11
Chan 6 Active
Pin 11
Chan 12 Active
Pin 12
Chan 6 Neutral
Pin 12
Chan 12 Neutral
Pin 13
Earth
Pin 13
Earth
Pin 14
Earth
Pin 14
Earth
Pin 15
Earth
Pin 15
Earth
Pin 16
Earth
Pin 16
Earth
Pin 17
Earth
Pin 17
Earth
Pin 18
Earth
Pin 18
Earth
Pin 19
Earth
Pin 19
Earth
Connector 1
Connector 2
Output Channel
Number Chart
Green = On
Output Channel
Number Chart
Green = On
Output Channel
Labels
Green = On

PowerPoint
Installation and Operation Manual
Page 5
Wieland Outputs
Connector 1
Function
Connector 2
Function
Pin 1
Chan 1 Active
Pin 1
Chan 7 Active
Pin 2
Chan 2 Active
Pin 2
Chan 8 Active
Pin 3
Chan 3 Active
Pin 3
Chan 9 Active
Pin 4
Chan 4 Active
Pin 4
Chan 10 Active
Pin 5
Chan 5 Active
Pin 5
Chan 11 Active
Pin 6
Chan 6 Active
Pin 6
Chan 12 Active
Pin 7
Not used
Pin 7
Not used
Pin 8
Not used
Pin 8
Not used
Pin 9
Chan 1 Neutral
Pin 9
Chan 7 Neutral
Pin 10
Chan 2 Neutral
Pin 10
Chan 8 Neutral
Pin 11
Chan 3 Neutral
Pin 11
Chan 9 Neutral
Pin 12
Chan 4 Neutral
Pin 12
Chan 10 Neutral
Pin 13
Chan 5 Neutral
Pin 13
Chan 11 Neutral
Pin 14
Chan 6 Neutral
Pin 14
Chan 12 Neutral
Pin 15
Not used
Pin 15
Not used
Pin 16
Not used
Pin 16
Not used
Note: earth connection is via the clips on the side of the socket insert.
Note: This is the recommended wiring scheme for Wieland outputs. An alternative wiring
scheme exists for these connectors and APS units can be wired to the alternative scheme by
special order. If you order the alternative wiring then the pin-outs are listed in a separate
document that is included with your APS.
Troubleshooting
Warning: No user controls or user serviceable parts are located inside the PowerPoint. Refer all
servicing to suitably qualified personnel.
5.4 MAINTENANCE
Check that all connector screw terminals (if fitted) are tight. This must be performed by a suitably
qualified person.
5.5 TRIPPED BREAKERS
If a channel is not working check the RCBO (Residual Current circuit Breaker with Over current
protection) for that channel. If the RCBO has tripped (OFF), firstly try to determine the cause of
the breaker tripping. It could be a blown lamp or a circuit overload or and earth leakage fault.
To rectify the problem (replace the lamp or reduce the load) then restore the RCBO by pushing
it all the way down then lifting it up. If the RCBO continues to trip, refer the problem to a suitably
qualified person.
Connector 1
Connector 2

PowerPoint
Installation and Operation Manual
Page 6
6Compliance Statements
6.1 RCM COMPLIANCE
The PowerPoint from LSC Lighting Systems (Aust) Pty. Ltd. complies with the Regulatory
Compliance Mark (RCM).
6.2 CE COMPLIANCE STATEMENT
The PowerPoint from LSC Lighting Systems (Aust) Pty. Ltd. has been designed and tested to the
European Committee for Electrotechnical Standardization (CENELEC) standard –EN55022
(Information Technology Equipment).
6.3 C-TICK COMPLIANCE STATEMENT
All LSC Lighting Systems (Aust) Pty. Ltd. products with CE Compliance automatically comply with
C-Tick requirements as per Section 182 of the Radio-communications Act 1992. LSC Company
Registration number is N921.
7Specifications
Models
PWP12/10
PWP12/16
PWP6/25
Channels
12
12
6
Max Load per channel
10 Amps
16 Amps
25 Amps
RCBO
Yes
Yes
Yes
RCD/GFI Current Trip
30mA/Channel
Master Isolator
Yes
Yes
Yes
Isolator Disconnect Neutral
Yes
Yes
Yes
Three- or Single-Phase Operation
Yes
Yes
Yes
Power Indicator for each Phase
Yes
Yes
Yes
Output Connector
Options
/A
12 x 3-pin 10A Australian
outputs
N/A
6 paired Australian outlets (20A + 15A
per ch)
/P
12 x powerCON outputs
/S
12 x Schuko outputs
N/A
/T
Hardwired
/W
2 x Wieland 16-pin multi-pole outputs
N/A
/X
2 x 19-pin Socapex multi-pole outputs
N/A
/PT1
powerCON True1
Power Supply
Nominal 110-240V, 3-phase star, 50-60Hz (single-phase operation possible –63A max)
Power Input Connection
Australian models are fitted with a 3-
phase 1.2m H07 rubber 5 core x
6mmsq cable with 32A 5-pin Clipsal
plug fitted. Export models are supplied
with an M25 nickel-plated brass cable
gland and a 1.2m length of 3-phase
cable. Hardwired models are provided
with 5 screw terminals for input power.
Export models are supplied with an M25
nickel-plated brass cable gland and a 1.2m
length of 3-phase cable.
Hardwired models are provided with 5 screw
terminals for input power - no cable.
Australian models are fitted with a 3-phase 1.2m
H07 rubber 5 core x 6mmsq cable with 40A 5-pin
Clipsal plug fitted.
Export models are supplied with an M25 nickel-
plated brass cable gland and a 1.2m length of 3-
phase cable.
Hardwired models are provided with 5 screw
terminals for input power.
Case
19" 3RU Rackmount
Product Dimensions –W x D x H
483 x 300 x 132mm
19.0 x 11.8 x 5.25 inches
Shipping Dimensions–W x D x H
580 x 500 x 210mm
22.8 x 19.7 x 8.25 inches
Product Weight (Packed)
11kg
10.5kg
24.2lb
23.1lb
Shipping Weight (Aust)
12.5kg
12.5kg
Shipping Weight (Export)
15.25kg
15.25kg
33.5lb
33.5lb
Table of contents
Other LSC Power Distribution Unit manuals